The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Lean - Lean in Manufacturing and Services


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 24th July 2006, 11:19 AM
duecesevenOS duecesevenOS is offline
Registered Visitor

Registration Date: Jul 2006
Location: Missouri
 
Posts: 76
Thanks Given to Others: 6
Thanked 11 Times in 9 Posts
Karma Power: 17
Karma: 105
duecesevenOS is appreciated, and has over 100 Karma points.duecesevenOS is appreciated, and has over 100 Karma points.
Please Help! Standardized Work in High Speed Process - 350 Parts per Minute

I am an engineer for a manufacturing process that is in it's infancy of lean implementation. We are currently working on work standardization (among other things). In one particular process we have 24 machines set up in 4 banks of machines (6 presses per bank) and each press produces parts at 350 parts/min. So our cycle time is under 2 seconds. This is great but for any given part produced the standardized work could be split up into the single step of 1) watch the press.

This is obviously not the operators primary duty.

Most examples of standardized work center around all the steps from the beginning of one part to the beginning of the next and that doesn't really work for us. We have standardized a larger unit for the kanbans supplying from each bank of machines but the work done in order to make each unit is very rarely consistent. The primary responsibilities of the operators are to keep the brass rolls supplied, gage components for SPC, remove and replace bad tooling, and cleaning (5S).

I'm just wondering if anyone has any experience standardizing a process like this. I'd appreciate any input.
Reply With Quote

Sponsored Links
  #2  
Old 25th July 2006, 08:06 AM
wmarhel wmarhel is offline
Courtesy Access

Registration Date: Oct 2004
Location: DuBois, PA
Age: 39
 
Posts: 612
Thanks Given to Others: 109
Thanked 234 Times in 149 Posts
Karma Power: 94
Karma: 3086
wmarhel is appreciated, and has over 1700 Karma points.
wmarhel is appreciated, and has over 1700 Karma points.
Default Re: Standardized Work in High Speed Process - 350 Parts per Minute

Quote:
Originally Posted by duecesevenOS


Most examples of standardized work center around all the steps from the beginning of one part to the beginning of the next and that doesn't really work for us.
Don't get wrapped up with what other people are doing. If they don't have the same process as you, of course their "standardized work" would be different.

Quote:
Originally Posted by duecesevenOS

We have standardized a larger unit for the kanbans supplying from each bank of machines but the work done in order to make each unit is very rarely consistent. The primary responsibilities of the operators are to keep the brass rolls supplied, gage components for SPC, remove and replace bad tooling, and cleaning (5S).
You've answered some of your own questions as far as tasks that must be performed. You could also take a look at standardizing the set-up of the machines/equipment if that hasn't been done already. Include the method to supply material to the machine.

Other components of the work instructions could include the sequence in which the machines are started for specific jobs. Maybe it's as simple as machine 1 - 2 - 3 -4, but for another product it could be 2 - 3 - 1 - 4.

How about basic maintenance activities that can be performed by the operator such as ensuring the oil reservoirs are at an acceptable level.

If you want a few good references, check out:

The New Standardization and Standard Work for the Shopfloor

Wayne
Reply With Quote
Sponsored Links

  #3  
Old 25th July 2006, 03:45 PM
asutherland's Avatar
asutherland asutherland is offline
E-Mails Invalid or Rejected

Registration Date: Aug 2005
Location: Georgia, USA
 
Posts: 125
Thanks Given to Others: 0
Thanked 5 Times in 5 Posts
Karma Power: 0
Karma: 343
asutherland is appreciated, and has over 300 Karma points.asutherland is appreciated, and has over 300 Karma points.asutherland is appreciated, and has over 300 Karma points.asutherland is appreciated, and has over 300 Karma points.
Default Re: Standardized Work in High Speed Process - 350 Parts per Minute

I suspect that each machine runs more than one part.

If this is the case, then you need to include your change overtime into your takt-time. (Number of change-overs/day X change over time).

It may also help to separate your cyclic time from your non-cyclic. (those items that can be done in a cyclical maner, set up machine, run part, measure part, clean from last set-up, set-up visuals for next run, etc, from those that are not done in a cyclical, checking oil levels, pressure levels, adding oils, etc.

In this way you can establish a sequence of steps that must always be followed (standardized work), as well as those things that should be done periodically. This will help you to calculate the total amount of manpower required based on the number of machines in each cell.

Hope this helps
Reply With Quote
  #4  
Old 10th August 2006, 04:04 PM
rwdmike rwdmike is offline
Inactive Registered Visitor

Registration Date: Aug 2006
Location: US/Troy
 
Posts: 3
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 14
Karma: 10
rwdmike has less than 100 Karma points so far.
Default Re: Standardized Work in High Speed Process - 350 Parts per Minute

I would suggest you set-up those operators on a Kamishibia route. Where they are doing quality checks and load parts on the various presses on a route, vs tied to one piece. Then you can develop the Standard work around these activities.
Reply With Quote
  #5  
Old 10th August 2006, 04:47 PM
duecesevenOS duecesevenOS is offline
Registered Visitor

Registration Date: Jul 2006
Location: Missouri
 
Posts: 76
Thanks Given to Others: 6
Thanked 11 Times in 9 Posts
Karma Power: 17
Karma: 105
duecesevenOS is appreciated, and has over 100 Karma points.duecesevenOS is appreciated, and has over 100 Karma points.
Default Re: Standardized Work in High Speed Process - 350 Parts per Minute

Whoa....Kamishibia? Whole new Japanese word I've never heard of (I think I'll be fluent in a year or two ). Please explain a little better if possible. I'll look it up though. Thanks for the suggestion.
Reply With Quote
  #6  
Old 10th August 2006, 04:55 PM
duecesevenOS duecesevenOS is offline
Registered Visitor

Registration Date: Jul 2006
Location: Missouri
 
Posts: 76
Thanks Given to Others: 6
Thanked 11 Times in 9 Posts
Karma Power: 17
Karma: 105
duecesevenOS is appreciated, and has over 100 Karma points.duecesevenOS is appreciated, and has over 100 Karma points.
Default Re: Standardized Work in High Speed Process - 350 Parts per Minute

Looks like it's "kamishibai"... If anyone else is looking this up.

Kamishibia is some sort of story....Little confused for a sec there.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Lean - Lean in Manufacturing and Services

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
French Train Breaks Speed Record of 350 miles per hour Marc General News and Business Articles 4 4th April 2007 12:09 PM
Just AS9100 Approved - High Speed Spin Testing company 93ramvert AS9100 Aerospace Standard and Requirements 4 19th December 2006 09:06 AM
GPS Gum Balls - High Speed Police Chases Cari Spears General News and Business Articles 4 8th February 2006 03:38 PM
Motion Analysis with High Speed Camera Marc Manufacturing and Related Processes 3 26th July 2002 06:42 PM



The time now is 06:13 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts