The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Misc. Quality Assurance and Business Systems Related Topics


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 4th February 2000, 10:01 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,852
Thanks Given to Others: 1,892
Thanked 1,563 Times in 1,016 Posts
Blog Entries: 4
Karma Power: 604
Karma: 11544
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
I Say... Thoughts on Pragmatic Inventory Control procedures

From: "Robert Coles"
Newsgroups: misc.industry.quality
Subject: inventory control
Date: Fri, 4 Feb 2000 13:50:23 -0500
Organization: MindSpring Enterprises

Before implementing a super dupe inventory control software, I wish to goback to basics tagging, counting, signing, training... Has anyone a source for pragmatic inventory control procedures ?

Thanks

---------------snippo---------------

From: fidel12
Newsgroups: misc.industry.quality
Subject: Re: inventory control
Date: Sat, 05 Feb 2000 00:27:29 GMT

I applaud your common sense! I came from a very disciplined manufacturing enviroment that had the disciplines you mentioned(traceability, correct bill of materials, lot identification, etc) and when we went to an ERP system- it wasn't a big challange. Last year we implemented an ERP system(Oracle) in the financial company I work for that has a manufacturing operations( but didn't know it) and due to lack of manufacturing disciplines- really struggeled. Main reason was the people didn't understand the system is only as good as the data and procedures! We have overcome that. Some key learnings I can remember from both experiences are:

Inventory control systems are dependent on data- make sure your bill of materials is correct. Make sure your usage is correct or your forecast will be off.

Make sure people understand the accoutability of when material gets issued to them. Make sure they understand material movement. One funny, but real thing that happened to us was a department would finish their part of the process and move it to a shelf in the other area(like they use to) They didn't make their move transaction in the system, so the system didn't account for it.

Not sure if this helps- but thought I would share my experiences.
Reply With Quote

Sponsored Links
  #2  
Old 5th February 2000, 06:29 AM
Andy Bassett Andy Bassett is offline
An Early Cover

Registration Date: Jun 1999
Location: Donegal Ireland
 
Posts: 278
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 48
Karma: 15
Andy Bassett has less than 100 Karma points so far.
Just two brief comments.

If you do want to computerise your procurement remember three things.

.Bill of Materials
.Bill of Materials
.Bill of Materials.

Imagine your product has 400 parts, and the BoM is a super 95% accurate, that means more that 20 parts are missing, and 20 subsequent firemen action, And guess who will get the blame, the computer system.

Second point, are you sure you need a computer system, the Japanese laugh in their Saki not only at our attempts to improve quality by proceduralising/standardising everything, i also suspect that they have a bit of a giggle at our attempts to obtain better inventory control with computers.

The best systems around are Japanese ie Kanban, which is not a computer system. Incidentally the biggest user of Kanban is....McDonalds.

What is your production environment; is it mass flow production with accurate engineering data. If yes look at computers (MRP11 is arguably the direction you will go in), if no go back to basics.

Tell us a little more of your environment.



------------------
Andy B
Reply With Quote
Sponsored Links

Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Misc. Quality Assurance and Business Systems Related Topics

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Auditing Inventory Levels - Computer Count vs. Physical Inventory noboost4you ISO 9001 - Quality Management Systems Standard 40 17th January 2008 05:48 PM
Inventory Control - Inventory control flow chart for reference? AllenLee QS-9000 - American Automotive Manufacturers Standard 12 9th September 2004 03:01 PM
Salvage - Rework - Scrap: Software to control inventory - Reviews or recommendations? Michael Quality Assurance and Compliance Software Tools / Solutions 3 11th November 2003 12:19 AM
Inventory Control - only manufacture parts AFTER receipt of a purchase order Lassitude QS-9000 - American Automotive Manufacturers Standard 7 27th June 1999 12:03 PM
Inventory Control and Production Planning and QA Michael QS-9000 - American Automotive Manufacturers Standard 4 21st October 1998 01:23 AM



The time now is 02:38 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts