The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Lean - Lean in Manufacturing and Services


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 17th March 2006, 11:35 AM
ScottBP's Avatar
ScottBP ScottBP is offline
Involved in Discussions

Registration Date: Feb 2005
Location: USA
 
Posts: 48
Thanks Given to Others: 0
Thanked 3 Times in 2 Posts
Karma Power: 21
Karma: 66
ScottBP has less than 100 Karma points so far.
I Say... Applying principles of lean to a calibration lab?

The competition among all the commercial calibration labs is turn-around time, and it seems that many principles of lean manufacturing could be applied to a calibration lab to speed up the turn-around time.

The question is, how would you go about applying the principles of lean to a calibration lab? I know most manufacturers have an in-house cal lab or at least an instrument and control (I&C) shop, so I'm pretty sure the Kaizen gurus hit up the cal lab or I&C shop at the same time they're evaluating the rest of the company.

But the lab managers of most 3rd party cal labs have never worked in the manufacturing industry, where lean production control skills are learned and ingrained. I've been told that calibration software is needed to take care of these tasks.

We are looking at utilizing Fluke MET/CAL to speed up our electrical calibrations, because it can automate a lot of electronic calibrations by controlling the calibrators via IEEE-4888 interfaces, and then collecting data from the instruments being tested via communications ports. (We are currently using a manual data collection system.) Automating calibrations makes it mistake-proof, and by automatically flagging typos, incorrect decimal places and out of tolerance readings, the number of QA mistakes are dramatically decreased. Besides that, being computerized, it whacks the paper shuffle off at the knees.

But MET/CAL is geared mainly towards electrical calibrations, and we are a multi-disciplined cal lab. You can't connect gage blocks, torque wrenches, glass thermometers or analog pressure gauges to a computer, so for these things, calibration data would still need to be entered manually. For that, there are numerous other softwares like Blue Mountain's Calibration Manager, IndySoft's Gage Insite, etc., which we are also looking at.

What other things could we look at "leaning out" at a cal lab? Should we start out with a process map that gets all down into the nitty-gritty of every step along the way from the time we receive a piece of equipment from a customer to the time it's back in their hands? Anybody else have experience with leaning out a cal lab?
Reply With Quote

Sponsored Links
  #2  
Old 17th March 2006, 11:52 AM
gard2372's Avatar
gard2372 gard2372 is offline
Sr. Quality Engineer

Registration Date: Jan 2005
Location: U.S. Philadelphia, PA
Age: 34
 
Posts: 214
Thanks Given to Others: 7
Thanked 27 Times in 19 Posts
Karma Power: 33
Karma: 488
gard2372 is appreciated, and has over 400 Karma points.gard2372 is appreciated, and has over 400 Karma points.gard2372 is appreciated, and has over 400 Karma points.gard2372 is appreciated, and has over 400 Karma points.gard2372 is appreciated, and has over 400 Karma points.
Default

I'm not sure of the capabilities, but have you tried SIMCO or GageTRax I'm not affiliated with them and I'm not sure if this even helps your situation.
__________________
"It costs a lot to build bad products"
Reply With Quote
Sponsored Links

  #3  
Old 17th March 2006, 12:27 PM
AndyN's Avatar
AndyN AndyN is offline
Forum Moderator

Registration Date: Feb 2005
Location: Michigan, USA
 
Posts: 3,880
Thanks Given to Others: 1,786
Thanked 1,259 Times in 902 Posts
Karma Power: 297
Karma: 10030
AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.
AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.
Let Me Help You Go Lean!

From my experience of Lean principles, and lab operations, there are many tools and techniques that can be applied in a laboratory which would speed the turn around time. Have you studied any of the tools of Lean, like 5 S, or spaghetti diagrams to evaluate 'travel' etc.?

Andy
__________________
'Cause you know sometimes words have two meanings.....
Reply With Quote
  #4  
Old 17th March 2006, 01:26 PM
sonflowerinwales's Avatar
sonflowerinwales sonflowerinwales is offline
In the country

Registration Date: Mar 2005
Location: South Wales, UK
Age: 48
 
Posts: 155
Thanks Given to Others: 31
Thanked 7 Times in 6 Posts
Karma Power: 30
Karma: 444
sonflowerinwales is appreciated, and has over 400 Karma points.sonflowerinwales is appreciated, and has over 400 Karma points.sonflowerinwales is appreciated, and has over 400 Karma points.sonflowerinwales is appreciated, and has over 400 Karma points.sonflowerinwales is appreciated, and has over 400 Karma points.
Default Leaning out labs

I came from a manufacturing background into a lab, and the most important thing I did was to motivate the staff. To say they were laid back would be an understatement! I then made sure boooking in, putting equipment in the lab was a easy, (thus quick) as possible. After cal, I encouraged enthusiasm in getting the product out the door. We were limited to a weekly run, so in on a Tuesday, deliver on a Tuesday. The thorn in my side was UKAS , they say in 17025 something like "no commercial pressure should be made", effectively blocking the "get your finger out" form of encouragement. We used specially written gauge control software, but data for all the kit was manually input.
Paul
__________________
Remember yesterday, plan for tomorrow, live for today..
Reply With Quote
  #5  
Old 17th March 2006, 01:27 PM
Steve Prevette's Avatar
Steve Prevette Steve Prevette is offline
Deming Disciple

Registration Date: Feb 2004
Location: Aiken, SC
 
Posts: 1,472
Thanks Given to Others: 60
Thanked 403 Times in 241 Posts
Karma Power: 190
Karma: 6872
Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.
Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by ScottBP

What other things could we look at "leaning out" at a cal lab? Should we start out with a process map that gets all down into the nitty-gritty of every step along the way from the time we receive a piece of equipment from a customer to the time it's back in their hands? Anybody else have experience with leaning out a cal lab?
Yes, I would strongly recommend laying out the process map with all that nitty-gritty. And in addition, collect cycle time data for each of those stages from actual operations and either queue times waiting for the next step or inventories waiting for the next step. Then you can apply Theory of Constraints to the data - work to expand the choke points - and get the cycle times down. My experience in doing this (before I knew what "lean" or even "theory of constraints" was) was at a US Navy torpedo maintenance facility.
__________________
Steve Prevette
"A Passionate Statistician", ASQ CQE, Fluor Government Group
The opinion stated above does not necessarily reflect that of my employer.
Reply With Quote
  #6  
Old 17th March 2006, 01:49 PM
Hershal's Avatar
Hershal Hershal is offline
Metrologist-Auditor

Registration Date: Mar 2004
Location: So Cal, California, U.S.
Age: 53
 
Posts: 1,621
Thanks Given to Others: 1
Thanked 310 Times in 224 Posts
Karma Power: 186
Karma: 6526
Hershal is appreciated, and has over 1700 Karma points.Hershal is appreciated, and has over 1700 Karma points.
Hershal is appreciated, and has over 1700 Karma points.Hershal is appreciated, and has over 1700 Karma points.Hershal is appreciated, and has over 1700 Karma points.Hershal is appreciated, and has over 1700 Karma points.Hershal is appreciated, and has over 1700 Karma points.Hershal is appreciated, and has over 1700 Karma points.
Default

Actually, some of the military is looking at 6S and lean at least for the engineering centers.....they have tons of statistical information so the transition should be a bit easier for them.....commercila labs will find the effort more challenging as the statistical information may not be as easily distilled unless you have a great track record of detailed uncertainty calculations, hence the efforts may take longer, but it is doable.

Hope this helps.

Hershal
Reply With Quote
  #7  
Old 17th March 2006, 02:05 PM
gard2372's Avatar
gard2372 gard2372 is offline
Sr. Quality Engineer

Registration Date: Jan 2005
Location: U.S. Philadelphia, PA
Age: 34
 
Posts: 214
Thanks Given to Others: 7
Thanked 27 Times in 19 Posts
Karma Power: 33
Karma: 488
gard2372 is appreciated, and has over 400 Karma points.gard2372 is appreciated, and has over 400 Karma points.gard2372 is appreciated, and has over 400 Karma points.gard2372 is appreciated, and has over 400 Karma points.gard2372 is appreciated, and has over 400 Karma points.
Default

Quote:
Originally Posted by sonflowerinwales

I came from a manufacturing background into a lab, and the most important thing I did was to motivate the staff. To say they were laid back would be an understatement! I then made sure boooking in, putting equipment in the lab was a easy, (thus quick) as possible. After cal, I encouraged enthusiasm in getting the product out the door. We were limited to a weekly run, so in on a Tuesday, deliver on a Tuesday. The thorn in my side was UKAS , they say in 17025 something like "no commercial pressure should be made", effectively blocking the "get your finger out" form of encouragement. We used specially written gauge control software, but data for all the kit was manually input.
Paul
I'm thinking the "no commercial pressure should be made" represents the effects of turnaround scheduling conflicting with the integrity of the calibration results. Kind of like the old adage one should not inspect something one has just worked on. Perhaps if you revised your QMS to state new turnaround processes for calibrations and allow an acceptable time period that would allow for "motivating" your highly skilled techs. Therefore the pressure will be coming from inhouse versus comercially.
__________________
"It costs a lot to build bad products"
Reply With Quote
  #8  
Old 17th March 2006, 05:39 PM
ScottBP's Avatar
ScottBP ScottBP is offline
Involved in Discussions

Registration Date: Feb 2005
Location: USA
 
Posts: 48
Thanks Given to Others: 0
Thanked 3 Times in 2 Posts
Karma Power: 21
Karma: 66
ScottBP has less than 100 Karma points so far.
Default

Thanks for the quick responses... I've been gathering info on 5S, Kaizen, etc. all along, and am in the process of coming up with some sort of game plan to get the ideas across to management, so we can "re-balance" (or re-organize) our cal lab. Of course, you can't rush a good calibration itself, but my line of thought is that if you take care of the little things, for instance knocking down the paper shuffle with a better automated system or making repair parts more readily accessible, then the work flow is smoother, and when work flow is smoother, there is less stress to put out work in the quoted turn-around time, and less stress means fewer mistakes, fewer mistakes means lower uncertainties, etc.


Memorable calibration quotes:
"Until a weight set is calibrated, it's just a box of metal."
"Without data, you're just a person with an opinion."
"Without traceable data, you're a person with a questionable opinion."
"In God we trust, all others bring data."
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Lean - Lean in Manufacturing and Services

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Applying Lean Tools in Product Development tahirawan11 Lean - Lean in Manufacturing and Services 2 24th August 2009 10:02 AM
Books on Implementing Lean Principles BoiseME Book, Video, Blog and Web Site Reviews and Recommendations 5 24th August 2007 10:37 AM
Applying the principles an practices of C/A - P/A? Corrective Action and children? Bobh@pte Nonconformance and Corrective Action 7 5th April 2007 04:20 PM
Lean in the Tool and Die Industry (Job Shop) - Applying Lean in "one-off" production imanewbie Lean - Lean in Manufacturing and Services 6 6th February 2006 01:04 AM
Dimensional Lab (CMM Room) vs. Physical Test/Calibration Lab - Same required temp/hum Ken K ISO 17025 - Calibration, Measurement Gages and Test Laboratories 2 25th October 2000 08:49 AM



The time now is 07:36 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts