The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Documentation Control Systems, Procedures, Forms and Templates


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 6th December 1999, 03:21 PM
Felix Cruz
Unregistered Guest

 
Posts: n/a
BIG Smile Customer Part Drawing

Our headquarter plant (Ogden, Utah) do all the business deal with
customer and then we, the plant in Tijuana, becomes the supplier for that
product. Does QS 9000 call some place for the plant supplier to have the
customer drawing where the product is produced? Or it should be enough that
the headquarter plant keeps it?
Reply With Quote

Sponsored Links
  #2  
Old 6th December 1999, 03:46 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,859
Thanks Given to Others: 1,895
Thanked 1,568 Times in 1,020 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11569
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Yin Yang

There is no requirement for customer drawings to be kept in a certain place - your company decides where it wants to keep them.

The question that might come up would probably, if any, be in regard to Readily Available. Are documents needed to do a job 'readily available'? Readily Available also depends upon your interpretation to some degree. In assembly, Company A with low turnover and good training may have few working documents at the work station while Company B with high turnover and minimal training may require a lot of documentation at a station. Complexity of the operation can be a consideration. On the other hand, some documents can be 'readily available' if you are in Oregon and the document is in Ohio - where the document can be FAXed or otherwise 'communicated' (Say assembly is in Oregon and purchasing is handled from the Ohio facility. On some occasions Oregon needs a copy of the PO. When that happens it is 'readily available' by FAX). There are differences in the types of documentation in these examples, however the point is you have to take a good look at your definition of 'readily available'.
Reply With Quote
Sponsored Links

Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Documentation Control Systems, Procedures, Forms and Templates

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Configuration Management for sub-contractors working to Customer Drawings wayne.wilson7 AS9100 Aerospace Standard and Requirements 7 26th May 2009 08:08 AM
Requirement to control gauge and tooling drawings? TS16949 Clause 7.5.1.5 AnnieZ ISO/TS 16949 - International Automotive Quality Systems Standard 5 21st February 2007 06:36 PM
Document control basics - Two different drawings with the same part # and rev number just67horns Documentation Control Systems, Procedures, Forms and Templates 12 27th December 2005 05:19 PM
No drawings, no measurements from Customer - How can we do PPAP? Geishy APQP and PPAP 23 11th August 2004 03:52 AM
Are Critical Dimensions on Drawings an ISO 9000 Requirement? marrtee Documentation Control Systems, Procedures, Forms and Templates 9 2nd April 2004 05:01 PM



The time now is 02:11 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts