The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Manufacturing and Related Processes


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 12th January 2006, 07:04 PM
Matt Swartwood Matt Swartwood is offline
Registered Visitor

Registration Date: Jan 2004
Location: Arkansas
 
Posts: 55
Thanks Given to Others: 3
Thanked 28 Times in 19 Posts
Karma Power: 34
Karma: 472
Matt Swartwood is appreciated, and has over 400 Karma points.Matt Swartwood is appreciated, and has over 400 Karma points.Matt Swartwood is appreciated, and has over 400 Karma points.Matt Swartwood is appreciated, and has over 400 Karma points.Matt Swartwood is appreciated, and has over 400 Karma points.
Question Metal forming - Brake presses - Need error-proofing advice

Good afternoon all. Unfortunately it seems that lately I am only on here when I have a question or need help. For that, I apologize; business has had me on the road or in the air the last few months.

I do; however, have a question to those who have dealt with Metal stamping, primarily Brake Presses. We are a job shop on a large scale and at the moment produce about 10,000 different part numbers. Our brake press department currently and consistently contributes the largest amount of product to the PPM. My question is how do you error-proof a process that is 80% operator driven and 20% machine/product variation without hindering production demands? It is very difficult to build guides or locating pins due to the amount of movement and different positions required to manufacture the part. In addition, brake press tooling is considered perishable tooling and is not generally purchased to run a single part; more like a multitude of parts.

Our company is very prevention oriented and I am highly opposed to resorting to detection methods (check fixtures or 100% inspection) just because we have hit a stumbling block. Although the check fixtures would prevent product from getting out to the customer, the amount of investment it would take to build fixtures for every part and the productivity losses incurred with the additional inspection is just not feasible.

I believe that we have a much broader problem than just the lack of error proofing in the department, but still think it should be one of the items addressed. I am starting a fairly detailed benchmarking campain, which includes the comparison of the following (but not limited to):

--Orientation of new hires and previous experience
--Training program and the verification of effectiveness
--Length of service at their current position
--Pay rate and the class of technicians they are able to acquire (we are not in an industrial area).
--Turnover rates
--Mistake-proofing methodologies
--Technological advancements available for equipment
--Types of product produced
--Types and quality of material used
--Customer specific requirements


Having said all of that, I hope to identify what is causing the higher PPM rate (may be a multitude of things). Anyway, back to the subject; any suggestions on what we could do to improve the mistake proofing methodologies for our brake presses? Any advice you could offer would greatly be appreciated.
Reply With Quote

Sponsored Links
  #2  
Old 12th January 2006, 08:04 PM
Ron Rompen's Avatar
Ron Rompen Ron Rompen is offline
Involved - Posts

Registration Date: Oct 2004
Location: Kitchener, Ontario Canada
Age: 54
 
Posts: 208
Thanks Given to Others: 5
Thanked 12 Times in 9 Posts
Karma Power: 46
Karma: 1068
Ron Rompen is appreciated, and has over 900 Karma points.Ron Rompen is appreciated, and has over 900 Karma points.Ron Rompen is appreciated, and has over 900 Karma points.Ron Rompen is appreciated, and has over 900 Karma points.Ron Rompen is appreciated, and has over 900 Karma points.Ron Rompen is appreciated, and has over 900 Karma points.Ron Rompen is appreciated, and has over 900 Karma points.Ron Rompen is appreciated, and has over 900 Karma points.
Send a message via AIM to Ron Rompen
Default

If you are running 10,000 different parts, how can you NOT invest the necessary money in dedicated fixturing?

I have worked in a brake-press shop before, and every part that we made had the necessary fixturing.

80% operator-driven is (IMHO) an incorrect interpretation of the problem; the operators are unable to consistently produce a quality part because they are not given the tools they need to do it. This is NOT an operator failure, it is a management failure.

Fixturing can (I am sure) be designed which can be easily and quickly modified from one part to another.....all it takes is some effort and commitment of resources.
__________________
Ron S Rompen
Goju Ryu
Kitchener, Ontario

Do other dogs think that poodles are members of some strange religious cult?
Reply With Quote
Sponsored Links

  #3  
Old 12th January 2006, 10:47 PM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Default

I would think that at the contract stage this issue would be addressed.

I remember a client that wanted 100% conforming product at one place I worked. The contract was accepted where it was known there was no way, considering the volumes, to provide 100% unless an optical system was used (which of course was out of the question). Needless to say, nonconforming product got out from time to time.

Reality stares you in the face sometimes.
__________________
A Search is a terrible thing to waste!
One Test is Worth 1000 Expert Opinions - The plural of anecdote is not data.
We can't solve problems by using the same kind of thinking we used when we created them. - Unknown
Reply With Quote
  #4  
Old 12th January 2006, 11:31 PM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

Registration Date: Sep 2003
Location: Illinois
 
Posts: 7,534
Thanks Given to Others: 182
Thanked 1,127 Times in 762 Posts
Karma Power: 397
Karma: 11090
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Default

Ron and Marc probably reflect what 90% or more Covers would respond - Deming and Red Beads demonstrate that the bulk of nonconforming parts are due to the process, not the operator.

Mistake proofing is a favorite topic of mine. It works best when you have a complete root cause investigation of the nonconformities you produce. It may very well be some sort of mistake proof fixturing is necessary to eliminate the common causes of error.

Please do not lull yourself into believing "mistake proofing" is the same as "brainstorming." The very best mistake proofing comes from engineers who know how a process works and should work before suggesting "fixes." This is not a time for a bunch of know nothings to sit in a room with lots of caffeinated beverages and shout out stuff like "Why don't we . . . .?

Brake press operations depend upon the order in which multiple bends are made to assure the most error-free finished product. The order in which the bends are made is contained in the Control Plan. Just like most businesses, the control plan should include a list of "evaluation flags" (some call them "traffic lights" or something similar) which are readily apparent to signal a stop to refixture a part if the process begins making nonconforming material. Sometimes, it can be as simple as keeping one "Gold Standard" part at the machine so it can be held up for a visual comparison, especially on those characteristics which experience says may cause the most problems in delivering an error free product to a buyer.
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857

Last edited by Wes Bucey; 18th January 2006 at 02:26 PM. Reason: change "no nothing" to "know nothing" (Excuse - brain freeze)
Reply With Quote
  #5  
Old 13th January 2006, 09:45 AM
Matt Swartwood Matt Swartwood is offline
Registered Visitor

Registration Date: Jan 2004
Location: Arkansas
 
Posts: 55
Thanks Given to Others: 3
Thanked 28 Times in 19 Posts
Karma Power: 34
Karma: 472
Matt Swartwood is appreciated, and has over 400 Karma points.Matt Swartwood is appreciated, and has over 400 Karma points.Matt Swartwood is appreciated, and has over 400 Karma points.Matt Swartwood is appreciated, and has over 400 Karma points.Matt Swartwood is appreciated, and has over 400 Karma points.
Default

Thank you for all of the responses. I did not thoroughly explain the magnitude (or lack thereof) of the situation, but probably should have. The PPM's aren't catastrophic; we are just looking to improve the process. As stated before we have 10K different parts; each run could be 10-500 pieces, dependant on customer requirements. We don't produce entire lots of discrepant parts (normally). Generally, when issuing RMA's it is for 1-5% of the lot run (or just a couple of pieces). We see issues like:
--part wasn't against the back stop
--part crooked
--part backwards
--part formed on the wrong end

We currently have a very thorough APQP process that identifies potential problem areas. Also, our FMEA's and control plans are geared to detect potential PPM hazards. However, without an inspection frequency of 100% or a steadfast error-proofing process, the likelihood of detecting those one or two pieces is slim.

That is why we want to look into other avenues, if any are available. I am in hopes that during the benchmarking process, I can find new machine/part gaging technologies available such as moving guides or pinned plate holders. I am sure that our company could design something of the sort..... Maybe that's my answer.
Reply With Quote
  #6  
Old 13th January 2006, 10:16 AM
Jim Wynne's Avatar
Jim Wynne Jim Wynne is offline
Courtesy Access

Registration Date: Jan 2005
Location: Southeast Wisconsin
Age: 57
 
Posts: 9,211
Thanks Given to Others: 755
Thanked 2,293 Times in 1,547 Posts
Karma Power: 611
Karma: 20380
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by Wes Bucey

The order in which the bends are made is contained in the Control Plan.
I think it might be more accurate to say "work instructions" than "Control Plan" especially with capital letters. An automotive-type control plan (and the phrase is usually associated with the AIAG form) wouldn't normally include detail down to the order of bends. There might be a process step that is called "bending" and associated controls might be listed, but in general the down-and-dirty details are found in a router or work instructions.

That said, I'll add a word about "conformity." Sometimes the goal of 100% conformance leads us away from where we need to be, imo. Actually, it might be more accurate to say that the definition of "conformance" is the problem. There might be instances where making "bad" parts isn't necessarily a bad thing in the final analysis, so long as everyone agrees on the goal. The impetus for a job shop should be to supply customers with what they need in order to keep their customers happy, and to make a reasonable amount of money doing it. This involves not perfection of processes (an unattainable goal), but optimization of them--making them as good as can reasonably be expected, given known constraints. So if the best, most economical way to get the customer 500 "good" parts on time is to make 510 of them and tell them to throw bad ones away and keep the extra good ones, if there are any, then that's what should be done. It's not a difficult thing to convince a customer that he might come out ahead, and save all of the soft costs associated with pointless corrective action processing. The point is that there should be no universal definition of "nonconformance"--it should be defined for each job.
__________________
Some men are born mediocre, some men achieve mediocrity, and some men have mediocrity thrust upon them.-- Joseph Heller
Reply With Quote
  #7  
Old 18th January 2006, 02:19 PM
CarolX's Avatar
CarolX CarolX is offline
Super Moderator

Registration Date: Jun 2000
Location: North of Chicago,Illinois, USA
Age: 49
 
Posts: 2,087
Thanks Given to Others: 419
Thanked 314 Times in 234 Posts
Karma Power: 176
Karma: 4810
CarolX is appreciated, and has over 1700 Karma points.
CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.
Default

Hi Matt,

Sorry I didn’t see your post until just now. And I can give you my input.

I work for a company that is pretty much on parr with yours. We, too, are large job shop, with runs between 10-500 pieces, with similar return rates for the same issues…..

First, we have to admit the really obvious…..we have humans placing parts against the backstop. In order to form a perfect part each and every time, the operator must place that part against the stops, perpendicular to the stop, with the same force, the correct bend order, in the correct burr direction. Add in things like operator attention, fatigue, distractions…I could go on all day listing the potentials for defect in this area.

I bet your don’t have the same problem with your punch presses. With your punches, you load your tools, load the program, and punch your parts. Most of the work is done with the punch press. Yes, there are some operator dependant steps, but they are miniscule compared to the press brakes.

From my experience, you can 300% inspect the part, and still have returns. It is the human factor.

Our solution….automate. In the past 2 years we have purchased 7 robotic press brakes. Are they perfect, no, but they are reducing our returns for forming errors.
__________________
CarolX

Theater is life, film is art, and television is furniture.
Reply With Quote
  #8  
Old 18th January 2006, 03:53 PM
Jim Howe Jim Howe is offline
E-Mails Invalid or Rejected

Registration Date: Jun 2004
Location: Ohio
 
Posts: 415
Thanks Given to Others: 0
Thanked 2 Times in 2 Posts
Karma Power: 0
Karma: 225
Jim Howe is appreciated, and has over 200 Karma points.Jim Howe is appreciated, and has over 200 Karma points.Jim Howe is appreciated, and has over 200 Karma points.
Default brake press

Quote:
So if the best, most economical way to get the customer 500 "good" parts on time is to make 510 of them and tell them to throw bad ones away and keep the extra good ones, if there are any, then that's what should be done.
This reminds me of the Pershing II radar guidence system that I worked on back in the late 80's. We had a delivery problem of finished units because our magnetron supplier could not deliver enough magnetrons per month that met US Army criteria. After several meetings with our supplier we found out that the US Navy used the same magnetron in one of its missiles but was on the low end of the power curve. The supplier would make the magnetron, test them, deliver the high power curves to us (obviously a lower amount) for Army missiles and send the lower power curves ( higher amounts) to the Navy. Solution was to make the pie bigger. Some how the Prime convinced the Pentagon that if they would order more missiles for the Navy the Army's delivery of missiles would improve dramatically! It did and the P-II's were deployed on time.

As to the subject matter our brake and roll presses are layed out by hand (large parts) and fixturing is on hand to check radii and degrees of bend. In our sister plants that do a higher volume CNC's are used but the fixturing is there to check on a sample basis.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Manufacturing and Related Processes

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Error Proofing vs. Mistake Proofing - Differences? sathis Definitions, Acronyms, Abbreviations and Interpretations 11 22nd November 2006 04:22 PM
Are Error Proofing Statistics Correct crendfrey Nonconformance and Corrective Action 20 9th September 2006 12:10 PM
Error-Proofing vs. Mistake-Proofing - Differences David McGan Definitions, Acronyms, Abbreviations and Interpretations 5 28th April 2006 02:19 PM
Fun with Metal Forming 101 Marc Manufacturing and Related Processes 20 29th April 2005 05:17 PM
Error Proofing In Every Corrective Action? alexfox QS-9000 - American Automotive Manufacturers Standard 2 19th June 2003 02:36 PM



The time now is 05:55 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts