The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Lean - Lean in Manufacturing and Services


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 3rd February 2006, 01:27 PM
imanewbie imanewbie is offline
Inactive Registered Visitor

Registration Date: Jan 2006
Location: Ontario, Canada
Age: 37
 
Posts: 1
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 16
Karma: 10
imanewbie has less than 100 Karma points so far.
Please Help! Lean in the Tool and Die Industry (Job Shop) - Applying Lean in "one-off" production

As a Quality Manager moving from an automotive mass-production company to the tool and die industry (making injection molds and die cast dies), I was wondering if anyone has any experience in implementing Lean techniques in similar industries (e.g. construction, custom machinery/ equipment, etc.). I'm very familiar with Lean principles, but I'm in uncharted waters in a new industry.

We typically design and produce one copy of a mold (mould for us Canadians ), consisting of 50-100 components - excruciating design work, custom manufacturing process for each component. Each mould is designed and built in about 8-12 weeks.

I've only been here a short time (about a year), but I definitely see that there is huge $$$$ potential, industry-wide, to apply Lean.

Just wondering if anyone has experience applying Lean in the "one-off" type of industries - what techniques work/ don't work, pitfalls, obstacles, or any other glimmering nuggets of advice.
Reply With Quote

Sponsored Links
  #2  
Old 3rd February 2006, 02:13 PM
jmp4429 jmp4429 is offline
Involved in Discussions

Registration Date: Mar 2005
Age: 29
 
Posts: 231
Thanks Given to Others: 0
Thanked 3 Times in 3 Posts
Karma Power: 39
Karma: 758
jmp4429 is appreciated, and has over 700 Karma points.jmp4429 is appreciated, and has over 700 Karma points.jmp4429 is appreciated, and has over 700 Karma points.jmp4429 is appreciated, and has over 700 Karma points.jmp4429 is appreciated, and has over 700 Karma points.jmp4429 is appreciated, and has over 700 Karma points.jmp4429 is appreciated, and has over 700 Karma points.
Default

This is a great question that I don't know the answer to. However, the first thing that popped into my head was that Goldratt's "Critical Chain" might help!
Reply With Quote
Sponsored Links

  #3  
Old 3rd February 2006, 02:30 PM
Rob Nix's Avatar
Rob Nix Rob Nix is offline
qualitas ad nauseam

Registration Date: Sep 2003
Location: Saginaw, Michigan
Age: 50
 
Posts: 653
Thanks Given to Others: 3
Thanked 34 Times in 15 Posts
Karma Power: 79
Karma: 2016
Rob Nix is appreciated, and has over 1700 Karma points.Rob Nix is appreciated, and has over 1700 Karma points.Rob Nix is appreciated, and has over 1700 Karma points.Rob Nix is appreciated, and has over 1700 Karma points.Rob Nix is appreciated, and has over 1700 Karma points.Rob Nix is appreciated, and has over 1700 Karma points.Rob Nix is appreciated, and has over 1700 Karma points.Rob Nix is appreciated, and has over 1700 Karma points.Rob Nix is appreciated, and has over 1700 Karma points.Rob Nix is appreciated, and has over 1700 Karma points.Rob Nix is appreciated, and has over 1700 Karma points.Rob Nix is appreciated, and has over 1700 Karma points.
Default

First of all, great moniker and good first post! Welcome "ima"
Quote:
Originally Posted by imanewbie

Just wondering if anyone has experience applying Lean in the "one-off" type of industries
Yes I have.

Take all that you have learned about "lean" from the past, and look - not at the individual techniques (e.g., VSM, takt times, 5S, etc), but - at the "principles" of lean; they apply to any industry. Think about the basic ideas of being lean, use standard problem solving techniques, and you will find (as you already noted) a goldmine of opportunities.

The point is, don't rigidly stick to the tools as they have taught you to use them, but modify them so they work for you. Here's a couple of examples:

- In our T&D shop (making ones and twos of things) a group looked at perishable tooling usage and centralized ALL tooling, using a library type check out system.
- In our special machine design and build facility we used a spaghetti diagram to illustrate how manufactured details traveled inefficiently through the shop, and we streamlined it.

The key areas to focus on are the steps taken to process a job from start to finish, and especially, the communication effectiveness from one area/department to the next. Often we have found what we call "legacy" {or better yet, Sisyphian} activities (things that we've always done; copies to so-and-so, creation of some specialized report, etc.) that are no longer relevant. Anyway, you get the drift. I'll stop blabbering now.
__________________
Rob - The sum of anecdotes is not data. -Roger Brinner
Reply With Quote
  #4  
Old 4th February 2006, 02:37 AM
gszekely gszekely is offline
Involved - Posts

Registration Date: Nov 2005
Location: Hungary
 
Posts: 205
Thanks Given to Others: 28
Thanked 52 Times in 36 Posts
Karma Power: 36
Karma: 762
gszekely is appreciated, and has over 700 Karma points.gszekely is appreciated, and has over 700 Karma points.gszekely is appreciated, and has over 700 Karma points.gszekely is appreciated, and has over 700 Karma points.gszekely is appreciated, and has over 700 Karma points.gszekely is appreciated, and has over 700 Karma points.gszekely is appreciated, and has over 700 Karma points.
Default Lean Moldmaking

I use to read the publicatons at:
http://www.moldmakingtechnology.com/...=MR02&zone=MMR
You will find plenty of opportunities.
György
Reply With Quote
  #5  
Old 4th February 2006, 06:21 PM
Helmut Jilling Helmut Jilling is offline
Auditor/Consultant

Registration Date: Aug 2005
Location: Ohio
Age: 55
 
Posts: 3,415
Thanks Given to Others: 389
Thanked 680 Times in 473 Posts
Karma Power: 188
Karma: 5128
Helmut Jilling is appreciated, and has over 1700 Karma points.
Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by Rob Nix

The key areas to focus on are the steps taken to process a job from start to finish, and especially, the communication effectiveness from one area/department to the next. Often we have found what we call "legacy" {or better yet, Sisyphian} activities (things that we've always done; ...that are no longer relevant.

I had a perfect example of how to apply Lean in an audit at a mold shop. Each mold is different, but the processes are common to all, machining, finishing, final inspection, etc.

I observed at final inspection, molds would have dozens of "red marks" where additional finishing was needed. As an auditor, I often ask "naive" questions on purpose. So, I asked, "why do you have so much 'rework' on your molds?"

They replied, "Well, you have to understand the mold business...that's not rework, that's part of the process." I said I do understand the mold business, then we had the following audit discussion (shortened version)"

AUD: "Who does the 'rework'?"
CLIENT: "The same guys who did it the first time."
AUD: "The same guys who did it 'wrong" the first time, are able to do it right the second time?"
CLIENT: "Well, yeah..."
AUD: "Why don't they just do it right the first time?"
CLIENT: "Well, this is how it's always been done in the mold business."
AUD: "They're s'pose to do it wrong the first time, so you can mark it red, so they can fix it the second time?"
CLIENT: "Well, not exactly like that."..."But you have to understand the mold business..."
AUD: "No, I understand the mold business...But I think you need to understand the ISO business. If they can do it right the second time, then they have demonstrated competence and ability for the task. If they can do it right the second time, then theoretically, they could do it right the first time. What would happen if you asked them to just do the second pass, the first time, and skip the first one...?"
CLIENT: "Ummm..." at this point the CEO stepped in and said, "the auditor is right. You allow the finishers to not hit the mark the first time, knowing if it is a problem, the inspector will flag it and send it back. That's inefficient QC and wastes a lot of cycle time and money. We're going to meet with them and redefine the standards, and hold them to it."

The shop guys were not convinced about this, but six months later the red mark average per mold had dropped from 30+ to less than 12, and another six months most molds go through with no red markings at all.

I think this is a perfect example of applied Lean in a Mold Shop.

(PS: it is also an example of how an auditor can do a value added audit without consulting by asking pointed questions as I proposed in another thread).
Reply With Quote
  #6  
Old 4th February 2006, 10:11 PM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

Registration Date: Sep 2003
Location: Illinois
 
Posts: 7,536
Thanks Given to Others: 182
Thanked 1,127 Times in 762 Posts
Karma Power: 397
Karma: 11090
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Default

Kudos to the CEO who had an Epiphany and saw the light. Kudos, also, to everyone who stayed with the program for an entire year. I hope they all patted themselves on the back and the boss sprung for a pizza party to celebrate.

The critical parts of hjilling's story for me are:
  1. he got the CEO to sit in on and participate in the discussion
  2. hjilling got past the "not made here" attitude
  3. apparently the CEO made sure folks followed through for an entire year (the most remarkable part of the anecdote)
For change agents everywhere:
The most difficult part of change is getting the folks to admit there are some things which can be done more efficiently and then convincing them to be so dissatisfied with the status quo THEY are motivated to change to something easier and more profitable for themselves. So, it often boils down to the age old question most folks ask when they are requested to change:
"What's in it for me?"
If the change agent can make the answer more attractive than doing nothing, he has a great probability of implementing the change. All the mechanics of actually implementing, documenting, and evaluating the results of the change are secondary to getting the team on board in the first place.
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
Reply With Quote
  #7  
Old 6th February 2006, 01:04 AM
Helmut Jilling Helmut Jilling is offline
Auditor/Consultant

Registration Date: Aug 2005
Location: Ohio
Age: 55
 
Posts: 3,415
Thanks Given to Others: 389
Thanked 680 Times in 473 Posts
Karma Power: 188
Karma: 5128
Helmut Jilling is appreciated, and has over 1700 Karma points.
Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by Wes Bucey

Kudos to the CEO who had an Epiphany and saw the light. Kudos, also, to everyone who stayed with the program for an entire year. I hope they all patted themselves on the back and the boss sprung for a pizza party to celebrate.

The critical parts of hjilling's story for me are:
  1. he got the CEO to sit in on and participate in the discussion
  2. hjilling got past the "not made here" attitude
  3. apparently the CEO made sure folks followed through for an entire year (the most remarkable part of the anecdote)
For change agents everywhere:
The most difficult part of change is getting the folks to admit there are some things which can be done more efficiently and then convincing them to be so dissatisfied with the status quo THEY are motivated to change to something easier and more profitable for themselves. So, it often boils down to the age old question most folks ask when they are requested to change:
"What's in it for me?"
If the change agent can make the answer more attractive than doing nothing, he has a great probability of implementing the change. All the mechanics of actually implementing, documenting, and evaluating the results of the change are secondary to getting the team on board in the first place.

You hit the nail on the head. The best part, is 3 years later, they are still doing a great job with it.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Lean - Lean in Manufacturing and Services

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Lean "replacing" Quality/ISO - A System vs. A Tool JinkhinJ Lean - Lean in Manufacturing and Services 33 5th July 2009 09:30 PM
Written examination in Lean Production for students studying "production engineering" ekonom Lean - Lean in Manufacturing and Services 8 13th February 2007 10:45 AM
Help required on the "lean" concept - effect on the economics of countries CraigBEng Lean - Lean in Manufacturing and Services 12 2nd February 2007 08:26 AM
PFMEA on lean tools - Failure modes of a PFMEA of the tool "implementation process", nitron FMEA and Control Plans 6 16th December 2005 05:25 PM
Low Hanging Fruit - Lean Manufacturing Ideas for a Job Shop gibu2 Lean - Lean in Manufacturing and Services 9 24th May 2005 04:32 PM



The time now is 03:11 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts