The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > APQP and PPAP
Forum Username


Elsmar Cove Forum Sidebar
Custom Search
Monitor the Elsmar Forum
Monitor New Forum Posts
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Sponsor Links







Donate and $ Contributor Forum Access
Sponsored Links
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's
International Quality Services

Atul's
Symphony Technologies

Marcelo Antunes'
SQR Consulting

Bob Doering's
Correct SPC - Precision Machining


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality

Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 26th September 2005, 10:31 AM
Gilberto Gilberto is offline
Well

 
Registration Date: Sep 2005
Location: Brazil
 
Posts: 65
Thanks Given to Others: 2
Thanked 1 Time in 1 Post
Karma Power: 38
Karma: 15
Gilberto has less than 100 Karma points so far.
Send a message via MSN to Gilberto
Thumbs up CAS No. - PPAP (I.3 and I.3.1 - requisite 8)

As treatment the submission of PPAP (I.3 and I.3.1 - requisite 8) of material Granery for products with CAS to number equal but supplying different, will be that it is really necessary.

Sponsored Links
  #2  
Old 26th September 2005, 03:29 PM
Jim Wynne's Avatar
Jim Wynne Jim Wynne is offline
Cross Forum Moderator

 
Registration Date: Jan 2005
Location: Southeast Wisconsin
 
Posts: 13,332
Thanks Given to Others: 1,779
Thanked 5,352 Times in 3,430 Posts
Blog Entries: 2
Karma Power: 1445
Karma: 39204
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Quote:
In Reply to Parent Post by Gilberto

As treatment the submission of PPAP (I.3 and I.3.1 - requisite 8) of material Granery for products with CAS to number equal but supplying different, will be that it is really necessary.
The question isn't clear, but it appears that what you're asking is that if you supply a bulk material with a certain CAS number, and you want to substitute a different but equivalent material with the same CAS number, is it necessary to submit a new PPAP?

If that's the question, I think you want to be looking at Table I.3.3 and #7 (page 14 of the 3rd Edition AIAG PPAP Manual). Although I have no experience with PPAP for bulk materials, it appears to me that not only is PPAP not required, but notification isn't required either.
__________________
We aim to please. You aim too, please.
Sponsored Links

  #3  
Old 27th September 2005, 03:47 PM
Gilberto Gilberto is offline
Well

 
Registration Date: Sep 2005
Location: Brazil
 
Posts: 65
Thanks Given to Others: 2
Thanked 1 Time in 1 Post
Karma Power: 38
Karma: 15
Gilberto has less than 100 Karma points so far.
Send a message via MSN to Gilberto
Sorry !
it is accurately this that I want to know !
Tks.

I have one doubt ! In case of different suppliers ?
Therefore this would be another place of production ! I need be submit the PPAP ?

Tks !
  #4  
Old 27th September 2005, 03:51 PM
Jim Wynne's Avatar
Jim Wynne Jim Wynne is offline
Cross Forum Moderator

 
Registration Date: Jan 2005
Location: Southeast Wisconsin
 
Posts: 13,332
Thanks Given to Others: 1,779
Thanked 5,352 Times in 3,430 Posts
Blog Entries: 2
Karma Power: 1445
Karma: 39204
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Quote:
In Reply to Parent Post by Gilberto

Sorry !
it is accurately this that I want to know !
Tks.

I have one doubt ! In case of different suppliers ?
Therefore this would be another place of production ! I need be submit the PPAP ?

Tks !
Look at the same table I referred you to in the earlier post. In instances of "New source of raw material that has no Special Characteristics" there's no need to submit or notify.
__________________
We aim to please. You aim too, please.
  #5  
Old 27th September 2005, 07:34 PM
Caster's Avatar
Caster Caster is offline
An Early Cover

 
Registration Date: Jul 2003
 
Posts: 924
Thanks Given to Others: 204
Thanked 214 Times in 155 Posts
Karma Power: 139
Karma: 3279
Caster is appreciated, and has over 1700 Karma points.
Caster is appreciated, and has over 1700 Karma points.Caster is appreciated, and has over 1700 Karma points.Caster is appreciated, and has over 1700 Karma points.
Changes in the new PPAP

Quote:
In Reply to Parent Post by JSW05

Look at the same table I referred you to in the earlier post. In instances of "New source of raw material that has no Special Characteristics" there's no need to submit or notify.
I was at Autotech 05 recently. The "new" version of PPAP changes all the rules.

There was a lot of unhappiness from the bulk material guys because it looks like the big 3 have changed back to "always do a PPAP for any change". The reasons not to submit table is gone in the new version.

Maybe I understood wrong, or perhaps it will change before we see the new version, but there were some very unhappy folks in the audience.
  #6  
Old 28th September 2005, 06:34 AM
Gilberto Gilberto is offline
Well

 
Registration Date: Sep 2005
Location: Brazil
 
Posts: 65
Thanks Given to Others: 2
Thanked 1 Time in 1 Post
Karma Power: 38
Karma: 15
Gilberto has less than 100 Karma points so far.
Send a message via MSN to Gilberto
Quote:
In Reply to Parent Post by Caster

I was at Autotech 05 recently. The "new" version of PPAP changes all the rules.

There was a lot of unhappiness from the bulk material guys because it looks like the big 3 have changed back to "always do a PPAP for any change". The reasons not to submit table is gone in the new version.

Maybe I understood wrong, or perhaps it will change before we see the new version, but there were some very unhappy folks in the audience.

What is a new version of PPAP ??? 3º edition ???
  #7  
Old 28th September 2005, 07:35 AM
Jim Wynne's Avatar
Jim Wynne Jim Wynne is offline
Cross Forum Moderator

 
Registration Date: Jan 2005
Location: Southeast Wisconsin
 
Posts: 13,332
Thanks Given to Others: 1,779
Thanked 5,352 Times in 3,430 Posts
Blog Entries: 2
Karma Power: 1445
Karma: 39204
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Quote:
In Reply to Parent Post by Gilberto

What is a new version of PPAP ??? 3º edition ???
The 3rd Edition is current; the 4th Edition is supposed to be available in October. I haven't seen it, so I can't comment on how it might apply to your questions.
__________________
We aim to please. You aim too, please.
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > APQP and PPAP

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
CCP Validation and Pre-Requisite Program Reassessment Requirements Mumus ISO 22000, HACCP (21 CFR 120) and Food Safety 4 10th October 2011 10:39 AM
Pre requisite for AEC Q200 Astra Various Other Specifications, Standards, and related Requirements 1 12th January 2010 07:35 AM
CQE (Certified Quality Engineer) requisite 8 years experience requirement apestate Professional Certifications and Degrees 6 22nd April 2006 09:00 PM
IMDS concern (re: CaZn Complex Stabilizers) - No CAS number knight_sirk RoHS, REACH, ELV, IMDS and Restricted Substances Related Regulations 4 6th December 2005 08:16 AM
Trying to find CAS numbers - The Database of chemical substance information Giselle ISO/TS 16949 - International Automotive Quality Systems Standard 3 22nd July 2005 11:57 AM



The time now is 08:09 PM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, Olde West Chester, Ohio 45069-1929
513 341-6272