|
|
 |
|

7th October 1998, 08:52 PM
|
|
E-Mails Invalid or Rejected
Registration Date: Sep 1998
Location: St. Marys, PA
|
|
Posts: 302
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0 Karma: 40 
|
|
Gage R & R - Do we specifically have to do Gage R&R on every gauge?
Do we specifically have to do Gage R & R on every gauge to be in compliance with QS? Is it customer control plan driven? Everyone I talk to tells me a different story. Why doesn't QS specify instead of playing games?
Is this standard something anyone wants to play games with?
|

7th October 1998, 11:35 PM
|
 |
Your Elsmar Cove Host
Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
|
|
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Karma Power: 605
|
|
Rule of thumb is if it's on the control plan, you have to evaluate it. R&R is only one way but is what most folks use.
|

8th October 1998, 11:41 AM
|
|
|
Actually QS does specify, that all measurement systems in the control plan must be evaluated using the MSA or an equivalent evaluation system.
|

8th October 1998, 12:45 PM
|
 |
Your Elsmar Cove Host
Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
|
|
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Karma Power: 605
|
|
Christian and I are saying the same thing. I used the 'rule of thumb' statement because you may find other instruments you want to do an analysis on but as a minimum you must address those on the control plan.
|

14th November 2004, 08:23 PM
|
|
E-Mails Invalid or Rejected
Registration Date: Oct 2004
Location: Canada
|
|
Posts: 58
Thanks Given to Others: 0
Thanked 3 Times in 3 Posts
Karma Power: 0 Karma: 24 
|
|
If you are OK with process capability then Gage R & R doesnot matter
Think of it from the first principle why we do gage R & R before evaluating process capability.
Gage R & R will only reduce the process capability compared to ideal state. Therefore when capability is low, you need to know whether low capability is a result of process common cause or poor measurement system!
If you donot know exact answer, you may end up in spending money on process whereas you should have spending on measurement system.
However, if your process is robust and if you have a proof of satisfactory performance from customer point of view, you donot need to do gage R & R just for the sake of it.
It is good idea to use engineering judgement rather than checking the box approach.
Arvind
|

15th November 2004, 03:37 PM
|
 |
An Early Cover
Registration Date: Jul 2003
|
|
Posts: 897
Thanks Given to Others: 193
Thanked 175 Times in 130 Posts
Karma Power: 104 Karma: 3066 

|
|
Quote:
|
Originally Posted by Dawn
Do we specifically have to do Gage R & R on every gauge to be in compliance with QS? Is it customer control plan driven? Everyone I talk to tells me a different story. Why doesn't QS specify instead of playing games?
|
The standard is pretty clear. I call this Snakes & Ladders.
See how quickly it creates several hundred pages of reading in 3 books?
Measurement System Analysis - 4.11.4
....This requirement shall apply to measurement systems referenced in the customer approved Control Plan (see 4.2.3.7). The analytical methods and acceptance criteria used should conform to those in the Measurement Systems Analysis reference manual [e.g. bias, linearity, stability, repeatability and reproducibility studies).....
The Control Plan - 4.2.3.7
Refer to the Production Part Approval Process manual.
PPAP Manual v3 page 8 para I.2.2.10 MSA Studies see also MSA manual
It is understood that each "type" of gage mentioned on the CP is to be studied.
We do not do MSA on every Go No Go plug gage (thousands and thousands). We just do by type.
This has survived 3 different registrars and PPAP submissions are clearly indicated as "type".
Good luck, nothing is a frustrating as trying to "lawyer" the 600 plus pages of QS 9000.
|

17th November 2004, 11:19 AM
|
|
Involved - Posts
Registration Date: Jul 2003
Location: England
|
|
Posts: 67
Thanks Given to Others: 8
Thanked 3 Times in 3 Posts
Karma Power: 30 Karma: 180  
|
|
Playing the game or common sense
Of course don't forget MSA 3 Pg 23 which notes "common sense is the guide in any case" - always assuming your common sense is the same as the auditor/customer!!!!
In my opinion It does not say use GR&R in all cases, it says use the appropriate MSA technique for the situation. This could be as little as calibration trend analysis, to the full box of MSA toys.
I have found to date (famous last words), by specifing the MSA considered to be appropriate during APQP, and I use an extra column on my version of the Control Plan to record this, none yet have questioned me too deep to raise a NCR.
Big problem is rewriting historic Plans just to show this as I've only got nine years to retirement.
Martin in the sunny UK
|

21st November 2004, 03:55 AM
|
|
Inactive Registered Visitor
Registration Date: Nov 2004
Location: Singapore
Age: 34
|
|
Posts: 18
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 21 Karma: 10 
|
|
MSA just for equipments for calibration in PPAP?
as Arvind said, MSA is just for defects analysis but not mistake-proofed.
in PPAP cl.I.2.2.10, for all equipment used for new or modified gages, , do you think so??
another question, R&R is facilitated, but bias, linearity, stability studies are all difficult to get. These are also required? no, my point of view. Are agreed upon?
|
Lower Navigation Bar
|
|
|
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|