The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Lean - Lean in Manufacturing and Services


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 13th February 2006, 11:14 PM
Cesar2005 Cesar2005 is offline
Obsessed to Quality

Registration Date: Aug 2005
Location: Philippines
 
Posts: 16
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 18
Karma: 10
Cesar2005 has less than 100 Karma points so far.
Please Help! Lot Cycle Time Measurement - Statistical explanation why 95%tile

Expert,

In my industry the lot cycle time performance is measured as Cycle time at 95%tile. Is there any statistical explanation why 95%tile and not plainly maximum or average Cycle time? Thanks for your input.
Reply With Quote

Sponsored Links
  #2  
Old 13th February 2006, 11:35 PM
Jim Wynne's Avatar
Jim Wynne Jim Wynne is offline
Courtesy Access

Registration Date: Jan 2005
Location: Southeast Wisconsin
Age: 57
 
Posts: 9,216
Thanks Given to Others: 755
Thanked 2,298 Times in 1,550 Posts
Karma Power: 612
Karma: 20405
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by Cesar2005

Expert,

In my industry the lot cycle time performance is measured as Cycle time at 95%tile. Is there any statistical explanation why 95%tile and not plainly maximum or average Cycle time? Thanks for your input.
I'm not an expert, but...

Percentile rankings are used to describe statistical distributions. or more precisely, how an individual compares to the distribution. In your case, you say that cycle times at the 95th percentile are used as some sort of performance standard. What this means is that 95% of the cases are either greater than or less than that figure, depending on what you're measuring (I suspect that the 95th percentile represents a relatively long cycle time). It's possible to do something similar with control charts. What industry are you in?
__________________
Some men are born mediocre, some men achieve mediocrity, and some men have mediocrity thrust upon them.-- Joseph Heller
Reply With Quote
Sponsored Links

  #3  
Old 13th February 2006, 11:41 PM
Cesar2005 Cesar2005 is offline
Obsessed to Quality

Registration Date: Aug 2005
Location: Philippines
 
Posts: 16
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 18
Karma: 10
Cesar2005 has less than 100 Karma points so far.
Default

Hi Jim, Thanks for your input . Understand why a percentile is used. What is not clear to me is why the number 95%, what becomes the basis of this number? can it be 97% or 98%? Is the selection of this number has something to do with the distribution shape (skewed as opposed to normal) etc etc. I'm into electronics industry.
Reply With Quote
  #4  
Old 14th February 2006, 10:12 AM
Jim Wynne's Avatar
Jim Wynne Jim Wynne is offline
Courtesy Access

Registration Date: Jan 2005
Location: Southeast Wisconsin
Age: 57
 
Posts: 9,216
Thanks Given to Others: 755
Thanked 2,298 Times in 1,550 Posts
Karma Power: 612
Karma: 20405
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Default

Who chose the number? It can be anything less than 100, I suppose (there is no 100th percentile because that would mean that a point exists outside of the entire population from which the point was drawn). I've personally never heard of using percentile rankings to describe cycle-time goals. The shape of the distribution isn't relative, because percentile rankings assume a normal distribution.
__________________
Some men are born mediocre, some men achieve mediocrity, and some men have mediocrity thrust upon them.-- Joseph Heller
Reply With Quote
  #5  
Old 14th February 2006, 11:55 AM
Tim Folkerts's Avatar
Tim Folkerts Tim Folkerts is offline
Forum Moderator

Registration Date: Sep 2003
Location: Kansas, USA
Age: 46
 
Posts: 900
Thanks Given to Others: 27
Thanked 249 Times in 150 Posts
Karma Power: 123
Karma: 3974
Tim Folkerts is appreciated, and has over 1700 Karma points.
Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.
Default

I expect that 95th percentile was chosen as a conservative estimate with no particular statistical significance.

For example, suppose the average cycle time was 1.0 hr, the 95% percentile was 1.5 hr and the max was 2.1 hr. How many cycles could you complete in an 8 hr shift? On average, you could do 8 cycles. Using the 95%-tile, you could be pretty sure of completing at least 5 cycles. At the worst, you might only finish only 3 cycles.

8 cycles is a good long-term expectation.
5 cycles is a pretty good estimate of the minimum of any day.
3 cycles is a worst-case scenario.

Nothing magic about 95%; just a handy conservative estimate.

Just my $0.02


Tim F
__________________
To wonder is to begin to understand.
Reply With Quote
  #6  
Old 14th February 2006, 05:01 PM
Steve Prevette's Avatar
Steve Prevette Steve Prevette is offline
Deming Disciple

Registration Date: Feb 2004
Location: Aiken, SC
 
Posts: 1,472
Thanks Given to Others: 60
Thanked 403 Times in 241 Posts
Karma Power: 190
Karma: 6872
Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.
Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.
Default

A couple of guesses:

90% and 95% confidence intervals are very common by tradition. And the 95th percentile gives 5% in the tail, corresponding to a 90% two sided confidence interval. It also corresponds to two standard deviations from the average for a normal distribution.

To know what the 95th percentile is, you have to collect at least 20 points. If you are specifying the 99th percentile, you need to collect at least 100 points - and a lot more to have any confidence in the figure, assuming you are doing this non-parametrically.

At least the person knew not to promise the average (or the median).
__________________
Steve Prevette
"A Passionate Statistician", ASQ CQE, Fluor Government Group
The opinion stated above does not necessarily reflect that of my employer.
Reply With Quote
  #7  
Old 14th February 2006, 10:28 PM
Bev D's Avatar
Bev D Bev D is offline
Heretical Statistician

Registration Date: Jan 2003
Location: New England
 
Posts: 1,134
Thanks Given to Others: 265
Thanked 516 Times in 340 Posts
Karma Power: 137
Karma: 4352
Bev D is appreciated, and has over 1700 Karma points.
Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by Steve Prevette


At least the person knew not to promise the average (or the median).
yes. without more info from the originator, my guess would be that the person who specified using the 95 percentile knwos a little about the Theory of Constraints. promising - or using - the average cycle time dooms you to failure...covarience comes into play and once you fall behind you can never catch up (anybody remember where Herbie is?)

However, without really knowing more details, we are only guessing
Reply With Quote
  #8  
Old 21st February 2006, 03:06 AM
Cesar2005 Cesar2005 is offline
Obsessed to Quality

Registration Date: Aug 2005
Location: Philippines
 
Posts: 16
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 18
Karma: 10
Cesar2005 has less than 100 Karma points so far.
Default

Quote:
Originally Posted by Jim Wynne

I've personally never heard of using percentile rankings to describe cycle-time goals. The shape of the distribution isn't relative, because percentile rankings assume a normal distribution.
Hi Jim, Sorry for getting you back on this one rather late. Anyway, CT Goal is expressed in days such as 5,6 or 7. But the collected data of different lots is expressed in terms of percentile. The 5% is considered maverick or out of the norm, there might be some assignable causes in these lots why they goes beyond the target CT.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Lean - Lean in Manufacturing and Services

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Improve the Cycle Time of Corrective Actions – What have I got myself into shane23 Nonconformance and Corrective Action 7 14th August 2009 06:52 PM
Takt Time vs. Cycle Time vs. Total Cycle Time tomccchang Lean - Lean in Manufacturing and Services 19 7th February 2009 11:05 AM
Statistical Analysis SPC Trend explanation needed bkarthikeyan SPC Monitoring and Statistical Analysis Techniques 4 18th August 2008 09:24 AM
Starting a Small Lot SPC (Statistical Process Control) program CMfgT SPC Monitoring and Statistical Analysis Techniques 3 7th April 2008 04:07 PM
Evaluating Processes - Cycle Time Concepts - Three Levels for any process Greg B Manufacturing and Related Processes 3 27th May 2003 06:03 AM



The time now is 10:00 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts