The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Management Review Process


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 25th August 2005, 10:20 PM
lance lance is offline
E-Mails Invalid or Rejected

Registration Date: Aug 2005
Location: Texas
 
Posts: 6
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 10
lance has less than 100 Karma points so far.
Question ISO 9001:2000 Management Review for multi-site division - Is it possible?

Is it possible:
a) to have a division manager run the management review for his division at his own site with participation from all his direct reports (who work in many geographic sites), rather than
b) have each site designate a person to run management reviews locally at that site in addition to the central management review?

The division manager's direct reports each has responsibilities at multiple sites. Each site has part of the team for several different departments. In this case, I think the most logical way to consolidate and manage information is to have the direct reports present the information on their area of responsibility at a central review run under the direction of the division manager. Because of the matrixed nature of our organization, this seems more logical than trying to run separate management reviews at each site (with pieces of several departments participating in the local reviews).

I would appreciate feedback on whether the approach I outline above is allowed by ISO 9001:2000.
Reply With Quote

Sponsored Links
  #2  
Old 26th August 2005, 01:25 PM
Miner's Avatar
Miner Miner is offline
Forum Moderator

Registration Date: Apr 2002
Location: Wisconsin
 
Posts: 1,840
Thanks Given to Others: 166
Thanked 670 Times in 457 Posts
Blog Entries: 9
Karma Power: 251
Karma: 9207
Miner is appreciated, and has over 1700 Karma points.Miner is appreciated, and has over 1700 Karma points.Miner is appreciated, and has over 1700 Karma points.
Miner is appreciated, and has over 1700 Karma points.Miner is appreciated, and has over 1700 Karma points.Miner is appreciated, and has over 1700 Karma points.
Default

The standard is pretty flexible on the format of a management review. It can be comprised of daily, weekly, monthly or yearly meetings or at a local/division level. Ultimately, an auditor will look at the effectiveness of the management review for the local site being audited. This will be harder to do (not impossible) if the division review is the only review.

I am in a similar situation as the one that you describe. Our MR is comprised of monthly reviews of metrics and corrective actions at the local level. Once a year, one of these monthly meetings is expanded to address all remaining items required by the standard. The division holds a higher level review twice a year that reviews items that affect the division as a whole, major local issues such as resource needs, or centralized quality system issues. This has worked very well for us and has easily passed audits.
Reply With Quote
Sponsored Links

  #3  
Old 30th August 2005, 12:04 PM
SSwanson SSwanson is offline
Inactive Registered Visitor

Registration Date: Aug 2005
Location: Essen, Germany
 
Posts: 18
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 18
Karma: 10
SSwanson has less than 100 Karma points so far.
Default

I once asked the Director of a major certification company if a management review was necessary at every location of a multi-sited company.

His answer was that local Management Reviews were not mandatory but the system will be weakened if they are not conducted locally.

As a consultant, I always suggest local management reviews.

As an auditor, I have found that nearly all (99.9%) the mult-sited companies that I have audited (approximately 1000 in 15 different countries) have local as well as National / Global Management Reviews.

If someone asks why a local review is necessary, I usually reply that a local Management Review is not necessary. However, how does Executive Management in another city, country or continent know what the status of the quality system is at the local level if no local reviews are conducted? If the answer is that the local manager / director / CEO will inform top management during the Global Management Review, I will ask how the local manager knows what his department managers think of the QMS. The point is, you have to have local feedback before you can pass good information higher.

Perhaps it is best to remember the purpose of the management review - To evaluate the effectiveness of the Quality System. So long as you have done that, the auditor should be satisfied. The real question is - Has your organization benefited from the Management Review?
Reply With Quote
  #4  
Old 9th September 2005, 01:03 PM
lance lance is offline
E-Mails Invalid or Rejected

Registration Date: Aug 2005
Location: Texas
 
Posts: 6
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 10
lance has less than 100 Karma points so far.
Default

Thanks for the responses. It sounds like the standard is pretty flexible, with the bottom line being that an auditor will expect to see evidence of the effectiveness of the management review.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Management Review Process

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Multi-Division QMS Certification - Pros & Cons Jeff Putman ISO/TS 16949 - International Automotive Quality Systems Standard 16 29th September 2009 10:51 AM
Multi-site, multi-language documentation pbojsen Documentation Control Systems, Procedures, Forms and Templates 1 5th June 2008 03:18 PM
ISO14001 - Company Wide Procedures - Multi-national & Multi-site Bookham ISO 14001 and Environmental Related Standards 7 23rd November 2005 11:42 AM
ISO 9001:2000 Document Review Tomorrow Rachel ISO 9001 - Quality Management Systems Standard 32 10th June 2004 01:29 PM
Management Review in ISO 9001:2000 Scott Management Review Process 29 24th February 2002 11:20 AM



The time now is 07:40 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts