The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 17025 - Calibration, Measurement Gages and Test Laboratories > Gage R&R (GR&R) and MSA (Measurement Systems Analysis)


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 9th February 2000, 11:24 PM
Dawn Dawn is offline
E-Mails Invalid or Rejected

Registration Date: Sep 1998
Location: St. Marys, PA
 
Posts: 302
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 40
Dawn has less than 100 Karma points so far.
Spin! Gage R&R Study - Marking Parts, Number of Parts and Number of Operators

I believe you both are correct, as the parts are to be checked at random, but also must be identified (marked). Mark the parts with a black marker in one spot on the part; number the back of the parts; then mix them up for each operator while someone else writes them down. They are still being checked at random, but they are also being checked in the exact spot. This will give you true readings.
Reply With Quote

Sponsored Links
  #2  
Old 10th February 2000, 01:07 AM
David Drue Stauffer
Unregistered Guest

 
Posts: n/a
Spin! Gage R&R Study

I recently embarked upon a journey to write a course (ppt pres.) to teach fledgling companies how to perform Gage R&R Studies.
In my endeavor to do so, I consulted the chat rooms of net. I pulled off a discussion that said,
"A typical Gage R&R study involves three operators taking two measurements of ten "identical" parts. The unlabeled parts should be passed to the operator in random order so that there is no bias when performing the measurements. It is important that the operator is not aware of which part they are measuring so that no attempt can be made to try to replicate the previous measurement.

After all of the measurements have been made, a series of calculations is performed to determine the % R&R. This value reflects how effective the measurement system is. A % R&R of less than 30% is considered to be acceptable by most industry standards."

When I learned to do R&R studies, I believe in accordance with AIAG, I understood that ten parts that were selected from a manufacturing process were to "labeled" 1-10, and a spot marked on each part as to the location the measurement was to take place in order to isolate gage system error from part process error!

It seems that if the parts were measured at random in random order from operator to operator, that this would introduce a sizable amount of variation into the equation that would make the grand average numbers quite high causing the resulting percentages to escalate! Also, 10% is the acceptable limit, not 30. 11-30 is acceptable ONLY based upon the application, in other words it has to be monitored closely. 31% and above would be unnacceptable under any conditions.

The above mentioned excerpt was from Ingersoll-Rand's Athens, PA plant that produces power tools.

If you have any comments or solution to either my or their understanding of how the R&R is to be conducted, please comment!

Dave S.
Reply With Quote
Sponsored Links

  #3  
Old 10th February 2000, 10:07 AM
Laura M's Avatar
Laura M Laura M is offline
Courtesy Access

Registration Date: Aug 1999
Location: Rochester, NY US
 
Posts: 759
Thanks Given to Others: 3
Thanked 17 Times in 15 Posts
Karma Power: 70
Karma: 656
Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.
Send a message via AIM to Laura M Send a message via Skype™ to Laura M
I would add that the "measurement system" is being evaluated. If the parts can't be measured in the "exact same spot" when the gage is used in production, then you shouldn't specify where to measure for gage error. You may want to do that for diagnostic purposes...is it the gage or the process, but don't fool yourself. "Measurement System Analysis" isn't getting a gage to pass R&R.
Reply With Quote
  #4  
Old 10th February 2000, 06:50 PM
David Drue Stauffer
Unregistered Guest

 
Posts: n/a
Marc
I believe the idea here is to evaluate how much of "process error" is due to "measurement error". To isolate the measurement error from the process error for a particular characteristic such as overall length of the part, and a 0.001" resolution caliper is being used to measure the length with a tolerance of say +/- .005". Then an R&R study would be in order to discover if perhaps the gage being used is sufficient to achieve the required capability indexes. My point is that to reduce or isolate "part variation" as much as possible from the R&R result, that the "at random parts" should be measured at the same place for each trial AND for each operator. I could be wrong here, but that's the way I learned it some years ago.
Thanks for your response.
Dave.
Reply With Quote
  #5  
Old 27th February 2000, 09:30 PM
Batman
Unregistered Guest

 
Posts: n/a
Hi Dave!

I think you are thinking correctly, but perhaps not stating correctly.

The random thing:
The parts are numbered 1-10, and each part's measurement is recorded on the log as it's measurement. Part #1 readings ALWAYS gets entered in part #1's line. This is for the first reading for the first operator as well as the last reading for the last operator. The procedure as stated in the AIAG is to give each operator the numbered parts in random order. That way part #1 is not always the first part measured, part #2 is not always the second, etc.

The spot marking thing:
Since the Gage R&R is to determine the measurement system - operator and gage - error, it is necessary if your parts are in any way irregular. Later, when the measurement system is deemed acceptable, you can then determing just how irregular your parts are, and that is when it is appropriate to measure the irregularity. Adding part variation to the measurement system evaluation is not good practice. Unless your parts are or are equal to NIST standards, it certainly appropriate to mark a spot on the parts.
Reply With Quote
  #6  
Old 27th February 2000, 10:22 PM
Laura M's Avatar
Laura M Laura M is offline
Courtesy Access

Registration Date: Aug 1999
Location: Rochester, NY US
 
Posts: 759
Thanks Given to Others: 3
Thanked 17 Times in 15 Posts
Karma Power: 70
Karma: 656
Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.
Send a message via AIM to Laura M Send a message via Skype™ to Laura M
I agree that part variation shouldn't be "included" in a gage r&r, but if the r&r is done in different circumstances than it is used on the floor, it may not provide an accurate measurement. I've been involved in situations where gage engineers were telling how we could get a gage to pass..."hold the part here," "it takes getting used to", etc. So my point was, don't "get a gage to pass", make it realistic because otherwise it can get into production and you may be falsely accepting or rejecting parts.
Reply With Quote
  #7  
Old 12th March 2000, 01:49 AM
Batman
Unregistered Guest

 
Posts: n/a
BIG Smile

Yup, get an engineer into a discussion of whether a part is good or not and the first thing they ask is "How'd you measure that?" particularly if you did not consult them first when picking the gage.

So, get them into the discussion during the planning stage of the GR&R. Let them tell "how to hold" and "get used to..." Then do the R&R. If a gage is one of those "get used to..." types, I make sure the parts are marked so the only error is the operator not used to the gage. Then I go back and ask for a more user friendly gage. Sometimes I even get the engineers to participate. Graph that some time and discover how well your operators are measuring and who should not be measuring parts.

Seriously, you should not (to the extent possible) include any part deformity in the variation calculations when performing a GR&R. If there is part deformity it will be better detectable by a reliable measurement system. You may reject a good measurement system based on poor parts, when what you really want is a measurement system that will detect poor parts.
Reply With Quote
  #8  
Old 13th March 2000, 09:47 AM
David Drue Stauffer
Unregistered Guest

 
Posts: n/a
Thumbs up

Batman, I totally agree, as I have done extensive search since I originally posted my topic, this clearly solidifies the process in my mind.
My first training class was on GR&R, & was a success, the customer left well pleased, so much so that a sister company of theirs has now booked for the same training plus a Metrology class as well.
Thanks to all of you who responded for your help. This is a great source of information and discussion of ideas. Dave
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 17025 - Calibration, Measurement Gages and Test Laboratories > Gage R&R (GR&R) and MSA (Measurement Systems Analysis)

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Gage R&R: Selecting Number of Trials and Appraisers and Parts Geets Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 11 22nd July 2008 02:30 AM
MSA and Number of operators - BSI auditor: 3 operators must be used for Gage R&R DJN Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 10 7th March 2006 09:02 PM
Does Cpk analysis make sense on this study? Number of packaged parts per bundle Link Xue SPC Monitoring and Statistical Analysis Techniques 14 31st January 2006 01:53 PM
Minumim number of parts to conduct the Process Capability Study Eduardo APQP and PPAP 18 22nd December 2004 05:17 PM
Gauge R & R - What is the requirement for number of operators in study? DJN ISO/TS 16949 - International Automotive Quality Systems Standard 4 29th October 2004 10:01 AM



The time now is 02:32 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts