Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page  Elsmar Cove Twitter Feed
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Donate and $ Contributor Forum Access

Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:

Howard's
International Quality Services
Marcelo Antunes'
SQR Consulting
Bob Doering's
Correct SPC - Precision Machining

NIST's Engineering Statistics Handbook
IRCA - International Register of Certified Auditors
SAE - Society of Automotive Engineers
Quality Digest Portal
IEST - Institute of Environmental Sciences and Technology
ASQ - American Society for Quality
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 1st February 2006, 12:51 PM
Icy Mountain's Avatar
Icy Mountain

 
 
Posts: 884
I Say... Answering a Finding that is Not? Work instructions are not always followed

I need some help with this one. I couldn't even come up with a good title. Here's the (redacted) finding:

Requirement: validation of specific methods & procedures (7.5.1)
Failure: Work instructions are not always followed
Evidence: ...load currents are below spec. Note this will not affect product , & subsequent Ac/dc for performance tests are validated after endurance.

Simply put, we demonstrated a test for the auditor and the reading was outside the specifications listed in the procedure. This occured shortly before our production folks left for the day so I really couldn't go back and get to the bottom of it: The next morning (after the audit is over and the auditor has left, of course) the unit in question was processed according to our non-conforming product procedures. There was nothing wrong. Further investigation (not by me, just the Team doing what they're supposed to do) found that a load cone (big resistive thing sort of like a light bulb) on the test bed had failed. The team replaced it. The unit (and the fixture) were put back through the test procedure, just like we say in our procedures. Everything was just like the specification.

How do I answer this finding? Everything worked like it is supposed to work. I think my production tech obviously gave some pretty bad answers during the audit as to what was going on or this wouldn't have generated a finding. I'll admit that I was brain dead after two days. I probably should have been quoting what comes next (fix problem, rerun tests).

Sponsored Links
  #2  
Old 1st February 2006, 01:08 PM
Jim Wynne's Avatar
Jim Wynne

 
 
Posts: 14,077
Quote:
In Reply to Parent Post by Icy Mountain

I need some help with this one. I couldn't even come up with a good title. Here's the (redacted) finding:

Requirement: validation of specific methods & procedures (7.5.1)
Failure: Work instructions are not always followed
Evidence: ...load currents are below spec. Note this will not affect product , & subsequent Ac/dc for performance tests are validated after endurance.

Simply put, we demonstrated a test for the auditor and the reading was outside the specifications listed in the procedure. This occured shortly before our production folks left for the day so I really couldn't go back and get to the bottom of it: The next morning (after the audit is over and the auditor has left, of course) the unit in question was processed according to our non-conforming product procedures. There was nothing wrong. Further investigation (not by me, just the Team doing what they're supposed to do) found that a load cone (big resistive thing sort of like a light bulb) on the test bed had failed. The team replaced it. The unit (and the fixture) were put back through the test procedure, just like we say in our procedures. Everything was just like the specification.

How do I answer this finding? Everything worked like it is supposed to work. I think my production tech obviously gave some pretty bad answers during the audit as to what was going on or this wouldn't have generated a finding. I'll admit that I was brain dead after two days. I probably should have been quoting what comes next (fix problem, rerun tests).
What was the status of the unit tested in the auditor's presence? Was it assumed to be "good," or was it awaiting testing? If the unit was just a poor example (i.e., there was a problem that would have been identified during normal processing), I wouldn't answer the NC, but I would ask for the NC to be withdrawn after giving an explanation. If there was no actual nonconformance, just a misunderstanding, then there shouldn't be a finding. At the same time, and assuming my surmisal is correct, there might be an issue with the fact that the status of the unit wasn't apparent.
Sponsored Links

  #3  
Old 1st February 2006, 01:11 PM
JRKH's Avatar
JRKH

 
 
Posts: 956
Question...

The finding says that:

"Work instructions are not always followed"

What part of the instruction was not followed? If you ran a test for the gentleman and the item failed that in itself is not a failure to follow work instructions.

If the finding is based solely on this you could either contest it, or write some verbiage to the effect that you reviewed the process against the instructions and discussed the finding with the operator and found no problem.

James
  #4  
Old 1st February 2006, 01:23 PM
Icy Mountain's Avatar
Icy Mountain

 
 
Posts: 884
Jim(s):
You are both headed in the same direction that I am. The unit in question was undergoing a 2 hour, full load, qualification test. We measure the load at the beginning of the test to make sure it is in specification and is really "full load". We measure again at the end to make sure the unit is still operating and providing power at the full load specification.
Quote:
In Reply to Parent Post by Jim Wynne

What was the status of the unit tested in the auditor's presence? Was it assumed to be "good," or was it awaiting testing? If the unit was just a poor example (i.e., there was a problem that would have been identified during normal processing).... At the same time, and assuming my surmisal is correct, there might be an issue with the fact that the status of the unit wasn't apparent.
The unit was "good" when we initially set up the test. We demonstrated the test for the auditor in the middle of the 2 hour run and found that the "load" was not in specification. So we basically determined the status of the unit as being questionable at that point. This problem would have been found when we checked the unit at the end of the test, per the procedure. Obviously, we didn't do a good job of explaining what comes next (i.e. treat product as non-conforming, determine cause, fix cause, retest product).

P.S. - I emailed a longer and more detailed explanation to the auditor before posting here. I am awaiting an answer. I posted this here for "consulting" since we wouldn't want to get that from a registrar's auditor (TIC). Also, I figured that this would make a good example to point to from the ISO/TS16949 Registration Maintenance Diary.

Last edited by Marc; 1st February 2006 at 07:02 PM. Reason: Add Post-Script
  #5  
Old 1st February 2006, 06:50 PM
Hershal's Avatar
Hershal

 
 
Posts: 2,363
A question here.....

If the requirement is validation of procedures, how does a fault during a test affect the validation? Would not the procedure have already been validated?

Hershal
  #6  
Old 1st February 2006, 08:00 PM
Greg B's Avatar
Greg B

 
 
Posts: 831
Quote:
In Reply to Parent Post by JRKH

The finding says that:

"Work instructions are not always followed"

What part of the instruction was not followed? If you ran a test for the gentleman and the item failed that in itself is not a failure to follow work instructions.

If the finding is based solely on this you could either contest it, or write some verbiage to the effect that you reviewed the process against the instructions and discussed the finding with the operator and found no problem.

James
Icy, I have to agree with Jim (and I think you support the same idea). The procedure was OK...you just identified a NC Product. How come this NC (from the registrar) was not discussed during a close out meeting and debated? Or was it? I hate it when registrars are ambiguous or just plain WRONG.
  #7  
Old 1st February 2006, 08:14 PM
Ron Rompen's Avatar
Ron Rompen

 
 
Posts: 408
I think the real question here is; what Work Instruction wasn't followed?

Do you have a reaction plan for NC product? (Of course you do, it's a rhetorical question).

Does the operator know and (more importantly) understand the reaction plan? If so, did he follow it?

If he DID follow the RP, then there is no non-conformance....much as some registrars, auditors and (especially) consultants would like us to believe, having a QM system in place does NOT guarantee zero defects produced...it shoudl (hopefully) guarantee zero defects escaping to the customer.

If your operator did NOT follow the RP, then there is a non-conformance, in that the company failed to provide adequate training/tools/supervision to ensure that (s)he (gods, i'm starting to talk like a manager already) was able to properly perform all the tasks associated with the job.

I do agree with the others, however, that this should have been something discussed in the wrap-up meeting, and you should have been given a chance to respond then. Unfortunately, a lot of 'new' auditors are trying to win their spurs, due to the bad rep that QS had, and are being more stringent in the interpretation of the rules than they need to be (IMHO)
  #8  
Old 1st February 2006, 10:34 PM
AndyN's Avatar
AndyN

 
 
Posts: 7,838
Laughing I'd choose the Forest Gump clause.......

"Stuff Happens" (or something like that). What I mean is, there will always be times when something fails. Not a fault of an ineffective calibration/maintenance program, or failure to follow procedures etc. It might be reasonable to call it a random failure, especially if there's no records of failures during test (do you record them as part of test protocols??)

Andy
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO/TS 16949 - International Automotive Quality Systems Standard

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Work Instructions - What are the Requirements for Work Instructions? rharold Documentation Control Systems, Procedures, Forms and Templates 26 6th June 2008 01:36 AM
Work Instructions - Processes - Does all machinery need to have work instructions? rharold ISO 9000, ISO 9001, and ISO 9004 - Questions and Discussions 9 1st December 2006 10:53 AM
Work Instructions - Conflict? Toyota's method for creating work instructions Toefuzz - 2006 ISO 9000, ISO 9001, and ISO 9004 - Questions and Discussions 7 21st February 2006 11:34 AM
Work Instructions 4.9.1 - Work instructions must be readily accessible qalady QS-9000 - American Automotive Manufacturers Standard 8 15th August 2000 04:39 PM
Work Instructions - How detailed do work instructions need to be? Joe_1 QS-9000 - American Automotive Manufacturers Standard 6 12th August 1999 11:42 AM



The time now is 04:11 AM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, Olde West Chester, Ohio 45069-1929
513 341-6272
NOTE: This forum uses "cookies".