The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Quality Tools, Improvement and Analysis > Quality Assurance and Compliance Software Tools / Solutions > Excel .xls Spreadsheet Templates and Tools


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 1 votes, 4.00 average. Display Modes
  #1  
Old 16th June 2006, 02:42 PM
Aitch Aitch is offline
Registered Visitor

Registration Date: Jun 2006
Location: NW AR
 
Posts: 11
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 14
Karma: 25
Aitch has less than 100 Karma points so far.
Please Help! Excel formula for Ppk needed

Hello, new here and looking for a ppk formula for Excel.
I've searched and found a wealth of information but fail to find or understand how to formulate the ppk calculation in Excel.
I'll attempt to attach my spread sheet which calculates cpk.
Thank you.
Attached Files: 1. Scan for viruses before using, 2. Please report any 'bad' files by Reporting the post it is in, 3. Use at your Own Risk.
File Type: xls Ppk study OCD.xls (43.0 KB, 582 views)
Reply With Quote
Thanks to Aitch for your informative Post and/or Attachment!

Sponsored Links
  #2  
Old 16th June 2006, 02:52 PM
Jim Wynne's Avatar
Jim Wynne Jim Wynne is online now
Courtesy Access

Registration Date: Jan 2005
Location: Southeast Wisconsin
Age: 57
 
Posts: 9,210
Thanks Given to Others: 755
Thanked 2,290 Times in 1,544 Posts
Karma Power: 611
Karma: 20365
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Default Re: Excel formula for ppk needed

Welcome to the Cove!

I didn't audit the spreadsheet, but it appears that you need to use STDEV instead of STDEVP in row 81. BTW, appearances are that you should have been using that from the start, because the data don't appear to be subgrouped.
__________________
Some men are born mediocre, some men achieve mediocrity, and some men have mediocrity thrust upon them.-- Joseph Heller
Reply With Quote
Sponsored Links

  #3  
Old 16th June 2006, 03:09 PM
Aitch Aitch is offline
Registered Visitor

Registration Date: Jun 2006
Location: NW AR
 
Posts: 11
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 14
Karma: 25
Aitch has less than 100 Karma points so far.
Default Re: Excel formula for ppk needed

Quote:
Originally Posted by Jim Wynne

Welcome to the Cove!

I didn't audit the spreadsheet, but it appears that you need to use STDEV instead of STDEVP in row 81. BTW, appearances are that you should have been using that from the start, because the data don't appear to be subgrouped.

I am using STDEV to calculate Cpk. I just added line 81 STDEVP when I started trying to formulate ppk and got hung up. The dates represent different manufacturing events.
Reply With Quote
  #4  
Old 16th June 2006, 03:28 PM
Jim Wynne's Avatar
Jim Wynne Jim Wynne is online now
Courtesy Access

Registration Date: Jan 2005
Location: Southeast Wisconsin
Age: 57
 
Posts: 9,210
Thanks Given to Others: 755
Thanked 2,290 Times in 1,544 Posts
Karma Power: 611
Karma: 20365
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Default Re: Excel formula for ppk needed

Quote:
Originally Posted by Aitch

I am using STDEV to calculate cpk. I just added line 81 STDEVP when I started trying to formulate ppk and got hung up. The dates represent different manufacturing events.
You need to use STDEVP to calculate Cpk and STDEV to calculate Ppk. Have a look at this thread What is the Formula for Cpk in Excel? for a related discussion.
__________________
Some men are born mediocre, some men achieve mediocrity, and some men have mediocrity thrust upon them.-- Joseph Heller
Reply With Quote
  #5  
Old 16th June 2006, 04:54 PM
Aitch Aitch is offline
Registered Visitor

Registration Date: Jun 2006
Location: NW AR
 
Posts: 11
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 14
Karma: 25
Aitch has less than 100 Karma points so far.
Default Re: Excel formula for ppk needed

I thought I had read just the opposite elsewhere on this thread, but of course I see in the suggested reading that this is not the case.

So what am I getting when I think I am calculating CPK using my formula?

I have spent quite a bit of time searching for a excel formula for ppk and while I find the question asked and lots of discussion, I do not find an example of the ppk formula for excel anywhere.

We are a contract manufacturer and we specialize in short runs. A 250 piece run is big. I know this has it's own set of problems.

Thank you for your time and patience.
Reply With Quote
  #6  
Old 16th June 2006, 05:21 PM
jrubio's Avatar
jrubio jrubio is offline
Javier Rubio

Registration Date: Jun 2005
Location: Europe Spain. Cadiz
 
Posts: 549
Thanks Given to Others: 2
Thanked 111 Times in 30 Posts
Karma Power: 74
Karma: 2309
jrubio is appreciated, and has over 1700 Karma points.jrubio is appreciated, and has over 1700 Karma points.jrubio is appreciated, and has over 1700 Karma points.jrubio is appreciated, and has over 1700 Karma points.jrubio is appreciated, and has over 1700 Karma points.jrubio is appreciated, and has over 1700 Karma points.jrubio is appreciated, and has over 1700 Karma points.jrubio is appreciated, and has over 1700 Karma points.jrubio is appreciated, and has over 1700 Karma points.jrubio is appreciated, and has over 1700 Karma points.jrubio is appreciated, and has over 1700 Karma points.jrubio is appreciated, and has over 1700 Karma points.jrubio is appreciated, and has over 1700 Karma points.
Send a message via MSN to jrubio
Default Re: Excel formula for Ppk needed

In my opinion a Capability Study needs mandatory the histogram in order to ensure that the distribution of points fix with the Normal (Gauss distribution) whether not the cpk or cp are not well defined.

In Delphi was mandatory to receive the capability stadies from suppliers alwasy with the histogram.
__________________
Best Regards from Cádiz Spain (Europe).
-----
Javier Rubio Barragán.
Higher Industrial Engineer and Safety Master
Reply With Quote
  #7  
Old 16th June 2006, 08:15 PM
Tim Folkerts's Avatar
Tim Folkerts Tim Folkerts is offline
Forum Moderator

Registration Date: Sep 2003
Location: Kansas, USA
Age: 46
 
Posts: 900
Thanks Given to Others: 27
Thanked 249 Times in 150 Posts
Karma Power: 123
Karma: 3974
Tim Folkerts is appreciated, and has over 1700 Karma points.
Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.
Default Re: Excel formula for Ppk needed

DISCLAIMER: This is just my opinion of the way things should be based on my knowledge of statistics, not based on any "official" document or interpretation.

I don't think that the deciding factor for STDEV (sample standard deviation) vs STDEVP (population standard deviation) is Cpk vs Ppk, or subgroups vs individuals. It is (as the name implies) an issue of samples vs entire populations.


"The" standard deviation to characterize a group is STDEVP.

If you draw a sample from a group and calculate STDEVP, you tend to get an answer that is smaller than the STDEVP of the entire group. To fix this, a "fudge factor" is added -- you divide by a slightly smaller number ( (n-1)^0.5 instead of n^0.5 ) which makes the answer bigger by an appropriate amount.

STDEV for a subgroup does a good job of estimating the true STDEVP of the entire group.



If you make 30 parts and use all 30 for a Ppk study, then STDEVP would be appropriate.
If you make 3000 parts and use just 30 for a Ppk study, then STDEV would be appropriate.

IF you make 4 parts at a time and use all 4 as a subgroup, then STDEVP would be appropriate.
IF you make 400 parts at a time and use just 4 as a subgroup, then STDEV would be appropriate.


Practically speaking, it doesn't make a lot of difference, espicially for Ppk. If you have 100 parts in the study, then you will be off by 0.5% if you use the "wrong" standard deviation. Ppk = 1.99 vs Ppk = 2.00 -- big deal.

For Cpk, the difference would be more because the size of the group is smaller -- typically 3-6 in a subgroup. Even here, it ould only be 5-15% difference.


Tim F
__________________
To wonder is to begin to understand.
Reply With Quote
  #8  
Old 17th June 2006, 12:13 PM
Jim Wynne's Avatar
Jim Wynne Jim Wynne is online now
Courtesy Access

Registration Date: Jan 2005
Location: Southeast Wisconsin
Age: 57
 
Posts: 9,210
Thanks Given to Others: 755
Thanked 2,290 Times in 1,544 Posts
Karma Power: 611
Karma: 20365
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Default Re: Excel formula for Ppk needed

Quote:
Originally Posted by Tim Folkerts

DISCLAIMER: This is just my opinion of the way things should be based on my knowledge of statistics, not based on any "official" document or interpretation.


I think it's too bad when a person knowledgeable in statistics has to start a sensible explanation with a disclaimer. The sad fact is that there's a lot about the automotive treatment of statistical analysis that doesn't make any sense, and people do have to be concious of the fact that the way they've been taught to do things doesn't necessarily make sense outside the world of automotive manufacturing.

Quote:
Originally Posted by Tim Folkerts

Practically speaking, it doesn't make a lot of difference, espicially for Ppk. If you have 100 parts in the study, then you will be off by 0.5% if you use the "wrong" standard deviation. Ppk = 1.99 vs Ppk = 2.00 -- big deal.
Very true, although it might make a difference to an anal retentive B3 SQE (or whatever they call them these days) who understands the letter of the SPC manual but is oblivious to its intent. Ppk is, for the most part, a useless statistic, intended, I think, to provide an "out" for instances when the process isn't in statistical control. In point of fact, Cpk isn't a whole lot more useful except as a method of quick comparison; you don't have to be a weatherman to know which way the wind is blowing.
__________________
Some men are born mediocre, some men achieve mediocrity, and some men have mediocrity thrust upon them.-- Joseph Heller
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Quality Tools, Improvement and Analysis > Quality Assurance and Compliance Software Tools / Solutions > Excel .xls Spreadsheet Templates and Tools

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
What is the Formula for Cpk in Excel? lee01 Excel .xls Spreadsheet Templates and Tools 38 19th August 2009 12:44 PM
What is the formula I need to calculate Pp and Ppk? akiton Capability, Accuracy and Stability - Process, Machine, etc. 26 27th March 2009 09:15 AM
Need some help with a formula in Excel Please! Darren Durney Excel .xls Spreadsheet Templates and Tools 11 27th March 2009 07:33 AM
Excel Formula for Ebay shop fees - Help needed Manix Excel .xls Spreadsheet Templates and Tools 8 1st November 2006 11:54 AM
Ppk formula - Can some one please help me - I have attached the sheet. amna77 Capability, Accuracy and Stability - Process, Machine, etc. 9 15th March 2006 01:21 AM



The time now is 08:22 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts