The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Misc. Quality Assurance and Business Systems Related Topics


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 20th March 2001, 03:48 AM
Raffy's Avatar
Raffy Raffy is offline
Courtesy Access

Registration Date: Mar 2001
Location: Manila, Philippines
Age: 38
 
Posts: 639
Thanks Given to Others: 225
Thanked 63 Times in 49 Posts
Karma Power: 73
Karma: 1270
Raffy is appreciated, and has over 1100 Karma points.Raffy is appreciated, and has over 1100 Karma points.Raffy is appreciated, and has over 1100 Karma points.Raffy is appreciated, and has over 1100 Karma points.Raffy is appreciated, and has over 1100 Karma points.Raffy is appreciated, and has over 1100 Karma points.Raffy is appreciated, and has over 1100 Karma points.Raffy is appreciated, and has over 1100 Karma points.Raffy is appreciated, and has over 1100 Karma points.
Please Help! Deviation Reports - Is Implementation Date equal to Date of Completion

Is Implementation Date equal to Date of Completion? What could be the allowable number of days do I have to specify in our procedure for date of completion? Please comment.
Regarding follow-up would ten working days be enough for the auditee to have an ample time to answer their discrepancy and made some corrective actions? Please advice.
Thank you very much,
Raffy
Reply With Quote

Sponsored Links
  #2  
Old 15th April 2001, 03:14 AM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,852
Thanks Given to Others: 1,892
Thanked 1,563 Times in 1,016 Posts
Blog Entries: 4
Karma Power: 604
Karma: 11544
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Yin Yang

Implementation date is the date you start the process. If you are implementing a corrective action, the date you start the 'fix' is the implementation date.

The completion date could be 2 things. You don't give enough info. Typically the completion date is either the date the implementation is finally completed (some implementations are done in a day - some are done in a month, etc.). Then it is verified to be effective. More typically the completion date is the date the CA is actually closed out.

You can set a date for a reply or for a status update but until you exactly what the corractive action is going to be you can't set a completion date. Some corrective actions are complex and require long tersting scenarios to complete. Some can be done in a day.

10 days should be plenty of time to ask for an initial reply to a finding or event and for an interim corrective action to be put in place. Most of the time interim corrective actions are done within a day ort two.

[This message has been edited by Marc Smith (edited 15 April 2001).]
Reply With Quote
Sponsored Links

  #3  
Old 15th April 2001, 05:13 PM
Al Dyer
Unregistered Guest

 
Posts: n/a
Question

Raffy,

Does your system differentiate between corrective actions that result from product nonconformance (4.14) and internal audit (4.17)?

If you are refering to an ISO-9000:2000 system disregard my question.

ASD...
ASD...
Reply With Quote
  #4  
Old 17th April 2001, 04:02 PM
Greenraisin
Unregistered Guest

 
Posts: n/a
I agree with Marc. I think 10 days is adequate to require a corrective action plan. Just the plan, not the actual correction! That will depend on a couple of things. 1. the amount of time it will take to develop, test, and implement a fix, (you don't want to have a less than acceptable correction because you didn't allow enough time to do it right!), and 2. how long management is willing to live in a state of non-compliance, based on the risk of getting busted with your system still non-compliant. (Busted means either getting caught by another audit, or having your systems fail you because they aren't working correctly). Most auditors will consider your having a plan in place and as long as it appears to be a valid plan, (i.e. it addresses the issue and appears to be a legitimate time frame), will not cite you again. Setting time frames for corrective actions is always a tough issue as different fixes take different resources and time. I would just require a set response time for your corrective action plan and then evaluate each plan as to whether or not it's being addressed quickly enough. Changing a procedure is usually much easier and quicker than developing a new manufacturing process, and thus would take less time. One thing we do is look at short term and long term corrective actions. Short term limits the possibility of having another failure through extraordinary activities, (e.g. extra inspections, testing, etc.), and long term eliminates the possibility of failures as a matter of process, (e.g. SPC). A corrective action plan is not a complete plan without an anticipated closure date, which is what we use as a tracking mechanism to monitor progress.

Good luck and let us know what you end up doing.

------------------
See you down life's highway!

Eric
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Misc. Quality Assurance and Business Systems Related Topics

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
CE Marking: Date of Manufacture or Date of Shipment Asherlee ISO 13485 - Medical Devices - Quality Management Systems 1 17th June 2009 04:14 AM
Done date & due date on calibration stickers mhirand20 ISO 17025 - Calibration, Measurement Gages and Test Laboratories 12 3rd December 2008 01:14 AM
Continual Improvement Requirements - No expected completion date listed - 8.5.1 Bigfoot ISO/TS 16949 - International Automotive Quality Systems Standard 10 28th June 2006 02:27 PM
What is the proper date to use as effective date? Old 'procedures', New documents Ingeniero1 Documentation Control Systems, Procedures, Forms and Templates 9 19th April 2004 07:27 PM
Calibration Labels - Original Calibrating Date or New Date? Raffy ISO 17025 - Calibration, Measurement Gages and Test Laboratories 9 15th July 2001 01:41 AM



The time now is 06:44 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts