The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Lean - Lean in Manufacturing and Services


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 21st June 2006, 12:42 AM
asutherland's Avatar
asutherland asutherland is offline
E-Mails Invalid or Rejected

Registration Date: Aug 2005
Location: Georgia, USA
 
Posts: 125
Thanks Given to Others: 0
Thanked 5 Times in 5 Posts
Karma Power: 0
Karma: 343
asutherland is appreciated, and has over 300 Karma points.asutherland is appreciated, and has over 300 Karma points.asutherland is appreciated, and has over 300 Karma points.asutherland is appreciated, and has over 300 Karma points.
Please Help! Establish a New Quality System based on Lean - Starting A Late Career in Quality

Not sure if this is in the catatory of TGR or should generate a new topic.

Statement: I am getting ready to accept a position in quality.

Environment: Quality systems do not exits.
(what the he11 does that mean). It means that this is a multi-$MM corporation that does not have a SQA program, or an internal quality data collection system, and a poor end of product inspection program. No Control Plan, Manufacturing Standards, QCPC documents exist.

My background: I have been doing lean for 18 yrs., am familiar with the basic 7 tools of quality, the 7 advanced tools (only used some), PDCA system experience, TOPS certification, numerious CPI tool, numerous problem solving certifications as well as the semi-popular "Problem solving approach by "Hositoni" and some MINI-tab (basic charts, MSA's, DOE's.

Argument: Why am I considering a late career in quality? (The company has a need, I have a desire.

Question>>>>> In regards to another thread or in this as TGR . . . Getting down to bare basic's . . where should I begin.

In my mind, as limited as it is . . I am thinking . . . lets start with process control. . . lets define the process (even if engineering doesnt have time to do this) and develop a Q.C. Process Chart. Then, by the control characteristics, develop the monitoring system. . . . (why this instead of a control plan first . . .because in my mind, the control plan has no real or immediate value verses going directly to QCPC from the PC.

Yes this opens up to a lot of speculatios and questions of why am I considering this, but I would like to avoid these types of questions and focus on " what to start first" by using examples of TGR.

(Bottom line . . . I am being asked to use lean as a process for establishment of a new quality system that supports the mentality of "build um fast first, we can always fix um later").

as
Reply With Quote

Sponsored Links
  #2  
Old 21st June 2006, 01:03 AM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,859
Thanks Given to Others: 1,895
Thanked 1,568 Times in 1,020 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11569
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Default

Quote:
Originally Posted by asutherland

Question>>>>> In regards to another thread or in this as TGR . . . Getting down to bare basic's . . where should I begin.
Do you have any type of evaluation, such as a gap analysis, of what currently does exist? There almost HAS to be some existing quality system elements.

You can't make a plan (which includes 'where to start') unless you know the situation in so far as what exists, including what does and doesn't work.
__________________
A Search is a terrible thing to waste!
One Test is Worth 1000 Expert Opinions - The plural of anecdote is not data.
We can't solve problems by using the same kind of thinking we used when we created them. - Unknown
Reply With Quote
Sponsored Links

  #3  
Old 21st June 2006, 02:09 AM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

Registration Date: Sep 2003
Location: Illinois
 
Posts: 7,537
Thanks Given to Others: 182
Thanked 1,127 Times in 762 Posts
Karma Power: 397
Karma: 11090
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Default

from a practical standpoint:
Do you have a high ranking champion who will support the processes or changes you suggest if you can make a good case for implementation?

Just for laughs, take the time to read through my thread
Wes Bucey offers service as Strategy Advisor - Seeking Case Studies for Book
especially where I lay out "musts and should haves"
Quote:
Here are some "should have" criteria for the target organizations:
  • I deal with chief executive and/or Board of Directors directly and interact with any or all staff as necessary
  • organization should be in self-perceived "crisis" due to pressure from time, regulators, or customers
  • I don't do work by myself, but will "mentor and advise" existing staff to do it so they can continue when I am gone (for example, I don't "perform" Gap Analysis by myself, but will help personnel learn how to do it themselves, keyed to the organization's circumstances, and will review and suggest modifications as required)
  • There is no minimum term for the assignment - some issues could be resolved in as little as one or two days, but still be important to the organization and pertinent for my book.
  • the maximum term might be as long as a year, but would involve my full time presence for only a fraction of the time to help personnel learn to do a task, returning from time to time for evaluation and suggestions for improvement
  • organization may be any size, from small business to transnational giant.
Some of the perceived "crisis" situations might be, but are not limited to:
  • seeking registration to a Standard due to outside pressure
  • "re-engineering" an organization which needs major Kaizen events to become competitive in its market
  • "assimilating" a recent takeover of an organization with a different culture
  • "fairness opinions" when selling an organization or creating an Employee Stock Ownership Plan (ESOP) or Initial Public Offering (IPO)
  • Complying with Sarbannes-Oxley Act for public corporations
  • new product introduction (production and marketing)
  • achieving government certification in a regulated industry
  • negotiating with aggressive customers
  • negotiating with banks, financiers, equity investors
  • adopting and assimilating new technologies (such as Electronic Document Management or Customer Relationship Management)
My criteria as an adviser rather than employee will be different than yours, but you should at least have a handle on what they currently perceive as their problem and compare that to what problems you uncover as you familiarize yourself with the operation. Sometimes you will be stunned to discover they knew what they needed. Most times, they will have a bunch of blind spots due to taboos and just plain ignorance of best practices.

The key to a successful change management is to help the bosses and the troops become dissatisfied with the status quo and show them benefits to change.

The sticky point will be that most of the troops will interpret "Lean" as "Reduction in Force." Worse they will interpret a RIF as meaning more work with no benefit for the survivors of a RIF. You have to demonstrate how life will be better for the survivors, or the only survivors may be ones you don't want because the good folks will hit the highway BEFORE they can be RIFFED.

We'll be interested in how it goes. Don't hesitate to ask specific questions as you go. Why try to reinvent the wheel if you can come to the Cove and borrow one?
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
Reply With Quote
  #4  
Old 21st June 2006, 11:23 PM
asutherland's Avatar
asutherland asutherland is offline
E-Mails Invalid or Rejected

Registration Date: Aug 2005
Location: Georgia, USA
 
Posts: 125
Thanks Given to Others: 0
Thanked 5 Times in 5 Posts
Karma Power: 0
Karma: 343
asutherland is appreciated, and has over 300 Karma points.asutherland is appreciated, and has over 300 Karma points.asutherland is appreciated, and has over 300 Karma points.asutherland is appreciated, and has over 300 Karma points.
Default Re: Establish a New Quality System based on Lean - Starting A Late Career in Quality

1. High Ranking Champion
2. Gap analysis
3. Wes Advisor.com
4. other

1. High Ranking Champion. I will be working directly for the Corporate Director of Quality. I would say yes . . . a good champion.

2. Gap analysis . . . . it really upsets me when my nose gets in front of my face. I hate when I cant see past it. (What do we say we are supposed to be doing VS. What are really doing). Excellent . . Thank you.

3. Wes . . . I always enjoy reading your stuff. Your very down to earth with out having to analyze a spot on a nats hair on wart on a toe. Do I always agree . . . no, but I always consider.

4. Other . . I was going to add comments about environment... ie. volume first,fix it later . . bla, bla , bla, however in light of your incite, I agree.
Find out what you should be doing first before fixing the rest of the world in your own image.
Reply With Quote
  #5  
Old 22nd June 2006, 01:23 AM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

Registration Date: Sep 2003
Location: Illinois
 
Posts: 7,537
Thanks Given to Others: 182
Thanked 1,127 Times in 762 Posts
Karma Power: 397
Karma: 11090
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Default Re: Establish a New Quality System based on Lean - Starting A Late Career in Quality

Quote:
Originally Posted by asutherland

1. High Ranking Champion
2. Gap analysis
3. Wes Advisor.com
4. other

1. High Ranking Champion. I will be working directly for the Corporate Director of Quality. I would say yes . . . a good champion.

2. Gap analysis . . . . it really upsets me when my nose gets in front of my face. I hate when I cant see past it. (What do we say we are supposed to be doing VS. What are really doing). Excellent . . Thank you.

3. Wes . . . I always enjoy reading your stuff. Your very down to earth with out having to analyze a spot on a nats hair on wart on a toe. Do I always agree . . . no, but I always consider.

4. Other . . I was going to add comments about environment... ie. volume first,fix it later . . bla, bla , bla, however in light of your incite, I agree.
Find out what you should be doing first before fixing the rest of the world in your own image.
Actually the two highlighted words make almost more sense the way you wrote and spelled them than the "accepted" spelling versions.

Compare "nats" [Washington Nationals? a team with no "hair!!"] with gnats
Compare "incite" with insight (I hope I incite you all to some insight )

Thanks for the vote of confidence. Good luck in the new assignment!
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
Reply With Quote
  #6  
Old 25th July 2006, 10:29 AM
Coury Ferguson's Avatar
Coury Ferguson Coury Ferguson is offline
Moderator here to help

Registration Date: Jan 2006
Location: SoCal
Age: 51
 
Posts: 3,839
Thanks Given to Others: 657
Thanked 460 Times in 395 Posts
Karma Power: 191
Karma: 4966
Coury Ferguson is appreciated, and has over 1700 Karma points.
Coury Ferguson is appreciated, and has over 1700 Karma points.Coury Ferguson is appreciated, and has over 1700 Karma points.Coury Ferguson is appreciated, and has over 1700 Karma points.Coury Ferguson is appreciated, and has over 1700 Karma points.Coury Ferguson is appreciated, and has over 1700 Karma points.Coury Ferguson is appreciated, and has over 1700 Karma points.Coury Ferguson is appreciated, and has over 1700 Karma points.Coury Ferguson is appreciated, and has over 1700 Karma points.Coury Ferguson is appreciated, and has over 1700 Karma points.Coury Ferguson is appreciated, and has over 1700 Karma points.Coury Ferguson is appreciated, and has over 1700 Karma points.Coury Ferguson is appreciated, and has over 1700 Karma points.
Send a message via Skype™ to Coury Ferguson
Default Re: Establish a New Quality System based on Lean - Starting A Late Career in Quality

Quote:
Originally Posted by asutherland

Not sure if this is in the catatory of TGR or should generate a new topic.

Statement: I am getting ready to accept a position in quality.

Environment: Quality systems do not exits.
(what the he11 does that mean). It means that this is a multi-$MM corporation that does not have a SQA program, or an internal quality data collection system, and a poor end of product inspection program. No Control Plan, Manufacturing Standards, QCPC documents exist.

I guess maybe I am a little ignorant, but if there is already a Director that you report to, how can there be a lack of a Quality System?

BTW: Did you succeed in your endeavors?
__________________
"The one thing I want to leave my children is an honorable name." "It is hard to fail, but it is worse never to have tried to succeed." Theodore Roosevelt Chicago, IL, April 10, 1899
Reply With Quote
  #7  
Old 25th July 2006, 02:57 PM
asutherland's Avatar
asutherland asutherland is offline
E-Mails Invalid or Rejected

Registration Date: Aug 2005
Location: Georgia, USA
 
Posts: 125
Thanks Given to Others: 0
Thanked 5 Times in 5 Posts
Karma Power: 0
Karma: 343
asutherland is appreciated, and has over 300 Karma points.asutherland is appreciated, and has over 300 Karma points.asutherland is appreciated, and has over 300 Karma points.asutherland is appreciated, and has over 300 Karma points.
Default Re: Establish a New Quality System based on Lean - Starting A Late Career in Quality

You make the assumption that because there is a quality director, that there must be a quality system.

In fact, I spent my first week with this facility two weeks ago, and began implementation of a tick chart program..... In two weeks, I almost have productions ok to start recording defects on this chart.

I will be with them for two more weeks and then I am moving on.

Got a great job offer in KY for Lean Champion. After over 1 yr with this company and over $4MM in savings (bottom line savings) and still no job offer, I put my name on the net 3 wks ago, and got a new offer to start in 3 weeks.
Cant wait.
Reply With Quote
  #8  
Old 25th July 2006, 03:07 PM
Coury Ferguson's Avatar
Coury Ferguson Coury Ferguson is offline
Moderator here to help

Registration Date: Jan 2006
Location: SoCal
Age: 51
 
Posts: 3,839
Thanks Given to Others: 657
Thanked 460 Times in 395 Posts
Karma Power: 191
Karma: 4966
Coury Ferguson is appreciated, and has over 1700 Karma points.
Coury Ferguson is appreciated, and has over 1700 Karma points.Coury Ferguson is appreciated, and has over 1700 Karma points.Coury Ferguson is appreciated, and has over 1700 Karma points.Coury Ferguson is appreciated, and has over 1700 Karma points.Coury Ferguson is appreciated, and has over 1700 Karma points.Coury Ferguson is appreciated, and has over 1700 Karma points.Coury Ferguson is appreciated, and has over 1700 Karma points.Coury Ferguson is appreciated, and has over 1700 Karma points.Coury Ferguson is appreciated, and has over 1700 Karma points.Coury Ferguson is appreciated, and has over 1700 Karma points.Coury Ferguson is appreciated, and has over 1700 Karma points.Coury Ferguson is appreciated, and has over 1700 Karma points.
Send a message via Skype™ to Coury Ferguson
Default Re: Establish a New Quality System based on Lean - Starting A Late Career in Quality

Quote:
Originally Posted by asutherland

You make the assumption that because there is a quality director, that there must be a quality system.

In fact, I spent my first week with this facility two weeks ago, and began implementation of a tick chart program..... In two weeks, I almost have productions ok to start recording defects on this chart.

I will be with them for two more weeks and then I am moving on.

Got a great job offer in KY for Lean Champion. After over 1 yr with this company and over $4MM in savings (bottom line savings) and still no job offer, I put my name on the net 3 wks ago, and got a new offer to start in 3 weeks.
Cant wait.
Maybe you are right in saying that I could have made an assumption forgive me

Congrats on your new position and I wish you all the success.
__________________
"The one thing I want to leave my children is an honorable name." "It is hard to fail, but it is worse never to have tried to succeed." Theodore Roosevelt Chicago, IL, April 10, 1899
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Lean - Lean in Manufacturing and Services

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Starting a new Quality System blane ISO 9001 - Quality Management Systems Standard 17 18th December 2008 01:23 PM
How to Establish Quality Policy Based on Vision of Organization zerodefect ISO 9001 - Quality Management Systems Standard 19 7th December 2007 01:02 AM
Quality System Implementation Starting from the Beginning rajandraj ISO 9001 - Quality Management Systems Standard 20 15th September 2007 10:35 PM
Career Change Question - Why did you choose Quality Engineer as starting job? Cognizant Occupation Discussions 3 20th January 2006 06:31 PM
20 Factors based QMS to TS 16949 Process based Quality Management System Link Xue ISO/TS 16949 - International Automotive Quality Systems Standard 1 10th March 2004 03:57 AM



The time now is 08:25 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts