|
|
 |

25th October 2005, 08:06 PM
|
 |
Post responsibly
Registration Date: Oct 2001
Location: Long Beach, CA - USofA
|
|
Posts: 4,950
Thanks Given to Others: 688
Thanked 1,909 Times in 1,083 Posts
Karma Power: 467
|
|
NASA encourages AS9100/9110/9120 certification
http://discovery.larc.nasa.gov/PDF_F...ty_Systems.pdf
AS9100 Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing
AS9100 compliance assessment and registration coupled with ISO 9001 registration is highly encouraged. Safety and reliability are vital and the quality systems that we use to ensure that safety and reliability are critical to our mission success. AS9100 is the Quality systems Aerospace Model for Quality Assurance in Design, Development, Production, Installation and Servicing. AS9100 includes ASQ9001:2000 quality system requirements and specifies additional aerospace industry requirements for a quality system. AS9100 places additional emphasis on structured design, control of software and design validation methodologies that is needed for NASA systems quality application. Additional quality systems requirements will include specific clauses for sharing of quality data, configuration management, reliability, maintainability, and safety. Manufacturers, suppliers and service organizations who regard quality management as a key business driver are highly desired as NASA hardware and service providers. Independent AS9100 and ASQ9001:2000 registration provides objective evidence of a commitment to quality, safety and reliability. NASA expects conformance to AS9100 and to the applicable derivatives such as AS9110 for Repair and Overhaul facilities and AS9120 for Pass-through Aerospace Distributors. Certification to the AS9100 though the Industry Controlled Other Party (ICOP) process is "strongly encouraged."
After all, this IS ROCKET science..
__________________
Fighting organizational dysfunction, one post at a time.
Last edited by Sidney Vianna; 25th October 2005 at 08:12 PM.
|

26th October 2005, 04:03 PM
|
|
E-Mails Invalid or Rejected
Registration Date: Jun 2004
Location: Ohio
|
|
Posts: 415
Thanks Given to Others: 0
Thanked 2 Times in 2 Posts
Karma Power: 0
|
|
Nasa
I am a bit dismayed at NASA encouraging anything. The last I read they determined that it was the rework on the foam of main fuel tank that caused the foam to be damaged. This rework damage is claimed by NASA to be the root cause of the foam breaking off (AGAIN) during the last launch. Wasn't it just last month that NASA declared the shuttle program to have been a mistake! AS9100 isn't going to help them. They are so unsure of their own findings that they have moved the next launch back to April of 2006. In my opinion, I could care less what NASA encourages. Let them first get their act together.
|

2nd March 2006, 12:01 AM
|
 |
Post responsibly
Registration Date: Oct 2001
Location: Long Beach, CA - USofA
|
|
Posts: 4,950
Thanks Given to Others: 688
Thanked 1,909 Times in 1,083 Posts
Karma Power: 467
|
|
What QMS does NASA require?
NASA's policy is available @ http://nodis3.gsfc.nasa.gov/displayD...page_name=main
Quote:
a. Work that is both critical and complex shall be performed in
accordance with the quality system requirements of AS9100.
(1). Critical work is any hardware task that, if performed incorrectly
or in violation of prescribed requirements, could result in loss of human
life, serious injury, loss of mission, or loss of a significant mission
resource (e.g., Government test or launch facility).
(2). Complex work involves either: a) the design, manufacture,
fabrication, assembly, testing, integration, maintenance, or repair of
machinery, equipment, subsystems, systems, or platforms; or b) the
manufacture/fabrication of parts or assemblies which have quality
characteristics not wholly visible in the end item and for which
conformance can only be established progressively through precise
measurements, tests, and controls applied.
b. Critical, but not complex, work shall be performed in accordance with
the quality system requirements of AS9100 or ISO 9001, or the inspection
and test quality system requirements of AS9003. Noncomplex work
includes manufacture of "build to print" piece parts or performance of a
discrete manufacturing/test operation such as plating, heat treating, non-
destructive testing, or laboratory testing for chemical composition or
mechanical properties.
c. Complex, but not critical, work shall be performed in accordance with
the quality system requirements of AS9100 or ISO 9001.
d. Work that is neither critical nor complex shall be performed in
accordance with the quality system requirements of AS9100, ISO 9001, or
AS9003, or in accordance with test and inspection requirements that are
specified or approved by the contracting agent and that are supported by
records evidencing their performance and outcome.
|
__________________
Fighting organizational dysfunction, one post at a time.
|

2nd March 2006, 01:21 AM
|
 |
Super Moderator
Registration Date: Jun 1999
Location: Greenwood (Ft Smith area), Arkansas, USA
Age: 58
|
|
Posts: 6,224
Thanks Given to Others: 33
Thanked 1,248 Times in 807 Posts
Karma Power: 397
|
|
Quote:
|
Originally Posted by Jim Howe
Let them first get their act together. 
|
Can't say much other than I have personally been involved with NASA recently and the folks I've been with are absolutely sincere about improvement.
__________________
None of us is as smart as all of us...Ken Blanchard
|

2nd March 2006, 03:28 AM
|
 |
Learning life
Registration Date: Mar 2005
Location: Riverside California
Age: 55
|
|
Posts: 26
Thanks Given to Others: 0
Thanked 3 Times in 2 Posts
Karma Power: 19 Karma: 25 
|
|
Thanks I was looking for this (NPD 8730.5) "Quality Program Policy" on NASA site and could not locate it.
__________________
Quality is Never an Accident, it is the result of High Intention, Sincere Effort, Intelligent Direction, and Skillfull Execution. WA Foster
Last edited by Louis Reimer; 2nd March 2006 at 03:35 AM.
|

2nd March 2006, 10:36 AM
|
 |
Super Moderator
Registration Date: May 2003
Location: Clinton Township, MI USA
Age: 41
|
|
Posts: 1,600
Thanks Given to Others: 389
Thanked 134 Times in 80 Posts
Karma Power: 128
|
|
Quote:
|
Originally Posted by Randy
Can't say much other than I have personally been involved with NASA recently and the folks I've been with are absolutely sincere about improvement.
|
We recently did our first job for Jet Propulsion Laboratory. We had to have a Quality System Audit in order to be eligible for the contract and there was also a lot of back and forth with engineers, quality assurance, etc. I agree with Randy, all those folks we dealt with are absolutely sincere about improvement.
Quote:
|
Originally Posted by Jim Howe
Let them first get their act together.
|
I used to say the same thing about the B3.
__________________
First thing each morning, I try on my bathing suit. Then, nothing worse can happen the rest of the day.
|
Lower Navigation Bar
|
|
|
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|