The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Misc. Quality Assurance and Business Systems Related Topics


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 13th July 2000, 08:13 AM
Don Reid
Unregistered Guest

 
Posts: n/a
Clown Production before Quality - Is the Customer Always Right?

I would be interested to hear if others have had a similar problem to one that I am experiencing at present. The scenario is this;

One of our major customers has resourced several components in our favour. From discussions with the customer we agree timing plans for pre production to prove the tooling, initial sampling and then full production. No problem!

Subsequently, during this period, the customer declares they are suffering from a “stock loss” (they cannot find them) and their production line will stop very soon if we do not supply parts.

Naturally, we do everything humanly possible to help.

The parts have two post manufacturing operations (hardening followed by phosphating). The parts leave our works and are sent for the above treatment. They do not return to us: they are despatched from our subcontractor to our customer. This is at the express instruction of our customer as they are desperate for the parts.

Here is the problem: Several departments within our customers’ premises do not adequately communicate. Consequently, within a few hours of the parts being received by the customer, their QA blokes are on to me asking why I am submitting parts without sample approval. I cannot possibly do this as the dimensional aspects of the components have to be measured in the post treatment state. In addition, I need to verify hardness and phosphating. I cannot do this if I do not have the parts.

Conversations with the customer have not helped. They admit the problem is of their own making yet their QA department will not remove the demerits awarded for shipping non approved parts. Worst of all, they expect me to submit corrective and preventive action plans regarding how I can stop this happening!!

I did submit one that laid the blame firmly at their door. Their reaction was so severe, and went to such a level, that I am surprised I still have a job.

Incidentally, the customer is registered to QS9000.

The customer is always right?


Don Reid.
Reply With Quote

Sponsored Links
  #2  
Old 13th July 2000, 08:51 AM
Don Watt
Unregistered Guest

 
Posts: n/a
Clown

Hi Don,
I've never experienced a problem like this one and I symapathise with your plight with such a seemingly "pig-headed" customer.

How have you adressed the issue with your sub-contractor, surely they are at fault for despatching what is your product (contract between you/sub-con) to your end customer?
Reply With Quote
Sponsored Links

  #3  
Old 13th July 2000, 08:57 AM
Don Reid
Unregistered Guest

 
Posts: n/a
Angry

Yep..

the subcontractor also treats parts made directly by our customer and they will simply "do as they are told". They cannot afford to lose the business any more than we can.
Reply With Quote
  #4  
Old 13th July 2000, 09:07 AM
Jim Biz's Avatar
Jim Biz Jim Biz is offline
Forum Moderator

Registration Date: Mar 2000
Location: MID-WEST USA
 
Posts: 486
Thanks Given to Others: 0
Thanked 4 Times in 3 Posts
Karma Power: 51
Karma: 114
Jim Biz is appreciated, and has over 100 Karma points.Jim Biz is appreciated, and has over 100 Karma points.
Question

As I read this you "may" have a couple of options.. (we have similar situations at times) Is it possible your customer has an internal communication/cooperation problem he wants you to solve?

MAYBE? - contact your subcontractor have him return to you "sample parts" for your layout from the lot in question. - Then you will at least be able to explain to the customers Qa folks where & when the documentation will be available.

OR? Explain to your subcontractor that the parts can not be shipped without layout docs. so they need to send you copies on final characteristics and their operations before shipment to the customer.

Regards
Jim
Reply With Quote
  #5  
Old 13th July 2000, 09:18 AM
Geoff Cotton's Avatar
Geoff Cotton Geoff Cotton is offline
Courtesy Access

Registration Date: Jun 2000
Location: Travelling around Europe
Age: 53
 
Posts: 191
Thanks Given to Others: 4
Thanked 4 Times in 4 Posts
Karma Power: 42
Karma: 27
Geoff Cotton has less than 100 Karma points so far.
The Hat

We have been through this mine field with automotive customers and lost. Now we don't move from the contract/standard without a waiver signed by them. I'm sure this is what it probably says in your own Quality System.

Regards

Geoff
Reply With Quote
  #6  
Old 13th July 2000, 09:24 AM
Spaceman Spiff's Avatar
Spaceman Spiff Spaceman Spiff is offline
Inactive Registered Visitor

Registration Date: Mar 1999
Location: FL
Age: 44
 
Posts: 73
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 45
Karma: 10
Spaceman Spiff has less than 100 Karma points so far.
I Say...

I will throw my 2 cents worth in. If the customer is QS9K, then most likely they will require PPAP. In that case layout would not suffice. I had experienced a similar situation (but the customer wasn't so obtuse). We submitted deviation (i.e., SREA) for the engineering department to approve. The shipment was referenced to that SREA number and off we went. Several weeks later we submitted PPAP. And everyone lived happily ever after.
Reply With Quote
  #7  
Old 13th July 2000, 09:39 AM
Don Reid
Unregistered Guest

 
Posts: n/a
Angry

Jim,

your option of our subcontractor supplied a sample back to us is what we do, we have no other way at the moment of getting parts ultimately sample approved. The main issue is one of distance. The subcontractors plant is less than half a mile from the customer and, in fact, used to be owned by our customer until they "rationalised" the business.

Spaceman,

if we had time we would, but the customer reduces the allowed time because of their screw up. On one occasion we agreed a timing plan that allowed three weeeks (ample). The next day they told us they needed finished parts within 48 hours.

Geoff,

tried the waiver approach, and indeed our QA system stipulates this. The problem is compounded by getting someone to sign the bloody thing. No-one will take the responsibility.

however, the bit that really pisses me off is when it suits them they quote QS9000. When it doesn't suit them..............

It should also be noted that the customer in internationally known, they are not some small fly by night outfit, even though they act as such!

I am not so naive to beleive that corners are not cut when it is expedient to do so, but common sense must also prevail.

Perhaps the forum lads should all get together and draft a standard of our own, something along the lines of:

ISO 25000:2000 A common sense guide to dealing with idiots.




[This message has been edited by Don Reid (edited 13 July 2000).]
Reply With Quote
  #8  
Old 13th July 2000, 04:27 PM
Daniel J. Rupright
Unregistered Guest

 
Posts: n/a
Thumbs up

Finally somebody with the same problem!

This needs to go to the top brass at your plant.

Have them contact the culprit putting you in this situation.

You need a massive waiver from them.

We have delt with this exact problem.

We're QS certified which requries 100% on-time delivery.

If the customer calls today stating that they lost,mis-counted, scrapped parts that they need. This can make you late.

How 'bout that?
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Misc. Quality Assurance and Business Systems Related Topics

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Customer Property Logs - Tracking customer property, specifically production tooling Neil V. ISO/TS 16949 - International Automotive Quality Systems Standard 5 18th August 2009 09:18 AM
AS9102 lapse in production requirements - Customer FAI request Iain Crump AS9100 Aerospace Standard and Requirements 7 11th November 2008 08:38 AM
Production Accountability - Instilling Quality Values in the Production Workers domingue AS9100 Aerospace Standard and Requirements 12 3rd January 2008 04:41 PM
Identifying production dies to satisfy the 7.5.4 Customer Property clause Ken11 ISO 9001 - Quality Management Systems Standard 7 26th May 2006 01:39 AM
Customer-Owned production tooling - TS 16949 Clause 7.5.4.1 Mahosky ISO/TS 16949 - International Automotive Quality Systems Standard 6 21st November 2005 08:02 PM



The time now is 09:47 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts