The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Lean - Lean in Manufacturing and Services


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 10th April 2006, 10:44 PM
johnnybegood johnnybegood is offline
Involved - Posts

Registration Date: Jun 2001
 
Posts: 125
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 37
Karma: 47
johnnybegood has less than 100 Karma points so far.
Question Inspecting one at a time is quicker?

I am introducing lean concept and pull system to the production line. On the production floor I observed Inspectors would pick up 5 or 10 pieces and lining them up on the table and inspecting them all at once. According to them it is faster. Beside that they claim that by lining 5 pieces, the 'odd' one can be easily identified. How can I convince them that inspecting one at a time is quicker and took less work than inspecting in batch?
Reply With Quote

Sponsored Links
  #2  
Old 10th April 2006, 11:13 PM
Tim Folkerts's Avatar
Tim Folkerts Tim Folkerts is offline
Forum Moderator

Registration Date: Sep 2003
Location: Kansas, USA
Age: 46
 
Posts: 900
Thanks Given to Others: 27
Thanked 249 Times in 150 Posts
Karma Power: 123
Karma: 3974
Tim Folkerts is appreciated, and has over 1700 Karma points.
Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.
Default How about a trial?

How about a trial to compare the two approaches? If you have evidence, it makes your arguments much more powerful.

Have a few inspectors try each method and measure how long it takes. While you are at it, check the effectiveness of the two approaches. Include a few bad parts to see if they are better at catching them if they inspect in batches or individually.

Without knowing any more, I think it is quite possible that the inspectors are correct. It is often easier to spot a bad item when it is compared to a good item, and it is often quicker to do a process several times in a row rather than one at a time.


Of course, any test that involves judgement has the possibility of being biased. If the inspectors THINK (or hope) they are more effective when they check several at once, it is quite possible that they will actually BE more effective because they try harder.

Tim F
__________________
To wonder is to begin to understand.
Reply With Quote
Sponsored Links

  #3  
Old 11th April 2006, 12:46 AM
johnnybegood johnnybegood is offline
Involved - Posts

Registration Date: Jun 2001
 
Posts: 125
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 37
Karma: 47
johnnybegood has less than 100 Karma points so far.
Default

I read on an article on Lean...according to Taiichi Ohno that inspecting one at a time is quicker and took less work than inspecting in batch. Taiichi Ohno is one of the gurus in TPS. I am very sure he has all the prove.
Reply With Quote
  #4  
Old 11th April 2006, 02:40 AM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

Registration Date: Sep 2003
Location: Illinois
 
Posts: 7,536
Thanks Given to Others: 182
Thanked 1,127 Times in 762 Posts
Karma Power: 397
Karma: 11090
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Default

I presume from the wording of the original post we are talking of a visual "attribute" inspection versus an instrument or gage based "characteristic" inspection.

If so, the inspectors are looking for anomalies. Usually, such a process provides a "gold standard" for comparison. Perhaps the inspectors ARE correct in being able to spot anomalies faster among a group versus one-at-a-time against the gold standard.

I would favor an "experiment" to confirm either hypothesis (one versus many), but I would wonder about removing conscious or unconscious bias from the test.
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
Reply With Quote
  #5  
Old 11th April 2006, 02:44 AM
Claes Gefvenberg's Avatar
Claes Gefvenberg Claes Gefvenberg is offline
Forum Administrator

Registration Date: May 2000
Location: Eskilstuna, Sweden
Age: 49
 
Posts: 3,771
Thanks Given to Others: 246
Thanked 244 Times in 172 Posts
Blog Entries: 13
Karma Power: 213
Karma: 4951
Claes Gefvenberg is appreciated, and has over 1700 Karma points.
Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.
Lightbulb

Quote:
Originally Posted by johnnybegood

I am introducing lean concept and pull system to the production line.
That sounds interesting. Will you provide us with information about the progress as you go along? I for one would love to hear the tale.
Quote:
Originally Posted by johnnybegood

On the production floor I observed Inspectors would pick up 5 or 10 pieces and lining them up on the table and inspecting them all at once. According to them it is faster.
For all I know they could be right, but there are other aspects. For instance:

If you inspect the parts one by one, you will probably find a defect sooner and be able to correct it at once, as opposed to producing those four or nine extra parts, possibly with the same defect.

Besides, if we are talking about lean: Could you let the operators do the inspection?

/Claes
__________________
Hanlon's Razor.
Never attribute to malice that which can be adequately explained by stupidity.
User Groups: Elsmar Cove Cycling Enthusiasts Formula 1 fanatics Photo freaks Readers Corner
Reply With Quote
  #6  
Old 11th April 2006, 04:18 PM
Bev D's Avatar
Bev D Bev D is offline
Heretical Statistician

Registration Date: Jan 2003
Location: New England
 
Posts: 1,134
Thanks Given to Others: 265
Thanked 516 Times in 340 Posts
Karma Power: 137
Karma: 4352
Bev D is appreciated, and has over 1700 Karma points.
Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.
Default

So it all depends on the actual situation.
For certain types of characteristics that are visually apparent, the soldier method IS faster in detecting the odd man out than inspecting each pice individually. However, there are many characteristics that must be measured individually and so I've typically used solder inspection as only ONE of the inspections that are performed. (and this is typically with higher volume production AND it's a FINAL inspection, not in process)

using poke yoke inspection devices that 'test' each device as it's made (single piece flow is faster and more effective overall and can and should be done in process - real time feedback and limitation of defective product created)

each approach is viable, but which one is best depends on the situation
Reply With Quote
  #7  
Old 11th April 2006, 05:23 PM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

Registration Date: Sep 2003
Location: Illinois
 
Posts: 7,536
Thanks Given to Others: 182
Thanked 1,127 Times in 762 Posts
Karma Power: 397
Karma: 11090
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Default

Depending on how the product is made (by automated process or hand work), most lean enthusiasts would consider these solutions (ALL BY OPERATOR WHO MADE PIECE):
  • automated process - pick 5 in a row every 100 pieces (or any other number which makes sense) and chart critical characteristics to determine process is in control.
  • hand work - worker checks EACH piece upon completion against a "gold standard" to assure it meets requirements BEFORE going back to make next piece.
No one of my acquaintances would consider independent 3rd party inspections as part of a "lean" operation because of the lag time between production and inspection and lack of serialization (i.e. "When" did process go awry?)
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Lean - Lean in Manufacturing and Services

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Inspecting subcontracted manufacturing of garments, wearing apparel KN Quality Manufacturing and Related Processes 5 27th August 2009 11:33 AM
Usage Log - Calculating Time Difference in Excel - Start time and end time statman78 Excel .xls Spreadsheet Templates and Tools 18 13th January 2009 10:18 AM
DNV Standards for inspecting offshore containers and baskets dsjoe Various Other Specifications, Standards, and related Requirements 5 3rd June 2008 11:18 AM
Inspecting Quality into Product - How to react? Yeong Inspection and Test, Sampling and Related Topics 22 5th October 2006 10:03 AM
Proper use of the Blueing process when inspecting the taper of bushings Nick Phillips ISO 17025 - Calibration, Measurement Gages and Test Laboratories 6 26th July 2004 09:56 PM



The time now is 01:58 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts