The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Misc. Quality Assurance and Business Systems Related Topics


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 13th February 2000, 05:36 AM
Alan Cotterell
Unregistered Guest

 
Posts: n/a
Read This! Maturity Model of Organisations - Administrative Risk Control And CI

Administrative Risk Control And Continual Improvement

The Maturity Model of Organisations

If you question middle managers and tradespeople in an organisation, you will often discover that its history has been quite chaotic. Usually the organisation has started as a one-person business, or has been set up by government in an unplanned manner.

‘Crisis management’ is still the norm in many large organisations, and can be accompanied by a quite undesirable organisational culture.

The use of a systematic approach to management can provide the impetus for the organisation to ‘mature’. The ‘maturity model of organisations is as follows:

Initial level (chaos) - there is no documented management system and ‘crisis management’ prevails.
Managed level - ‘managers’ are employed and the organisation is managed on an ad hoc basis. Duties may be delegated.
Planned level– organisational activities are planned, and a documented management system may be introduced (e.g. Quality Management System).
Integrated level – an integrated management system is implemented to manage critical risk areas (quality, safety, environment, security). Appropriate administrative risk control is implemented for all risk areas.
Optimised level – Administrative risk controls are subject to continual improvement, making the organistion resposive to its external and internal environments. Development is sustainable.
It is considered that many Australian organisations have achieved the ‘planned ‘ level of maturity. Australian Standard 4581:1999 Management System Integration has been published, however most organisations are probably not aware of its existence. Some organisations are attempting to achieve the ‘integrated’ level. No organisation has achieved the ‘optimised’ level.

Continual improvement

Improvement of work practices, where there is no administrative risk control is very difficult. Administrative risk control involves the documentation of work practices as ‘procedures’, this makes the process ‘visible’.

If work practices are not documented, they are subject to change at the whim of managers and others. It is quite common in organisations at the initial and managed levels to manage risk on an ad hoc basis. Managers often make what are properly, policy decisions, often without reference to established standards, and in ignorance of the law, which calls up these standards.

Continual improvement can be achieved as follows:

Active intervention – the manager monitors the workplace, and by inspection determines improvements to processes.
Employee Suggestion Scheme – a system of requesting suggestions from employees is used to return information on problems to management personnel, who theoretically introduce improvements.
Auditing – auditing which is performed intelligently can detect procedural and policy ‘nonconformances’, and by interaction with employees find solutions to problems, which reduce efficiency in the organisation.
Opportunity for Improvement Report – Where there is a documented management system, nonconformance are usually reported using a Nonconformance (Opportunity for Improvement) Report. This report is the mechanism for formally addressing concerns. Certifying bodies usually check to see that the reports are appropriately ‘closed out’, when conducting ‘third party’ audits.
Complaints Handling – Customer complaints offer great opportunities to improve organisational performance, and deliver a better product or service. Australian Standard AS4269 – Complaints Handling provides further information in this area.
Total Quality Management – problem solving, through team based activities, offers probably the greatest means of improving organisational performance. To be effective gains achieved through TQM must be ‘locked in’, by updating management system documentation.
Total Quality Management

The TQM problem solving activity is based on the Plan, Do, Check, Act cycle.

Plan – an improvement to a system or process is planned. This usually involves documenting the process ‘warts and all’, ‘imagineering’ how the process should be performed, and planning changes to the system or process.
Do – the changes to the system or process are implemented on a trial basis, and the results monitored.
Check – the effects of the system or process change are evaluated (using statistics), to see that an improvement has actually been achieved, and that other processes have not been adversely affected.
Act – process and system documentation is updated to ‘lock in’ the changes, and provide a basis for audit. This documentation aspect is known as administrative risk control (which controls operational risk, (quality, safety, environment, security)). It is the subject of the ‘Process Control’ element of AS/NZS ISO 9001.
Nonconformance (Opportunity for Improvement) Report

This report provides means by which system and procedural nonconformances, can be formally addressed by management. Nonconformances can be detected through audit activities, customer complaints or may simply be reported by workers ‘at the coal face’.

It is essential that workers have a mechanism to have their concerns formally addressed, other than resorting to union activity. The implementation of TQM in an organisation should reduce the need for use of the report by team members. However where ‘directive’ management systems prevail, there is often no way for workers to advise the Chief Executive Officer of problems.

This effectively causes ‘lack of control’, over the work activity by the worker, and amongst other things, causes a stressful situation to exist.

An example of this phenomenon occurs in ‘telephone call centres’, where staff may be reduced by management decision, leaving the operator to deal with irate customers, who have been waiting several minutes. It also occurs in hospitals, where medical staff are not empowered to complain about conditions which adversely affect patients.

Industrial Democracy

To date industrial democracy in Australia has been representative democracy, that is, to have concerns addressed by management the worker must join a union, and request the union representative to act on his/her behalf. The use of the Nonconformance (Opportunity for Improvement) Report, and TQM offer a means of implementing participative democracy.

The implementation of participative democracy involves changing the paradigm to one, which is risk conscious, proactive, and empowering. This can be achieved by:

Implementing a documented management system based on AS4581, AS/NZS ISO 9000, AS/NZS ISO 14000, AS 4804 , so that workers can essentially self manage.
Introducing the use of the Nonconformance (Opportunity for Improvement) Report.
Implementing Employee Share Ownership to provide the motivation for workers to improve systems and procedures.

Alan Cotterell

18th September 1999
Reply With Quote

Sponsored Links
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Misc. Quality Assurance and Business Systems Related Topics

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Capability Maturity Model (CMM) for Manufacturing Brian Hunt Misc. Quality Assurance and Business Systems Related Topics 12 3rd July 2008 04:25 PM
How do I learn CMMI (Capability Maturity Model Integration)? someshvar Software Quality Assurance 4 29th August 2007 08:32 AM
CMMI in Software - Capability Maturity Model Integration Marc Software Quality Assurance 20 20th August 2004 05:08 PM
People Capability Maturity Model - PCMM v2.0 - Seeking Procedure Examples venkat Documentation Control Systems, Procedures, Forms and Templates 1 3rd August 2004 10:16 AM
Who designed the Capability maturity model and approx when? john smith Software Quality Assurance 1 7th March 2001 01:28 AM



The time now is 05:42 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts