The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 30th March 2001, 11:37 PM
Michael36
Unregistered Guest

 
Posts: n/a
Please Help! Dimension Inspection - Results recorded on print - Seeking a better method

My company uses the actual fabrication print to record actual measured results next to the nominal dimensions. Problems occur when, mid-job, changes to drawings (ECRs) arrive that do not impact the recorded dimensions. New, updated drawings replace those that have dimensions already recorded. When this happens, either the dimensions have to be transferred to the new prints or the old version of the print is left with the job "for dimensional recording only, not for fabrication." You can see, either way is not very nice, and can beg for trouble.

Does anyone have a suggested format for a seperate dimension record form that the dimensions would be documented on, rather that the print itself?

Thanks.
Reply With Quote

Sponsored Links
  #2  
Old 31st March 2001, 10:58 AM
Al Dyer
Unregistered Guest

 
Posts: n/a
Question

Quote:
Originally posted by Michael36:
My company uses the actual fabrication print to record actual measured results next to the nominal dimensions. Problems occur when, mid-job, changes to drawings (ECRs) arrive that do not impact the recorded dimensions. New, updated drawings replace those that have dimensions already recorded. When this happens, either the dimensions have to be transferred to the new prints or the old version of the print is left with the job "for dimensional recording only, not for fabrication." You can see, either way is not very nice, and can beg for trouble...... Thanks.
When you say fabrication print are you refering to the actual controlled print that the product was approved to, or are you refering to some type of secondary print generated to use specifically as a tool to record measurement results?

Do you store the completed fabrication print as evidence that the process was monitored?

How can you have an engineering change during a process run that would facilitate a new print to be generated?

I guess I am looking for some more information about your process. In my experience the original print that was used during process approval is a controlled document and must go through a formal change process. I guess the "normal" process I've seen is to have an inspection sheet that was derived from master print tolerances. Also, I have never heard of a major engineering change (one that requires a new print) not going through a formal approval process, escpecially during a production run.

I'd like to hear more about your process, I get the feeling I'm not getting an extensive enough picture to give an educated response.

Thanks,

ASD...
Reply With Quote
Sponsored Links

Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Conversion Help!! Print with this dimension .2917+/-.0005 :1 CMfgT Inspection and Test, Sampling and Related Topics 9 24th April 2009 08:49 AM
Blueprint Notation Question - Print dimension like 4.312 g +.002 -.001 Tiger Woods Quality Management Related Issues 10 16th April 2009 11:05 AM
What is Constrains k (dimension subject to law provision) - Characteristic on print? filcavalli Various Other Specifications, Standards, and related Requirements 1 22nd June 2006 08:52 AM
Inspection Results - The FDA's interpretation of recording inspection results Microbe Inspection and Test, Sampling and Related Topics 2 14th July 2005 06:44 PM
PPAP submission level classification - One dimension on print is changed BrakeMan APQP and PPAP 16 28th February 2001 12:27 AM



The time now is 06:20 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts