The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Reliability Analysis - Predictions, Testing and Standards


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 3rd March 2006, 05:25 AM
Bruce123 Bruce123 is offline
Inactive Registered Visitor

Registration Date: Mar 2006
Location: Indo
 
Posts: 1
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 16
Karma: 10
Bruce123 has less than 100 Karma points so far.
Please Help! Analysis of failing parts - Mining equipment distributor

Hi everybody, This is my first time ever using a forum so I hope it works. I'm trying to work out some things in excel but having great difficulty. I work for a mining equipment distributor and I'm trying to analysis some failing parts we are having with our machines. If possible would you be able to help me on a few issues.
I have attached a file with the data and what I'm trying to accomplish.
Attached Files: 1. Scan for viruses before using, 2. Please report any 'bad' files by Reporting the post it is in, 3. Use at your Own Risk.
File Type: xls Sample.xls (13.5 KB, 118 views)
Reply With Quote

Sponsored Links
  #2  
Old 3rd March 2006, 08:18 AM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

Registration Date: Sep 2003
Location: Illinois
 
Posts: 7,534
Thanks Given to Others: 182
Thanked 1,127 Times in 762 Posts
Karma Power: 397
Karma: 11090
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Default

Frankly, I think I would look at a root cause for the failures before implementing a statistical analysis. Are the bolts ALL performing the same function (as in a conveyor chain?) Are the bolts failing the same way (shearing? coming unscrewed from the nut or the fixture? unknown because they are popping out and lost in the mined material?)

Without an investigation into the root cause of the failure, the analysis you propose will only add numbers to a problem you already know you have; it will do little to help you reduce or eliminate the problem.

Once you know the causes (there are probably several - I can imagine the shearing or abrading on the bolts holding the teeth of the mining equipment as it digs into the workface of the substrate or bolts vibrating loose elsewhere on the equipment from the regular or random vibration), you can do a statistical analysis focusing on each of the several causes to determine a maintenance schedule to examine and replace bolts which show excessive wear, distortion prior to shearing or loose from vibration to maximize the uptime BEFORE failure puts an unexpected halt to operations.

Note there are two courses of action available:
  1. establish a schedule of routine maintenance to inspect and replace bolts before failure hinders operations
  2. examine the causes of failure and reduce or eliminate the number of events by using a different bolt or fastening method.
Afterthought:
It occurs to me the bolts may be sacrificial and intended to fail first before more expensive equipment fails (like a shear pin.) If so, and bolts all have same function, the question is either
  1. to eliminate or reduce the excess stress which causes failure (an unlikely scenario - operators are unlikely to change mining technique) or
  2. to track the events which are known to cause bolt failure and use those events as the scheduling method to inspect and replace failed bolts (like replacing air bags on cars after an accident, whether the bags deployed or not.)
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
Reply With Quote
Sponsored Links

  #3  
Old 3rd March 2006, 10:04 AM
Jim Wynne's Avatar
Jim Wynne Jim Wynne is online now
Courtesy Access

Registration Date: Jan 2005
Location: Southeast Wisconsin
Age: 57
 
Posts: 9,212
Thanks Given to Others: 755
Thanked 2,295 Times in 1,549 Posts
Karma Power: 611
Karma: 20390
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by Wes Bucey

Without an investigation into the root cause of the failure, the analysis you propose will only add numbers to a problem you already know you have; it will do little to help you reduce or eliminate the problem.
That's the crux of the issue. Given the data you posted, you know that about 66% (of the failed bolts) fail within 1000 hours, and that fewer than 1% survive 1600 hours. After 1000 hours the failure rate trends downwards at about the same rate it increases prior to 1000 hours. I also notice that your "buckets" overlap; for example, 800 hours is counted in two groups.

There is some prime data missing. What sort of a population are we talking about? Your data address 108 failed bolts. If the total population is 108 (e.g., all bolts fail within 1600 hours) your strategy might be different than if the population is 10,000 or 10,000,000. The significance of failure is also important; as Wes suggests, if they're shear bolts that are expected to fail as a protective measure, it's a different problem than if the bolts are expected to perform indefinitely. It's also a different problem if, when the bolts fail, a 12-ton object falls and crushes people, as opposed to just creating an annoying inconvenience for the customer.

I also agree with Wes in advising you to (if you haven't already) ascertain why the bolts are failing in terms of what's expected of them. Premature failure of fasteners is almost always due to one of three causes: poor design of the assembly being held together by the fasteners, "bad" fasteners, or misuse of the equipment by the end user. How you approach the problem depends on the cause.
__________________
Some men are born mediocre, some men achieve mediocrity, and some men have mediocrity thrust upon them.-- Joseph Heller
Reply With Quote
  #4  
Old 3rd March 2006, 12:48 PM
Michael Walmsley Michael Walmsley is offline
E-Mails Invalid or Rejected

Registration Date: Dec 2005
Location: US
 
Posts: 158
Thanks Given to Others: 1
Thanked 19 Times in 6 Posts
Karma Power: 0
Karma: 810
Michael Walmsley is appreciated, and has over 700 Karma points.Michael Walmsley is appreciated, and has over 700 Karma points.Michael Walmsley is appreciated, and has over 700 Karma points.Michael Walmsley is appreciated, and has over 700 Karma points.Michael Walmsley is appreciated, and has over 700 Karma points.Michael Walmsley is appreciated, and has over 700 Karma points.Michael Walmsley is appreciated, and has over 700 Karma points.
Caution

Both have darn good points.

Attached is a comparison.
Data analyzed without and with 100,000 bolt population assumption
along with final comparison.

Mike
Attached Files: 1. Scan for viruses before using, 2. Please report any 'bad' files by Reporting the post it is in, 3. Use at your Own Risk.
File Type: xls Results.xls (223.0 KB, 104 views)
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Reliability Analysis - Predictions, Testing and Standards

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Process Equipment Spare Parts Vendors - Evaluation and selection of suppliers - 7.4.1 Carol F. ISO 9001 - Quality Management Systems Standard 1 14th November 2008 06:27 PM
Service & Installation Parts Identification - Install equipment at a customer's site MarilynJ6354 Service Industry Specific Topics 6 29th July 2008 07:35 PM
Exhibition Equipment - What parts of 21CFR 820 apply to exhibition equipment? madannc Medical Devices (21 CFR part 820) 4 21st May 2008 06:46 PM
Introduce Continual Improvement in a Mining Equipment Service Company – HOW? lenard6027 Quality Tools, Improvement and Analysis 5 13th November 2007 11:57 PM
Storage analysis up to 18 months - Electronic equipment johnjbart Various Other Specifications, Standards, and related Requirements 3 9th December 2005 04:41 PM



The time now is 11:09 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts