The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Misc. Quality Assurance and Business Systems Related Topics
Forum Username

Elsmar Cove Forum Visitor Notice(s)


Elsmar Cove Forum Sidebar
Custom Search
Monitor the Elsmar Forum
Monitor New Forum Posts
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Sponsor Links







Donate and $ Contributor Forum Access
Sponsored Links
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's
International Quality Services

Atul's
Symphony Technologies

Marcelo Antunes'
SQR Consulting

Bob Doering's
Correct SPC - Precision Machining


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality

Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 20th March 2001, 02:48 AM
Raffy's Avatar
Raffy Raffy is offline
Appreciated Member

 
Registration Date: Mar 2001
Location: Manila, Philippines
Age: 41
 
Posts: 791
Thanks Given to Others: 397
Thanked 111 Times in 82 Posts
Karma Power: 132
Karma: 1505
Raffy is appreciated, and has over 1500 Karma points.Raffy is appreciated, and has over 1500 Karma points.Raffy is appreciated, and has over 1500 Karma points.Raffy is appreciated, and has over 1500 Karma points.Raffy is appreciated, and has over 1500 Karma points.Raffy is appreciated, and has over 1500 Karma points.Raffy is appreciated, and has over 1500 Karma points.Raffy is appreciated, and has over 1500 Karma points.Raffy is appreciated, and has over 1500 Karma points.Raffy is appreciated, and has over 1500 Karma points.Raffy is appreciated, and has over 1500 Karma points.
Please Help! Deviation Reports - Is Implementation Date equal to Date of Completion

Is Implementation Date equal to Date of Completion? What could be the allowable number of days do I have to specify in our procedure for date of completion? Please comment.
Regarding follow-up would ten working days be enough for the auditee to have an ample time to answer their discrepancy and made some corrective actions? Please advice.
Thank you very much,
Raffy

Sponsored Links
  #2  
Old 15th April 2001, 02:14 AM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

 
Registration Date: Jan 1996
Location: West Chester - Southern Ohio - USA
Age: 62
 
Posts: 22,812
Thanks Given to Others: 7,457
Thanked 4,543 Times in 2,894 Posts
Blog Entries: 4
Karma Power: 400
Karma: 28830
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Yin Yang

Implementation date is the date you start the process. If you are implementing a corrective action, the date you start the 'fix' is the implementation date.

The completion date could be 2 things. You don't give enough info. Typically the completion date is either the date the implementation is finally completed (some implementations are done in a day - some are done in a month, etc.). Then it is verified to be effective. More typically the completion date is the date the CA is actually closed out.

You can set a date for a reply or for a status update but until you exactly what the corractive action is going to be you can't set a completion date. Some corrective actions are complex and require long tersting scenarios to complete. Some can be done in a day.

10 days should be plenty of time to ask for an initial reply to a finding or event and for an interim corrective action to be put in place. Most of the time interim corrective actions are done within a day ort two.

[This message has been edited by Marc Smith (edited 15 April 2001).]
Sponsored Links

  #3  
Old 15th April 2001, 04:13 PM
Al Dyer
Unregistered Guest

 
 
Posts: n/a
Question

Raffy,

Does your system differentiate between corrective actions that result from product nonconformance (4.14) and internal audit (4.17)?

If you are refering to an ISO-9000:2000 system disregard my question.

ASD...
ASD...
  #4  
Old 17th April 2001, 03:02 PM
Greenraisin
Unregistered Guest

 
 
Posts: n/a
I agree with Marc. I think 10 days is adequate to require a corrective action plan. Just the plan, not the actual correction! That will depend on a couple of things. 1. the amount of time it will take to develop, test, and implement a fix, (you don't want to have a less than acceptable correction because you didn't allow enough time to do it right!), and 2. how long management is willing to live in a state of non-compliance, based on the risk of getting busted with your system still non-compliant. (Busted means either getting caught by another audit, or having your systems fail you because they aren't working correctly). Most auditors will consider your having a plan in place and as long as it appears to be a valid plan, (i.e. it addresses the issue and appears to be a legitimate time frame), will not cite you again. Setting time frames for corrective actions is always a tough issue as different fixes take different resources and time. I would just require a set response time for your corrective action plan and then evaluate each plan as to whether or not it's being addressed quickly enough. Changing a procedure is usually much easier and quicker than developing a new manufacturing process, and thus would take less time. One thing we do is look at short term and long term corrective actions. Short term limits the possibility of having another failure through extraordinary activities, (e.g. extra inspections, testing, etc.), and long term eliminates the possibility of failures as a matter of process, (e.g. SPC). A corrective action plan is not a complete plan without an anticipated closure date, which is what we use as a tracking mechanism to monitor progress.

Good luck and let us know what you end up doing.

------------------
See you down life's highway!

Eric
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Misc. Quality Assurance and Business Systems Related Topics

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Should there be a incident/deviation for breakdown or missed calibration date? v9991 Nonconformance and Corrective Action 6 8th December 2011 06:14 PM
Quality Manual Revision Date vs. Effectivity Date kevrac Documentation Control Systems, Procedures, Forms and Templates 8 4th April 2011 02:12 AM
Document Effective Date vs. Implementation Date baynoli Documentation Control Systems, Procedures, Forms and Templates 7 29th January 2010 10:31 PM
Done date & due date on calibration stickers mhirand20 ISO 17025 and related Metrology Topics - Measurement Devices, Calibration and Test Laboratories 12 3rd December 2008 12:14 AM
Continual Improvement Requirements - No expected completion date listed - 8.5.1 Bigfoot ISO/TS 16949 - International Automotive Quality Systems Standard 10 28th June 2006 01:27 PM



The time now is 10:39 AM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, Olde West Chester, Ohio 45069-1929
513 341-6272