The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Lean - Lean in Manufacturing and Services


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 11th September 2005, 08:39 PM
Augus Augus is offline
Inactive Registered Visitor

Registration Date: Jan 2005
Location: California
 
Posts: 8
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 20
Karma: 10
Augus has less than 100 Karma points so far.
Question Supermaket container label sample? Implementing Kaizen for one product line

Our company just implementing Kaizen for one of our product line. Which include 10 sub-assemblies and kit together at shipping.

We are setting up suppermarket which include raw material from stock and cut pieces from cutting department. I would like to get example or suggestion of what information need to be on the label of those cut part from cutting department when place on the suppermarket rack.

Thanks.
__________________
Augus
Reply With Quote

Sponsored Links
  #2  
Old 12th September 2005, 03:08 AM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

Registration Date: Sep 2003
Location: Illinois
 
Posts: 7,535
Thanks Given to Others: 182
Thanked 1,127 Times in 762 Posts
Karma Power: 397
Karma: 11090
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by Augus

Our company just implementing Kaizen for one of our product line. Which include 10 sub-assemblies and kit together at shipping.

We are setting up suppermarket which include raw material from stock and cut pieces from cutting department. I would like to get example or suggestion of what information need to be on the label of those cut part from cutting department when place on the suppermarket rack.

Thanks.
I don't mean to burst your bubble about "Lean." (I am, after all, a charter member of the Lean Manufacturing Division of ASQ.)

I think someone is using "overkill" in ascribing this process to a "kaizen" initiative.

Simply stated, what you want and need is a brief session in "mistake proofing" to assure the workers can assemble the components of the kit without duplicating or leaving any item out of the kit.

Without seeing your operation and the various components of the kit, I can't give you a concrete plan, but I assure you that labeling of bins that hold the items or labeling of the items themselves is secondary to assuring the assembly flow reduces the possiblity of a kit assembler taking two items from the same bin or omitting one item from another bin.

Here's an example of a mistake proofing system for kitting I have seen:
there are ten total items in the kit,
but the ten include
  • one each of A, B, C, D,
  • two of E and
  • four of F
They created TEN bins to draw from, with TWO bins of E and FOUR bins of F, so the assembler takes one from each bin instead of keeping count of how many E's or F's are drawn.

Alternately, they could have had two sub-kit lines where the TWO E items were put into a sealed package and the FOUR F items put into another package so that the final kitting line would have SIX bins, with the E and F bins filled with sealed packs of the proper quantity. This would work extremely well if E and F came from separate suppliers who could be contracted to supply the components in portion-controlled bags.

In the final analysis, does the kit assembler really need to read a label and know the part number of each item if he is dealing with either 6 or 10 bins of components?

Heck, this would be an ideal line for a blind person to work at!
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
Reply With Quote
Sponsored Links

  #3  
Old 12th September 2005, 08:02 AM
wmarhel wmarhel is offline
Courtesy Access

Registration Date: Oct 2004
Location: DuBois, PA
Age: 39
 
Posts: 612
Thanks Given to Others: 109
Thanked 234 Times in 149 Posts
Karma Power: 94
Karma: 3086
wmarhel is appreciated, and has over 1700 Karma points.
wmarhel is appreciated, and has over 1700 Karma points.
Default As Big As You Can.....

Quote:
Originally Posted by Augus

Our company just implementing Kaizen for one of our product line. Which include 10 sub-assemblies and kit together at shipping.

We are setting up suppermarket which include raw material from stock and cut pieces from cutting department. I would like to get example or suggestion of what information need to be on the label of those cut part from cutting department when place on the suppermarket rack.

Thanks.
Your labeling could be as simple as color-coded bins alongside a chart which contains the the color codes and what they mean. This could also assist in allowing you to "pull" exactly what you need from the cutting department.

As far as labels, the following information can commonly be found included, but it really depends on your operation and your needs:

1) Part Number
2) Quantity held for bin (how many the cutting department should put in when replenishing)
3) Storage Location
4) Replenishment Location (Work-Cell that will fill the bin)

I would recommend you make the labels as big as possible. Use high contrast if you can, say flourescent yellow labels with black print. Use signs above the supermarket location to identify it as a unique storage area.

Good Luck,

Wayne
Reply With Quote
  #4  
Old 12th September 2005, 10:10 AM
Jim Wynne's Avatar
Jim Wynne Jim Wynne is online now
Courtesy Access

Registration Date: Jan 2005
Location: Southeast Wisconsin
Age: 57
 
Posts: 9,214
Thanks Given to Others: 755
Thanked 2,295 Times in 1,549 Posts
Karma Power: 611
Karma: 20390
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by Wes Bucey

I don't mean to burst your bubble about "Lean." (I am, after all, a charter member of the Lean Manufacturing Division of ASQ.)

I think someone is using "overkill" in ascribing this process to a "kaizen" initiative.

Simply stated, what you want and need is a brief session in "mistake proofing" to assure the workers can assemble the components of the kit without duplicating or leaving any item out of the kit.

Without seeing your operation and the various components of the kit, I can't give you a concrete plan, but I assure you that labeling of bins that hold the items or labeling of the items themselves is secondary to assuring the assembly flow reduces the possiblity of a kit assembler taking two items from the same bin or omitting one item from another bin.

Here's an example of a mistake proofing system for kitting I have seen:
there are ten total items in the kit,
but the ten include
  • one each of A, B, C, D,
  • two of E and
  • four of F
They created TEN bins to draw from, with TWO bins of E and FOUR bins of F, so the assembler takes one from each bin instead of keeping count of how many E's or F's are drawn.

Alternately, they could have had two sub-kit lines where the TWO E items were put into a sealed package and the FOUR F items put into another package so that the final kitting line would have SIX bins, with the E and F bins filled with sealed packs of the proper quantity. This would work extremely well if E and F came from separate suppliers who could be contracted to supply the components in portion-controlled bags.

In the final analysis, does the kit assembler really need to read a label and know the part number of each item if he is dealing with either 6 or 10 bins of components?

Heck, this would be an ideal line for a blind person to work at!
Very good advice, but another consideration for labeling is restocking the bins, and assuring that the blind guy doesn't have to worry about having the correct parts.
__________________
Some men are born mediocre, some men achieve mediocrity, and some men have mediocrity thrust upon them.-- Joseph Heller
Reply With Quote
  #5  
Old 13th September 2005, 05:17 AM
asutherland's Avatar
asutherland asutherland is offline
E-Mails Invalid or Rejected

Registration Date: Aug 2005
Location: Georgia, USA
 
Posts: 125
Thanks Given to Others: 0
Thanked 5 Times in 5 Posts
Karma Power: 0
Karma: 343
asutherland is appreciated, and has over 300 Karma points.asutherland is appreciated, and has over 300 Karma points.asutherland is appreciated, and has over 300 Karma points.asutherland is appreciated, and has over 300 Karma points.
Default

Very good advice, but another consideration for labeling is restocking the bins, and assuring that the blind guy doesn't have to worry about having the correct parts.[I]

Exceptional example Wes. and excellent analysis for restocking. Not much more to add except that if the space is available have either the actual part or picture of the part on the restocking side so that comparisons can be easily made to not put the wrong part in the wrong bin.

If working with various combination of kits, you can color code the variations. (Dont forget to check that the people pulling the kits are not color blind).
Reply With Quote
  #6  
Old 13th September 2005, 11:40 AM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

Registration Date: Sep 2003
Location: Illinois
 
Posts: 7,535
Thanks Given to Others: 182
Thanked 1,127 Times in 762 Posts
Karma Power: 397
Karma: 11090
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Default

You are correct, of course. I was focusing on mistake proofing the kit assembler. Certainly, good practice would dictate also looking at mistake proofing the process of supplying the bins.

Hey! That's why kaizen events have achieved some success:
Many eyes looking at a situation from many angles.
I still prefer the terms "brainstorming" or "improvement" to "kaizen."

An acquaintance, Akio Miura, a top Quality consultant and one of the ASQ stalwarts in Japan, is simply death on the term "kaizen" which he explains is poorly translated. He also decries the term "poka yoke" as similarly mistranslated. I think I'll ask him to join us here in the Cove. At the very least, I'll get permission to post one of his diatribes about the two terms - it should prove quite an eye opener to folks who assume anything and everything to do with Japanese manufacturing is top notch Quality.
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Lean - Lean in Manufacturing and Services

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Kaizen event for the final QA inspection process - Kaizen help shanomatic Lean - Lean in Manufacturing and Services 7 12th June 2008 10:21 AM
Implementing Kaizen in a Construction Company MDWEEK Various Other Specifications, Standards, and related Requirements 6 12th December 2007 03:11 AM
Kaizen practitioners in Los Angeles? Come into my plant and execute Kaizen events ComptonCA Lean - Lean in Manufacturing and Services 8 7th August 2007 04:06 AM
Implementing a Pull System in a manufacturing line? Lessons Learned? johnnybegood Manufacturing and Related Processes 8 24th January 2005 10:11 PM
Shipping Container Identification - Electronic modules that have 3 types of container Penny Treadwell ISO/TS 16949 - International Automotive Quality Systems Standard 4 31st October 2003 02:16 PM



The time now is 11:34 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts