How do you define Preventive Action Items in the Manufacturing Sector?
I don't know if I am asking this question properly, but here goes, how do you define a preventive action item, especially in the manufacturing sector? Any examples would be appreciated.
|

16th May 2001, 08:24 AM
|
|
|
Quote:
Originally posted by dbulak:
I don't know if I am asking this question properly, but here goes, how do you define a preventive action item, especially in the manufacturing sector? Any examples would be appreciated.
|
Any action taken (and documented) to prevent a cause.
ASD...
|

16th May 2001, 10:19 AM
|
|
|
|
A component in area "A' was contaminated. Cleaned it. (corrective action). Let's look at areas "B" and "C" for possible contributors to the contamination problem observed in area "A". (preventive action)
energy
|

16th May 2001, 11:10 AM
|
|
|
|
A preventive action is an action put in place to prevent a non-compliance occurring in the first place.
|

16th May 2001, 02:08 PM
|
|
|
|
FMEA is initiated to try to prevent a non-compliance, preventive action is taken to lessen the possibility of a nonconformance that has occurred, or not identified during FMEA.
Very general but there is a difference.
ASD...
|

16th May 2001, 04:06 PM
|
 |
Super Moderator
Registration Date: Jun 2000
Location: North of Chicago,Illinois, USA
Age: 49
|
|
Posts: 2,087
Thanks Given to Others: 419
Thanked 314 Times in 234 Posts
Karma Power: 176
|
|
|
We define the following four ares as our preventative action program:
1) Weekly sales call reports
2) Preventive maintenance on equipment
3) Enginnering change order system
4) Employee suggestion box
Carol X.
|

16th May 2001, 06:46 PM
|
 |
One of THE Original Covers!
Registration Date: Nov 1998
Location: Wallingford, CT USA
Age: 43
|
|
Posts: 1,158
Thanks Given to Others: 22
Thanked 63 Times in 43 Posts
Karma Power: 94
|
|
|
Preventive Action – action taken to eliminate, or reduce, the risk of a cause that if left untreated, may contribute to a nonconformance.
Cause and Effect Diagram – Man (Woman), Material, Machine (equipment), & Method
What is done in any (all) of these areas to prevent a negative effect?
Possible causes for nonconformance
Man – lack of training, insufficient education, poor physical & mental well-being, unmotivated or demotivated with the job
Material – Wrong material selection for application (design), environmental/thermal degradation, material obsolescence, damaged in handling or processing, not readily available
Machine – wrong machine (fixture/equipment) for the job, machine wear & tear, poor/long setups, cumbersome, at max capacity and can’t meet demand
Method – wrong method applied, no standardized method exists, wrong theory, too complex, not enough planning, physically difficult
FMEAs and Preventive Maintenance are classic examples of these as noted earlier. FMEAs are excellent in addressing all the traditional M’s.
Possible Preventive actions
Man – programs for physical and mental health. Eye programs for associates so those that need glasses to do their work get them! Environmental controls for comfortable working conditions, ergonomically design workstations, educational assistance and job training.
Material – Drawing specifications and design requirements with respect to material selection (how is the product used and what is the environment it subject to?). For example, virgin material versus regrind, plating and finishing, color.
Machine – proximity switches, photo or fluidic sensors and switches, safety guards & switches to protect people or will not cycle machine if not in place, fixtures to facilitate proper manufacturing or assembly, TPM
Method – Quality Culture and Program inclusive of, for example: Calibration, Document Control, Contract Review, Supplier Evaluation, Internal Auditing, Product Identification, Inspection & Test Status, Design Control (QFD, verification & validation, design review, DFM & DFA), Process Control (preventive maintenance, control planning, poka yoke, error proofing), Management Review, TPM.
|

17th May 2001, 12:59 AM
|
|
|
|
Action taken to improve on trend indicators is generally considered preventive. Consider a pareto analysis that defines the leading cause of rejects; the action taken to address the leading cause would be considered preventive.
|
Lower Navigation Bar
|
|
|
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|