The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection, Prints (Drawings), Testing, Sampling and Related Topics
Forum Username


Elsmar Cove Forum Sidebar
Custom Search
Monitor the Elsmar Forum
Monitor New Forum Posts
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Sponsor Links







Donate and $ Contributor Forum Access
Sponsored Links
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's
International Quality Services

Atul's
Symphony Technologies

Marcelo Antunes'
SQR Consulting

Bob Doering's
Correct SPC - Precision Machining


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality

Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 13th December 2005, 05:26 PM
nookle nookle is offline
Inactive Registered Visitor

 
Registration Date: Oct 2005
Location: Tennessee
 
Posts: 1
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 32
Karma: 10
nookle has less than 100 Karma points so far.
Please Help! Outbound Shipping Quality - Package Contents Sampling Plan - 1,500 Packages an Hour

In our shipping operation, we send out about 1,500 packages an hour. I'd like to determine an hourly sampling plan that will tell me, with 95% confidence, that our outbound quality is 99% -- that is, the contents in the packages are 99% correct.

How do I go about establishing the plan? We do not have an quality department to address this type of program, so the request has defaulted to me!

Thanks for the help.

Sponsored Links
  #2  
Old 13th December 2005, 05:56 PM
pabloquintana's Avatar
pabloquintana pabloquintana is offline
Inactive Registered Visitor

 
Registration Date: Nov 2005
Location: Honduras
 
Posts: 42
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 35
Karma: 20
pabloquintana has less than 100 Karma points so far.
I believe you are missing one more piece of information, and that is what is the variability of your quality before packing.

If you have a big defect rate that is steady all over the day (say 12%), then two packages will have the enough power to confirm the alternate hypothesis that you have a defect level greater than 1%.

So, you need to know what is your defect rate and how does it distribute over the day. Then you can calculate the standard deviation of that sample and use it to calculate the sample size that will give you enough power.

What about the sampling plans explained in MIL-STD-1916? I am attaching a copy if you like to review it.
Attached Files: 1. Scan for viruses before using, 2. Please report any 'bad' files by Reporting this post, 3. Use at your Own Risk.
File Type: pdf MILSTDHandbook.pdf (1.44 MB, 188 views)
Sponsored Links

  #3  
Old 13th December 2005, 10:23 PM
Tim Folkerts's Avatar
Tim Folkerts Tim Folkerts is offline
Forum Moderator

 
Registration Date: Sep 2003
Location: Kansas, USA
Age: 50
 
Posts: 975
Thanks Given to Others: 29
Thanked 351 Times in 211 Posts
Karma Power: 148
Karma: 5804
Tim Folkerts is appreciated, and has over 1700 Karma points.
Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.
The binomial distribution should give you the information you need. It allows you to predict the odds of find c defects in a sample of N items when the probabilty of any item being bad are P. In Excel, you can find the odds of upto A defects using

=BINOMDIST(c, N, P, TRUE)

If we assume you use a c=0 plan, then that would be

=BINOMDIST(0, N, 0.01, TRUE)

Then you adjust N to give the results you want.



You also need to determine just what you mean by 95% confident that 99% are good. Do you want to accept the lot only when you are 95% sure it is good, or do you only want to reject the lot if you are 95% sure it is bad.

To be sure the lot is good, the function should return a value of 0.05 (=1-0.95) or less. Playing with N indicates this takes 299 samples! If you draw less than 299 pieces, there is still at least a 5% chance that a lot with just over 1% defective could still show no defects, so you can't be 95% sure it is 1% or lower.

On the other hand, is takes a much smaller sample to show the lot is bad. If you draw up to 5 pieces and find even a single bad part, that would be extremely unlikely for 1% defective, so you are 95%+ certain the lot is above 1% bad. At a sample size of 6, there is at least a 5% chance of getting 1 defect even for 1% bad, so getting one defect is not 95% sure evidence the lot is bad. For 6 (and up to 35 samples) you would need to 2 defects to ensure the lot is bad.

Note that for a sample of 300, 0 defects will ensure you it is good, 7 defects will ensure you it is bad, but anything in between is indeterminant.

You will find it challenging to show the boxes are good. It will be much easier to show the boxes are bad.


Tim F

P.S. I'm assuming that the orders are considered either right or wrong - for example a box with 1000 parts and 999 correct would still be considered a single defect, not a 99.9% success. Also, these numbers assume the sample is much smaller than the total, which is only sort of true for 300 out of 1500.
__________________
To wonder is to begin to understand.
  #4  
Old 14th December 2005, 09:25 AM
pabloquintana's Avatar
pabloquintana pabloquintana is offline
Inactive Registered Visitor

 
Registration Date: Nov 2005
Location: Honduras
 
Posts: 42
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 35
Karma: 20
pabloquintana has less than 100 Karma points so far.
Here is a very good link.

http://www.joma.org/mathDL/4/?pa=con...odeId=428&pf=1
  #5  
Old 14th December 2005, 01:05 PM
Bev D's Avatar
Bev D Bev D is offline
Heretical Statistician

 
Registration Date: Jan 2003
Location: New England
 
Posts: 2,568
Thanks Given to Others: 1,005
Thanked 1,691 Times in 1,033 Posts
Karma Power: 324
Karma: 12926
Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.
Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.
you could also use the poisson instead of the binomial - it will give you the same sample size for this case. you must accept on 0 and reject (revert to 100% sampling) on 1 bad box with this formula:

n = -natural log(1-confidence) / fraction defective (p)

in your case the math = -natural log(1-.95) / .01

pabloquintana has an important caveat: if you have widely varying quality (really good with small bursts of bad) then you will have less 95% probability of detecting the bad in teh short run. If you truly randomply sample you will have 95% protection in the long run, but be prepared to miss the goal.

Unfortunately with categorical sampling, there is no 100% protection of zero defects. (unless of course you use 100% sampling with a true poke yoke device)
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection, Prints (Drawings), Testing, Sampling and Related Topics

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Various “QMS” packages on the market - Which software package? GaryBC Quality Assurance and Compliance Software Tools / Solutions 13 4th October 2011 09:31 AM
Test Package Contents Requirements - Hydraulic Piping and Pressure Testing berlinmony Other ISO and International Standards and European Regulations 4 11th November 2010 06:22 AM
APQP Timing Plan Details and APQP Package Contents (e.g.: floor plan) - Batch Mfg. mechhari22 APQP and PPAP 5 17th January 2010 01:29 AM
Sampling Plan Software Packages - Implementing ANSI Z1.4 & Z1.9 (or ISO equivalent) czielsdorff Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2 3rd July 2007 01:33 PM
Sampling plan to detect defective units - Given N=6000, PPM=500 keatwoon Inspection, Prints (Drawings), Testing, Sampling and Related Topics 20 12th February 2006 03:25 PM



The time now is 12:33 AM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, Olde West Chester, Ohio 45069-1929
513 341-6272