The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Misc. Quality Assurance and Business Systems Related Topics


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 6th October 2000, 05:45 PM
Alan Cotterell
Unregistered Guest

 
Posts: n/a
I Say... Operational Risk - Quality system procedure should cover all eventualities

Dear Andy, I feel I should persevere and explain the concept of operational risk management a little bit further.
As I have said before the major risk areas in any industrial process are - quality, safety, environment, security.
If you consider the situation which exists in a hospital casualty ward, where a nurse is receiving patients - she should provide a quality service to patients. In the situation where some drunk cuts loose in the ward and attacks her or patients, you have a loss of quality of service, you have a health and safety problem, you might have environmental problems (if enough blood is spilt), you certainly have a security problem.
The risks are related and there are tradeoffs between them, which are affected by the risk controls you introduce.
Any quality system procedure should cover all eventualities.

Consider the situation where a nuclear reactor is in operation. Procedures might be aimed at maintaining electricity supply, but shouldn't they also cover workplace safety (safe handling of isotopes), environment (control of isotopes so that they are not released), security (protection of isotpes from terrorists).

In most cases a policy statement reflected in procedures is sufficient to control these risks.
I suggest management manuals should have four policy areas but only procedures which define the process in the workplace, and not separate quality, safety, environmental protection and security procedures.
It's a matter of doing the job right first time, i.e. getting an output which satisfies the customer - a quality/safe/nonpolluting product produced in a safe, nonpolluting secure workplace.

In the nuclear reactor case I am a stakeholder. There has been a proposal to set up a reactor in Indonesia in the next ten years. The culture in that country is not very democratic, and I suggest that this gives a certainty of incidents occurring. The controls for quality, safety, environment and security in reactors are procedural and depend on people doing the right thing, it's just not going to happen in Indonesia, we'll get another Chenobyl.
So Darwin will not be a good place to live.

I don't really care whether you have a problem selling quality systems to organisations, the point is their operational risk must be appropriately managed, and it's a matter of controlling the risks to a level tolerable to all stakeholders.

Best Regards, Al
Reply With Quote

Sponsored Links
  #2  
Old 8th October 2000, 01:14 AM
awk
Unregistered Guest

 
Posts: n/a

Al:

I found your risk management interesting.

I notice when reading the various forums that individuals place quality, environmental, health and safety, and security in their compartments with ISO/QS in their compartment, as though they are not related.

As far as I am concerned they should all be included when documenting, and implementing ISO/QS.

These are all processes, which I include in Process Control, and I have trouble understanding how everybody wants to separate them.

As part of my Gap Analysis, environmental, health and safety issues, which ties in with security, play an important role. ISO/QS states a company must be in control of their regulatory and statutory requirements. Therefore, as an example, when a company is building an addition, they better have the appropriate building permit as mandated by law.

When a company chooses to ignore, and does not comply with mandated regulations, and laws they then sign a waiver for me. However most companies show a willingness to cooperate, and end up with a fabulous system.
Should they choose not to sign the waiver,that's their choice, however it is my choice not to be their consultant.

Lastly all documentation, including laws, codes, etc. are listed on the Controlled Document & Data List, or master equivalent, as external documents. I don't see how any of this can be separated.

my monies worth, which isn't worth a whole lot nowadays in Canada,

awk
Reply With Quote
Sponsored Links

  #3  
Old 8th October 2000, 05:00 AM
Alan Cotterell
Unregistered Guest

 
Posts: n/a
I Say...

I've given this matter of 'compartmentalisation of thought' some consideration over the years and have come up with some reasons for it.
If you have a look at the drawings of Escher the German artist, you will see monks walking continuously upstairs, and water flowing continuously downhill around in circles, in a way which is effectively perpetual motion, which we know is impossible.
In effect we cannot look at two parts of the picture at the same time, and see the absurdity of the drawings.
I suggest similarly we cannot perceive the ramifications of the quality, safety, environment, and security systems simultaneously - we cannot see the 'big picture'.
The answer is to write policies for the four risk areas, but only procedures for actually doing the process in the workplace.
The procedure is the point of systems integration, it should reflect all policies of the organisation. It is the 'correct way of performing work', in the organisation.
Reply With Quote
  #4  
Old 8th October 2000, 05:03 AM
Alan Cotterell
Unregistered Guest

 
Posts: n/a
You might be interested in my web sites at: http://www.acotrel.com http://www.angelfire.com/nb/hazsun/index.html http://members.spree.com/education/a.../labourman.htm
Please feel free to visit and use any info there.
If you find anything unreasonable I'd like to hear about it.
Reply With Quote
  #5  
Old 8th October 2000, 05:06 AM
Alan Cotterell
Unregistered Guest

 
Posts: n/a
The second address is: http://www.angelfire.com/nb/hazsub/index.html
(sorry)
Reply With Quote
  #6  
Old 8th October 2000, 02:54 PM
Alan Cotterell
Unregistered Guest

 
Posts: n/a
Default Operational Risk

Dear Andy and Marc, From your silence and the fact that you removed the previous postings and responses on this subject from your forum, I note that you now understand Operational Risk Management. I can only suggest the action you have taken to apply this level of censorship, implies the parochial nature of your thinking, and the way you wish to continue.
Reply With Quote
  #7  
Old 8th October 2000, 03:16 PM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,567 Times in 1,019 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11564
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Yin Yang

Allan, don't give me (us) your bull. Andy had nothing to do with your message 'disappearing'. Your post was moved -- by me -- to the Misc Quality Topics forum as it more appropriately belongs there. You're just so focused upon yourself and your own ramblings (read: your own importance) that the forums here as a whole don't interest you - or you would have seen that the thread had been moved.

Just about every post you make here is on risk and promotes your web site. Nothing new. Many times I read your 'manifestos' and think to my self things like: "Should I delete this as a commercial posting?" and "Does this guy know anything else?" Often it's almost like SPAM - a diatribe about your 'cause' and then a "...by the way, you can learn more at my web site..." In truth, we both know you have been laughed out of several forums at other sites.

As far as your saying "...I can only suggest the action you have taken to apply this level of censorship, implies the parochial nature of your thinking...", I suggest you look in a mirror. And I suggest that you get a life.

As far as censorship goes, you should know better (but I'm not surprised you don't). If you don't 'like it here' in the Cove forums, then don't come back. No one is forcing you to visit or to post.
Reply With Quote
  #8  
Old 8th October 2000, 05:03 PM
Alan Cotterell
Unregistered Guest

 
Posts: n/a
Read This!

Dear Marc,
I should have guessed you had moved the postings on Operational Risk. I apologise that you have been 'wrongfully accused', and for the fact that I have been too lazy to determine the logic associated with your forum structure.
As you have said, my postings in the past have always said the same sorts of things. Until recently I have never received a response which gave recognition of any sense to my comments.
The posting by awk from Canada in your forum is the first indication that anyone else actually percieves there is a problem coordinating the four risk areas. His solution - getting a waiver from the customer, is not what I would normally do, but it's a good answer.
The health and safety law in Victoria,Australia has recently changed to a risk management basis to replace (complement?) the Roben's style legislation.
I have developed a management manual which will give compliance with the new laws, is compatible with ISO9000, ISO14000. It is fairly generic for engineering companies conducting their business on a project basis. It has taken me about twenty years of writing manuals to get to the stage where I have one which really works.
The posting from awk has given me the reassurance I need to proceed to sell it.
I greatly appreciate the use of your forum, sorry to be a nuisance.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Misc. Quality Assurance and Business Systems Related Topics

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Should Quality System scope cover non-medical devices? s.parakos ISO 13485 - Medical Devices - Quality Management Systems 3 20th January 2008 09:05 AM
Quality Management System Procedure needed jkittle Documentation Control Systems, Procedures, Forms and Templates 3 9th May 2007 08:49 AM
Key characteristics in the Quality Planning Operational Procedure Mumus Documentation Control Systems, Procedures, Forms and Templates 3 12th April 2006 10:01 AM
Risk analyses of quality system processes FENERIUM Quality Tools, Improvement and Analysis 2 6th December 2005 01:47 PM
Operational Risk Management - In Memory of Alan Cotterell - A Focused Individual Alan Cotterell ISO 9001 - Quality Management Systems Standard 3 14th August 2004 02:02 PM



The time now is 12:09 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts