The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Manufacturing and Related Processes


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 21st September 2000, 09:20 PM
PAULM
Unregistered Guest

 
Posts: n/a
The Hat Production Traceability - Need to Keep Grip On

Hello all,
I hope that someone can help me, I have been given the task of coming up with a fool proof method for achiving tracability against time of production.

A am a Q.A technician in a cheese prepacking
company, at present we have a system in place that involves the following....
1)cheese is brought to production line
2)pallet ticket and creamery code from pallet is passed to feeder in.
3)feeder in passes ticket to Line leader
4)Line leader records information onto Q.A sheets and enters new creamery into weighing and labelling machine.
5)Line resumes production.

We have had recently new production managers, and as an outcome of idea bashing, it was decided that stopping a line to change a creamery code was un-acceptable, and a method was needed to record creamery on Q.A. sheets against a time that is preprinted on the packs, hence if any complaints arrive the time on the pack and the line code will be enough to find out from Q.A. records what creamery was in use at that time.

O.K. you say no problem, well a recent audit was undertaken, and it was found that under the present system, we were not achiving tracability due to on line staff failing to fill out Q.A sheets with all creamery changes that took place

This lead to the question and my project to complete by the end of the year, "How to introduce a time based tracability system and how to effectivly record this information in a way that can be achived by on-line personel".

The system required for recording will still be along the line of how it is at present, the problem and the reason for my post is, how can we make sure that every pallet that gets to line that has different LOT numbers and creamerys gets recorded every time.

Many Kind regards in advance

PMM.
Reply With Quote

Sponsored Links
  #2  
Old 21st September 2000, 09:53 PM
David Mullins's Avatar
David Mullins David Mullins is offline
Aussie Bloke

Registration Date: Nov 1999
Location: Adelaide, South Australia, Australia
Age: 47
 
Posts: 495
Thanks Given to Others: 0
Thanked 13 Times in 8 Posts
Karma Power: 51
Karma: 84
David Mullins has less than 100 Karma points so far.
Yin Yang

Computer.
bar-code scanner.
Barcoded.

Swipe the bar code when the new batch is introduced. Relevant data from testing or critical characteristics measured before hand should be linked to the bar-code.

The batch data needs to be linked to the Packaging coding info on the final product 's packet.

This way, if somebody questions a product you can provide a full history of production and testing. And this doesn't need to be expensive!

------------------
Reply With Quote
Sponsored Links

  #3  
Old 22nd September 2000, 08:38 AM
PAULM
Unregistered Guest

 
Posts: n/a
Bar-code systems were looked into, but present a problem, due to the nature of the production line, a pallet of cheese can be brought to the line upto 2hrs before being
packed as a finnished product, We have computer systems in place that gives us info on when raw/finnished goods enter/leave the production line and labels are bar-code scanned.

Problem is we need to keep written Q.A production sheets, on these sheets we include which pallet is in use and creamery information along with other checks made.

The production line is quite long,when a new pallet with different info comes to line a big "C" is drawn onto the first block of this
pallet, the ticket is then passed to the feeder in, who in turns passes this to the
line leader when the change block reaches the feeding in point. Only when the new creamery has reached the feeder can the line leader alter the weighing and labelling machine to reflect the changes and then fill in the Q.A.Sheet giving the new details.

When we deal with complaint, it relates to a single pack of product, from this we trace back through Q.A. sheets to determine which creamery was in use at a perticular time.

Problem is on-line staff are failing to record these changes. The problem from this stems from the needed to get as much tonnage out as pos. and production managers turn a blind eye to people cutting corners, We as a QA department are always trying to find ways of keeping Quality and tracability to the max, while production try to maximize output by what ever means possible.

Tracability is very important and a fool proof method is needed to get these changes recorded every time, no matter how much they try to get round the system.
Reply With Quote
  #4  
Old 24th September 2000, 10:40 PM
David Mullins's Avatar
David Mullins David Mullins is offline
Aussie Bloke

Registration Date: Nov 1999
Location: Adelaide, South Australia, Australia
Age: 47
 
Posts: 495
Thanks Given to Others: 0
Thanked 13 Times in 8 Posts
Karma Power: 51
Karma: 84
David Mullins has less than 100 Karma points so far.
May be I haven't grasped it all yet, but it seems to me that the barcode could be on the first pallet of each new batch (much like a Kanban ticket), instead of drawing a big C on the pallet. The barcode would be placed in a specific location on the pallet that corresponds to a fixed scanner located at the point where the pallet enters the feeder. Thus the batch data is automatically entered against other stored info.

It seems to me to be a fairly simple problem with numerous solutions to circumvent work practices that amount to gross negligence by line management and all those up the line who know what the "real" practices are, or have been informed.

Obviously management is aware that the current practices are not sufficient, or you wouldn't have this project.

You said they want a "fool-proof" method, then give them one. Automate as many steps as possible to remove the human (& cultural) element of negligence - Don't get bogged down by what the current process is.

Costs of implementation can be demonstrated to be off-set by the gains made in production through not stopping for each new batch, plus better control over process data, and ultimately product quality. This is a win-win for production, management, you and the poor customer who currently buys your product in good faith.



------------------
Reply With Quote
  #5  
Old 30th September 2000, 01:12 AM
Graeme's Avatar
Graeme Graeme is offline
$ Contributor

Registration Date: Sep 2000
Location: Lilburn, GA, USA
Age: 60
 
Posts: 401
Thanks Given to Others: 0
Thanked 8 Times in 7 Posts
Karma Power: 63
Karma: 894
Graeme is appreciated, and has over 700 Karma points.Graeme is appreciated, and has over 700 Karma points.Graeme is appreciated, and has over 700 Karma points.Graeme is appreciated, and has over 700 Karma points.Graeme is appreciated, and has over 700 Karma points.Graeme is appreciated, and has over 700 Karma points.Graeme is appreciated, and has over 700 Karma points.
Send a message via AIM to Graeme Send a message via MSN to Graeme Send a message via Yahoo to Graeme
Yin Yang


I agree with Mr. Mullins that you should examine a computerised scanning system in more detail. If your information needs run to more than a batch number and time-of-day, then look at 2D or 3D coding and scanning systems. They can encode large amounts of data in a small space. (For example, my driver's license has a small 3D "barcode" on the back that encodes all of the information from the front, plus other data.) With state-of-the-art automation and networked computer systems, you should hardly ever have to enter a data element more than once, or handle a piece of paper. A computer record can also be more traceable and secure than a paper copy, and a system that uses digital signatures is even better. For the type of process you appear to have, scanned codes (placed as Mr. Mullins suggested) and automated tracking will probably prove to be faster, more consistent and reliable, provide more data, and have less total production cost in the long run.

You said that "we need to keep written Q.A production sheets" ... WHY? If the principal reason is because that is the way you have always done it, then the process can almost certainly be greatly improved -- especially if you have a computerised system. I am working with a group that is installing a computer-based process management system that will replace a fully manual system. There are many improvements for the workers. The main one, though, is this --
We will no longer have to read information from one computer-printed form and enter it into another computer!
In addition, we will not have those paper forms any more -- you know, those things that get lost, torn, dirty, or are the wrong version.

A quote from Deming: "It's been going on for years" is a confession that the fault lay in the system.




------------------
Graeme C. Payne
ASQ Certified Quality Engineer
Graeme@asqnet.org
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Manufacturing and Related Processes

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Traceability SOP Audit Finding - Does not describe the extent of the traceability Tiffany ISO 13485 - Medical Devices - Quality Management Systems 13 21st August 2009 01:01 PM
How do I record verification & traceability of production tools to job? lego55 AS9100 Aerospace Standard and Requirements 7 14th August 2009 11:35 PM
Production Environment Procedures (NDT type sample testing and traceability) deoquest ISO 9001 - Quality Management Systems Standard 10 26th January 2009 10:49 PM
Part to Material Traceability - Parts for Production Runs ttwerp65 ISO 9001 - Quality Management Systems Standard 1 14th September 2007 07:27 PM
Traceability within the Production Process - Wire Harnesses alexfox QS-9000 - American Automotive Manufacturers Standard 3 23rd June 2003 06:03 AM



The time now is 01:50 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts