The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Quality Tools, Improvement and Analysis


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 23rd June 2000, 09:19 AM
Urs
Unregistered Guest

 
Posts: n/a
Question 5S-Method

Our factory is about to introduce the 5S-Method from Kaizen (Seiri; Seiton; Seiso, Seiketsi, Shitsuke).

I was wondering if any of you have experience in introducing this method.

-What is the main problem in the introduction ?
-did you introduced this method only in the manufacturing or in the administration as well ?
-How did you motivate the employees?
-How long was the introduction time?
-Did you have a support of a coach during the introduction?

Thank you very much for your input
Urs V

Reply With Quote

Sponsored Links
  #2  
Old 23rd June 2000, 10:11 AM
Laura M's Avatar
Laura M Laura M is offline
Courtesy Access

Registration Date: Aug 1999
Location: Rochester, NY US
 
Posts: 759
Thanks Given to Others: 3
Thanked 17 Times in 15 Posts
Karma Power: 70
Karma: 656
Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.
Send a message via AIM to Laura M Send a message via Skype™ to Laura M
We implemented in the managers offices areas first..administration if you'd like, to show employees we meant business. Clean desks every nite, place for everything and everything in its place for supply cabinets, labeled file drawers so folks other than the secretary could find stuff, and yes, even yellow outlines on desks for the stuff required (which WAS a little obnoxious). Have fun with it, we took a Friday to make a pile of all our excess pens, pencils, extra file folders,etc....stuff not needing to be in your desk all the time, and found enough pens/pencils to stock the supply cabinet for about 6 months. Some depts took the next step to organizing individual filing systems for similar jobs exactly the same color coding etc....so if you switch jobs within the same department....you knew where everything was.

Most of this was simultaneous with mfg applications. Have the 'bosses' get dirty with the "clear." Empty the department and determine exactly what is needed daily and put back only that stuff.

Not sure how far along you are, but have a plan for "labeling" so from dept to dept there is consistency. For example: Yellow means raw material storage, green means finish product, red rejects, etc.

Bottom line with the admin side, is you want to motivate employees to keep their workspace organized out on the floor, and how can you do that when they walk into an unorganized office. Yes, they may work in a production environment, but it is "their" workspace, and if its important for them it should be important for managers.

I don't think you can establish "how long" for an introduction, because it is a continuous improvement process.

Yes, we had help of a highly reknown consultant. He was from Japan, but worked with Jim Womack. You can do a websearch on his name and get to his website/company, I believe.

Lastly, I suppose the main problem was educating everyone on the benefits, which pretty much required constant reinforcement, and a couple of "good examples" after the effort of where it paid off.
Reply With Quote
Sponsored Links

  #3  
Old 25th June 2000, 02:56 PM
Qualiman Qualiman is offline
Involved - Posts

Registration Date: Feb 2000
Location: Cuautitlan , Mexico
 
Posts: 61
Thanks Given to Others: 11
Thanked 1 Time in 1 Post
Karma Power: 41
Karma: 15
Qualiman has less than 100 Karma points so far.
Screw

Urs:

You can hire an expert, for sure, but I think the more dificult thing is to decide to make it, starting of course with top management support, not only giving resources, buy assesing personaly the advance of the program.

I would say, in my experience, all you need is a simple serie of steps:
1.- Training in 5 S to ALL personnel. Those that will never will participate as auditors will always be audited.
2.- Select a representative of each department (if possible) to be part of the 5 S team, which will conduct periodical assesments of premises, including all tipe of places.
3.- Conduct audit using a format, making a numerical measurement and taking note of all non conform situation in order to f/up the resolution of them.
4.- Make a report. Give it to the responsible of audited area. Demand corrective actions. Communicate results to all personnel.
5.- A common effort of improvement (including a friendly competence, to be the best or the less worst).
6.- And finally, the most important: The top management has the compromise to allow the 5 S team audit his own offices. In several cases, the only places "skipped" by 5 S team are the big shoot ones because"they always have a neat place"

I hope my oppinion would help

Qualiman
Reply With Quote
  #4  
Old 27th June 2000, 02:25 PM
Kevin Mader's Avatar
Kevin Mader Kevin Mader is offline
One of THE Original Covers!

Registration Date: Nov 1998
Location: Wallingford, CT USA
Age: 43
 
Posts: 1,158
Thanks Given to Others: 22
Thanked 63 Times in 43 Posts
Karma Power: 94
Karma: 1335
Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.
Send a message via AIM to Kevin Mader
Urs,

Before implementing this tool, you must determine if your organizational culture is ready for this. By this I mean is your organization process-oriented or results-oriented? If you are results-oriented, then you need to change the thinking (a senior level directive). Otherwise, 5S won't help much.

Regards,

Kevin
Reply With Quote
  #5  
Old 27th July 2000, 12:53 PM
sulkinsf sulkinsf is offline
Involved in Discussions

Registration Date: Jul 2000
Location: Dallas, TX
 
Posts: 54
Thanks Given to Others: 2
Thanked 3 Times in 3 Posts
Karma Power: 39
Karma: 25
sulkinsf has less than 100 Karma points so far.
Send a message via MSN to sulkinsf
Our process-

Take before picture of work area.
Train the workgroup (2hours)
Go out and do 5S at the end of the class.
Take after picture.
Everyone gets a 5S T-shirt.
Donuts are available if you wear your T-Shirt on Friday and 5S your area.


This 5S stuff is very simple and I was very pleased with the results. My staff (QC Inspection), reduced the number of stations from 2 to 1, got rid of two carts worth of unneeded stuff and gave some of it to people who needed it, clearly organized all our drawers so everything can be easily found, and reduced our cycle time by at least an hour. The entire project took an afternoon.

Advice-
By a portable label maker and order plenty of jelly filled donuts.

Good luck and have fun.

-Steve.
Reply With Quote
  #6  
Old 1st August 2000, 01:48 AM
Steven Truchon's Avatar
Steven Truchon Steven Truchon is offline
Courtesy Access

Registration Date: Jul 2000
Location: Fort Lauderdale, FL USA
Age: 54
 
Posts: 116
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 41
Karma: 10
Steven Truchon has less than 100 Karma points so far.
Default

This is a fascinating subject. I'll have to do some research on this. I believe Marc listed a link to some info. I'll have to keep my looking a secret though, between QS9000 and Six Sigma, I'll be lynched if I bring "another program" in the door. LOL


------------------
~ Steve Truchon
~ Quality Engineer/Safety Director
Reply With Quote
  #7  
Old 15th December 2000, 12:55 PM
maggioli
Unregistered Guest

 
Posts: n/a
Dear Urs,

I’ve some experience on implementing 5S
I think since June when you have quoted your question, you have probably initiated the process.
The comments (answers) are very common sense and pertinent, it would be useless to add more.
I can say that I’ve developed thia model for both manufacturing and Services (admin) organizations. It’s very exiting.
I learned all about 5S from an excellent operational book edited by the JPC - (Japan Productivity Center – Socio-Economic development – Tokyo)
From the book, I developed my personal IPQP model (Integrated Productivity and Quality Improvement) for productivity Facilitators.
I’ve trained and implemented the model into 5 SME.
It has been impressive, it is at the same time TQM, Juran Continuous Improvement, ISO 9000-2000, Kaizen, Gemba-shugi, Shinin (Toyota), Poka-Yoke, 7QMT, 7QCT, etc………).
Six Sigma differs only in that: The implementation enforce alternating training and practices on real live breakthrough project.
Should you need more details please do not hesitate, all the documents developed while the implementation are available because they belong (SM) to me.
Giuseppe Maggioli
Managing Director
QUASYS Quality and Management Consulting SA
Ch. des Tourniaux 18 - CH-1277 Borex/VD - Switzerland
Phone: +41 22 367 1312, Fax: +41 22 367 1562
e-mail: giuseppe.maggioli@quasys.com.ch
internet: www.quasys.com.ch


Reply With Quote
  #8  
Old 19th January 2001, 03:03 PM
jdkilp
Unregistered Guest

 
Posts: n/a
Lightbulb

You will like 5S. We use this frequently. Most of our clients are able to do it themselves, after we help them in just one area.

By all means, start in the office areas to set the example. We also like to implement it in shipping & receiving areas, because of the high visibility.

5S is a good way to kick-off teams within an organization. It appears to be a natural team builder. In fact, we normally do a 5S project PRIOR to team training. It makes the team stuff a breeze.

5S is a "must" for implementing Lean concepts. And, it's very beneficial to TQM.

If you need more info, feel free to contact us.

Jerry

------------------
Jerry Kilpatrick & Associates
Fax: 413-556-5711
jkilpatrick@ureach.com
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Quality Tools, Improvement and Analysis

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Difference between Range method and ANOVA method of MSA ashram Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 3 22nd July 2009 08:01 AM
Difference between Range method and ANOVA method of MSA Poilofesse Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 3 26th June 2008 07:08 PM
Calculating Basic Risk/ Basic on Risk Analysis - Medical device MDD Class II and up temujin ISO 13485 - Medical Devices - Quality Management Systems 8 23rd May 2007 06:54 PM
What is the Difference between Laboratory-developed method and non-standard method? CKW75 ISO 17025 - Calibration, Measurement Gages and Test Laboratories 6 3rd December 2006 11:34 PM



The time now is 02:38 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts