The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > SPC Monitoring and Statistical Analysis Techniques


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 27th March 1999, 10:46 PM
chen
Unregistered Guest

 
Posts: n/a
Default Using SPC charts for Verification of Job Setups

"job setups shall be verified whenever a setup is performed(e.g.initial run of a job,material changeover,job change,significant time periods lapsed between runs,etc.)" - from QS9K 4.9.4 P37

"setup verification
a recommended method is to produce enough product to constitute a subgroup of the size used for spc.the parts are measured and the results are entered on the control chart.if these results fall within the central third of the control limit zone,the setup can be approved for production.if the results fall in the outer two thirds,a second subgroup should be manufactured,measured,and plotted.if this point falls in the same outer two thirds,the setup should be adjusted and this sequence repeated.if the point falls in the central third,the setup can be approved for production."
- from QS9K GLOSSARY P132

I want to use the method to verify the job setup of our press production.
but there have some questions:
1.control limit zone: USL-LSL or UCL-LCL ?
2.results: all datas of subgroup or Xbar ?
they used "results" and "point",so i do not know the meaning of these words.

pls tell me if you have any information about job setup verification.

have a nice day. Mar.,28/1999
Reply With Quote

Sponsored Links
  #2  
Old 30th March 1999, 01:25 AM
Batman
Unregistered Guest

 
Posts: n/a
Default

Hi Chen!

We have used almost this exact definition for several years. Where appropriate, when a job is setup, the set up person takes a normal sample for the SPC chart and plots it. If the Xbar and sigma or range is in control, the set-up person initials that plotted point and the set-up is "verified." This only applies to set-ups that have run n the past, in control.

Yes, they are talking about the UCL and LCL. Quickly, your Xbar control limits are +/- 3 sigma from the central line. Imagine dividing the area between the UCL and LCL into thirds, three zones. The middle third is the +/- one sigma zone. If your first plotted group is within this middle zone, the process is allowed to go on. If the plotted point is in the next zone towards teh UCL or LCL, the requirement is to take another sample and plot that one. If that sample is in the second zone, an adjustment is required. If the first sample plotted is in the outer zone, that is near the UCL or LCL, an immediate adjustment must be made, and start again.

The range is normally assumed to be (or remain) in control from the last run. In general (note, in general), if the range chart is out of control, this is a machine or tooling problem, one that normal 'post-setup' adjustments cannot fix.

This is of course one "recommended" method, using an SPC chart. There are certainly other methods, and they may work for you.
Reply With Quote
Sponsored Links

  #3  
Old 30th March 1999, 07:41 AM
chen
Unregistered Guest

 
Posts: n/a
Default

Hi batman:

Thanks for your information!

I also have some questions:
1)do you use Xbar and r chart for job setups
at the same time and verify the job setups
by using all the results from Xbar&R chart?
2)this is the first time we use this method
to verify the job setups.so i use the spec
limit(usl-lsl) zone as the control limit
zone.how do you think so? if you have any
good ideas for this case pls tell me.

thanks a lot/have a nice day. Mar.,31/99
Reply With Quote
  #4  
Old 18th April 1999, 03:51 PM
Batman
Unregistered Guest

 
Posts: n/a
Default

Hi chen!
Sorry for the delay, I did not realize you had further questions.

If you are going to use the SPC chart for job set-up verification, take the last chart used and plot the values from the samples from the set-up. This plotted point should be "in control" according to the rules stated above. If it isn't, adjustments should be made towards moving "in control" and another plot made. The SPC chart will already have upper and lower control limits set. You do not use any sort of "specification" chart here.

Also, this is for product that has been run before. New product - first run stuff - needs data collected first before establishing control limits. "Set-up verification" does not apply here. New part data has to be recorded first, then control limits calculated.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > SPC Monitoring and Statistical Analysis Techniques

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Why people not following SPC charts regularly S.Karthik Training - Internal, External and Distance Learning 10 25th August 2008 12:35 PM
Reaction to Out of Control SPC Charts beaser3 SPC Monitoring and Statistical Analysis Techniques 14 2nd November 2007 10:06 AM
SPC in job shop? CNC machine producing a max of 50 pieces per job pradeepm SPC Monitoring and Statistical Analysis Techniques 4 4th November 2005 10:52 AM
Control charts for attributes: is this possible on a non automated job? Myriam SPC Monitoring and Statistical Analysis Techniques 5 12th September 2005 08:35 AM
SPC charts - Sample Size discussion Reggie SPC Monitoring and Statistical Analysis Techniques 19 19th July 2005 01:36 PM



The time now is 03:43 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts