The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Lean - Lean in Manufacturing and Services


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 10th August 2006, 07:25 AM
Yeong Yeong is offline
Inactive Registered Visitor

Registration Date: Jul 2005
Location: Singapore
 
Posts: 7
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 18
Karma: 10
Yeong has less than 100 Karma points so far.
Please Help! Calculating Utilization % and On Time Delivery

I need some good explanation on the 2 followings meaning & its way of calculation. Will appreciate someone can attach an excel file example.
In one of my factory tour, they explain the 2 KPI which I quite abit confused.
Due to tour time factor, I was unable to ask them how they go about it.
Hope someone can share with me. In the presentation, they mentioned the way they track OTD & Utilization is by calculating :-

1) On Time Delivery :-
a) Actual shipment vs First Committed Date (This is to measure Mfg)
b) First Committed Date vs Requested Date (This is to measure Marketing)

2) Machine Utilization
a) Based on available hours
b) Based on Installed hours

Can anyone share how this is being done & its meaning.
Thanks
Reply With Quote

Sponsored Links
  #2  
Old 10th August 2006, 10:30 AM
wmarhel wmarhel is offline
Courtesy Access

Registration Date: Oct 2004
Location: DuBois, PA
Age: 39
 
Posts: 612
Thanks Given to Others: 109
Thanked 234 Times in 149 Posts
Karma Power: 94
Karma: 3086
wmarhel is appreciated, and has over 1700 Karma points.
wmarhel is appreciated, and has over 1700 Karma points.
Default Re: Calculating Utilization % and On Time Delivery

Quote:
Originally Posted by Yeong


1) On Time Delivery :-
a) Actual shipment vs First Committed Date (This is to measure Mfg)
b) First Committed Date vs Requested Date (This is to measure Marketing)

2) Machine Utilization
a) Based on available hours
b) Based on Installed hours
First, Machine utilization the way you wrote would be a horrible metric IMHO. It would instill bad behaviors which would be detrimental in the long term (over-production, running the machine instead of making the necessary fix, etc.)

You would also want to include some measurement of the performance of the machine as well: quality of parts, the run rate, etc. My advise would be to look at measuring OEE. Do a search on this forum as I know there are postings addressing this very topic.

For the operations overall: # of orders shipped on time / total # of orders

I wouldn't break anything down as manufacturing can only produce if they have parts, and sales/marketing "SHOULD" understand the capabilities of their company or the company they are representing.

If you want two metrics:
1) measure your on-time-delivery against "your" promise date
2) measure your on-time-delivery against the "customer's" requested date


One thing to keep in mind is that while your numbers could show an on-time-delivery rate of 100%, your customers number could be much lower. Part of the reason for this could be that your customer allows for two days early and zero days late. If the product arrives on the customer's dock before the allowed two days, you are likely to be penalized. It brings a level of complexity to the party, but customer satisfaction is what keeps the orders coming.

Also, I wouldn't allow a re-negotiated due date because I couldn't make the original due date to be used as an "on-time-delivery".

Wayne
Reply With Quote
Sponsored Links

  #3  
Old 10th August 2006, 03:07 PM
preetham's Avatar
preetham preetham is offline
Involved - Posts

Registration Date: Feb 2006
Location: india,karnataka,bangalore
Age: 29
 
Posts: 54
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 18
Karma: 83
preetham has less than 100 Karma points so far.
Default Re: Calculating Utilization % and On Time Delivery

Quote:
Originally Posted by Yeong

I need some good explanation on the 2 followings meaning & its way of calculation. Will appreciate someone can attach an excel file example.
In one of my factory tour, they explain the 2 KPI which I quite abit confused.
Due to tour time factor, I was unable to ask them how they go about it.
Hope someone can share with me. In the presentation, they mentioned the way they track OTD & Utilization is by calculating :-

1) On Time Delivery :-
a) Actual shipment vs First Committed Date (This is to measure Mfg)
b) First Committed Date vs Requested Date (This is to measure Marketing)

2) Machine Utilization
a) Based on available hours
b) Based on Installed hours

Can anyone share how this is being done & its meaning.
Thanks

To find the utilization of man & machine thre is one term called the OEE(overall equipment efficiency).

1)calculate the % of total available machine time & the utilization time of that machine for perticular period. let it be A

2)Calculate the total % of availble time of man power for that machine & The Idle time .consider this as B

3) calculate the % of total product produced v/s the rejection from that machine at the defined period let it be C

then the OEE of that equipment is

OEE=%(A*B*C)
__________________
Preetham S V
Reply With Quote
  #4  
Old 10th August 2006, 03:58 PM
rwdmike rwdmike is offline
Inactive Registered Visitor

Registration Date: Aug 2006
Location: US/Troy
 
Posts: 3
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 14
Karma: 10
rwdmike has less than 100 Karma points so far.
Default Re: Calculating Utilization % and On Time Delivery

OEE is a good metric for understanding the area condition.
The formula for calculating OEE is:
Actual number of good pieces produced/ divided by ideal number of pieces produced in net operating time.

Or

OEE= AvailabilityXPerformance EfficiencyXQuality
Reply With Quote
  #5  
Old 10th August 2006, 06:12 PM
asutherland's Avatar
asutherland asutherland is offline
E-Mails Invalid or Rejected

Registration Date: Aug 2005
Location: Georgia, USA
 
Posts: 125
Thanks Given to Others: 0
Thanked 5 Times in 5 Posts
Karma Power: 0
Karma: 343
asutherland is appreciated, and has over 300 Karma points.asutherland is appreciated, and has over 300 Karma points.asutherland is appreciated, and has over 300 Karma points.asutherland is appreciated, and has over 300 Karma points.
Default Re: Calculating Utilization % and On Time Delivery

If we're going to talk about OEE . . . might as well do it all.
Attached Files: 1. Scan for viruses before using, 2. Please report any 'bad' files by Reporting the post it is in, 3. Use at your Own Risk.
File Type: xls OEE.xls (23.5 KB, 481 views)
Reply With Quote
Thanks to asutherland for your informative Post and/or Attachment!
  #6  
Old 10th August 2006, 10:30 PM
Yeong Yeong is offline
Inactive Registered Visitor

Registration Date: Jul 2005
Location: Singapore
 
Posts: 7
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 18
Karma: 10
Yeong has less than 100 Karma points so far.
Default Re: Calculating Utilization % and On Time Delivery

Hi all

Thanks for all the valuable answers - it certainly open my awareness.
But I am still a bit of confused about the On time Delivery calculation.
As I mentioned in my original mail from my customer visit, it is accurate to have 2 type of metrics to calculate the OTD i.e
a) Actual shipment vs first committed date (to measure Mfg performane)
b) First committed date vs requested date (to measure marketing measurement)

Is this what most Company use to measure OTD ?
I hope someone can highlight more in-dept feedback

Thanks alot
Reply With Quote
  #7  
Old 11th August 2006, 06:07 AM
pldey42's Avatar
pldey42 pldey42 is offline
Patrick L Dey

Registration Date: Jun 2006
Location: London, England
 
Posts: 103
Thanks Given to Others: 1
Thanked 29 Times in 20 Posts
Karma Power: 22
Karma: 320
pldey42 is appreciated, and has over 300 Karma points.pldey42 is appreciated, and has over 300 Karma points.pldey42 is appreciated, and has over 300 Karma points.pldey42 is appreciated, and has over 300 Karma points.
Default Re: Calculating Utilization % and On Time Delivery

Quote:
Originally Posted by Yeong

Hi all

Thanks for all the valuable answers - it certainly open my awareness.
But I am still a bit of confused about the On time Delivery calculation.
As I mentioned in my original mail from my customer visit, it is accurate to have 2 type of metrics to calculate the OTD i.e
a) Actual shipment vs first committed date (to measure Mfg performane)
b) First committed date vs requested date (to measure marketing measurement)

Is this what most Company use to measure OTD ?
I hope someone can highlight more in-dept feedback

Thanks alot
I think the best measure of on-time delivery compares the date the customer accepts the product with the request date, and this is the measure that the telecom industry is standardising upon using TL 9000.

It's not ship date, but acceptance date, because shipping is usually part of the supplier's service. Customers don't care when it shipped, they want it to arrive on time. Also, they want it to work and not, for example, be broken during shipping. So date of customer acceptance (either by incoming test or inspection) measures the true customer experience.

The measures you propose have several problems:

1. If marketing are measured by the difference between commit and request dates, they're motivated to commit dates that are the same as the request dates, regardless of manufacturing's true capabilities. That's no use to customers, who want the commit date to be realistic even if it's not what they requested.

2. If manufacturing are measured by commit dates, nothing motivates them to achieve request dates. Indeed, to make their measurements look good they will argue for the longest possible commit dates, regardless of what customers are requesting.

3. If ship date is measured, there's no motivation to use a reliable shipper that delivers product on time and does not damage it in transit.

4. By fragmenting the measure amongst marketing and manufacturing nobody in the company is responsible for achieving customer request dates; marketing and manufacturing are set up as adverseries each trying to optimise their own performance at the expense of the other.

Thus, the company needs to measure itself by comparing date of delivery of product that works to the customer's premises, with the customer's request date.

Breaking this measure into departmental targets is not easy. People will do what it takes to make their measurements look good, and departmental targets can make departments work against each other instead of together, in alignment towards the customer. Their targets need to be in terms of the things they can control (e.g. marketing cannot control commit date).

Perhaps, marketing's measure should be in terms of the percentage of available manufacturing capacity sold, and manufacturing's should be the percentage of sold goods delivered on time and working. They should be measured together on the difference between commit and request dates in order to drive that difference down.

Hope this helps,
Patrick
__________________
"We haven't got the money, so we've got to think." - Rutherford
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Lean - Lean in Manufacturing and Services

Bookmarks

Tags
availability, on time delivery, performance efficiency, quality, utilization %, overall equipment efficiency (oee)


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Usage Log - Calculating Time Difference in Excel - Start time and end time statman78 Excel .xls Spreadsheet Templates and Tools 18 13th January 2009 10:18 AM
Tracking Delivery Performance - A "Quality Objective" is "On Time Delivery" Ian_Large_UK Supplier Quality Assurance and other Supplier Issues 13 7th February 2008 09:54 AM
What is an Acceptable On-time Delivery Percentage? mshell ISO 9001 - Quality Management Systems Standard 8 26th January 2004 09:36 AM
100% On-Time Delivery Steven Truchon QS-9000 - American Automotive Manufacturers Standard 1 11th September 2000 04:55 PM
On-Time delivery Dawn QS-9000 - American Automotive Manufacturers Standard 5 20th May 1999 04:44 PM



The time now is 05:23 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts