The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Lean - Lean in Manufacturing and Services


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 7th December 2005, 01:57 AM
abhissa abhissa is offline
Shy Poster (1 to 5 Posts)

Registration Date: Nov 2005
Location: India
 
Posts: 5
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 17
Karma: 10
abhissa has less than 100 Karma points so far.
Please Help! VSM (Value Stream Management) for service industry - Lean Manufacturing

Hi everyone,
Can anyone help with applicability of VSM (Value Stream Management) for a service industry(with the help of a case study if possible)


Thanks in anticipation

abhissa
Reply With Quote

Sponsored Links
  #2  
Old 7th December 2005, 07:53 AM
wmarhel wmarhel is offline
Courtesy Access

Registration Date: Oct 2004
Location: DuBois, PA
Age: 39
 
Posts: 612
Thanks Given to Others: 109
Thanked 234 Times in 149 Posts
Karma Power: 94
Karma: 3086
wmarhel is appreciated, and has over 1700 Karma points.
wmarhel is appreciated, and has over 1700 Karma points.
Default

In essence, a VSM is just an elaborate process flowchart with much more data collected. You can always try: Value Stream Management for the Lean Office.

I one instance we took our quotation process for new products from an average of 24-26 days down to less than 72 hours or less. It required a different look for the office and our relationship with suppliers to needed to be synergistic. Most of the waste we identified was from various hand-offs and signatures that were required for whatever reason.

An average month for the company (contract manufacturer) was $5-7 million a month in new quotes. The longer our quotation process took, the longer it took to begin making money if did win the business. There were also instances we identified where the customer's bidding process was open for 45-60 days for extremely large quotes (high number of models/parts on a single RFQ). We also realized that we were scrambling and potentially putting other bids at risk when these quotes came in the door because they would get pushed aside for the BIG $$$'s.

Regards,

Wayne
Reply With Quote
Sponsored Links

  #3  
Old 9th December 2005, 12:26 PM
db's Avatar
db db is offline
Where's the shall?

Registration Date: Jul 2001
Location: Plymouth, MI
Age: 53
 
Posts: 2,202
Thanks Given to Others: 208
Thanked 166 Times in 128 Posts
Karma Power: 129
Karma: 2579
db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.db is appreciated, and has over 1700 Karma points.
Default

We are working with hospitals to VSM (Value Stream Management) their processes. I really can't go into great detail (it is a different department from mine), however, the response from the customers seem to be positive.
__________________
Dave B (the other Dave)
Reply With Quote
  #4  
Old 10th December 2005, 03:54 AM
gszekely gszekely is offline
Involved - Posts

Registration Date: Nov 2005
Location: Hungary
 
Posts: 205
Thanks Given to Others: 28
Thanked 52 Times in 36 Posts
Karma Power: 36
Karma: 762
gszekely is appreciated, and has over 700 Karma points.gszekely is appreciated, and has over 700 Karma points.gszekely is appreciated, and has over 700 Karma points.gszekely is appreciated, and has over 700 Karma points.gszekely is appreciated, and has over 700 Karma points.gszekely is appreciated, and has over 700 Karma points.gszekely is appreciated, and has over 700 Karma points.
Default Lean Service

In my opinion Lean can be applied to any process, as usually there is waste, or oportunity for improvements.
see attachment. Some thoughts.
György
Attached Files: 1. Scan for viruses before using, 2. Please report any 'bad' files by Reporting the post it is in, 3. Use at your Own Risk.
File Type: pdf ActionPlanLeanService_lean.pdf (172.1 KB, 633 views)
Reply With Quote
  #5  
Old 22nd January 2006, 08:14 PM
techrat techrat is offline
Registered Visitor

Registration Date: May 2004
Location: North East US
 
Posts: 11
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 23
Karma: 10
techrat has less than 100 Karma points so far.
Default Value stream mapping and the quotation process

I was just reading with much interest the reply stating a significant reduction in time to quote in a contract manufacturing environment.

I am faced with the need to perform some similar improvements and would be interested in whether Wayne would be able to elaborate on the approach. I would be interested in learning about how Wayne was able to align better with suppliers as well as cutting through the red tape. Please feel free to respond to me privately if this works better for you.

Other areas in your endeavour that I am interested in are:
How many people made up the core staff of the quote processing effort?
Was the number of persons reduced as part of your improvements?
Were the bulk of the communications through paper based systesm before? After improvemnts?
Any other elaborations would be much appreciated.

Thank you,
Jeff
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Lean - Lean in Manufacturing and Services

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Need guidance in VSM (Value Stream Mapping) pritishh Lean - Lean in Manufacturing and Services 8 2nd July 2009 12:43 AM
Value Stream Mapping - Can anyone help me in developing a VSM? jericho Lean - Lean in Manufacturing and Services 16 15th April 2009 08:40 AM
Re: Value Stream Mapping (VSM) - Logistics / Transport mitch37 Lean - Lean in Manufacturing and Services 5 1st December 2008 04:46 AM
HMLV Lean Questions - PCB manufacturing industry Value Stream Mapping claymanz Lean - Lean in Manufacturing and Services 3 29th June 2007 08:15 AM
Looking for a VSM (Value Stream Map) with Cost Data nitron Lean - Lean in Manufacturing and Services 1 29th October 2006 05:26 AM



The time now is 03:22 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts