The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics > AQL - Acceptable Quality Level


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 21st September 2006, 06:42 PM
qualitytrec's Avatar
qualitytrec qualitytrec is offline
Father of 8!!

Registration Date: Jan 2003
Location: Salt Lake City, Utah
Age: 38
 
Posts: 369
Thanks Given to Others: 26
Thanked 27 Times in 20 Posts
Karma Power: 44
Karma: 464
qualitytrec is appreciated, and has over 400 Karma points.qualitytrec is appreciated, and has over 400 Karma points.qualitytrec is appreciated, and has over 400 Karma points.qualitytrec is appreciated, and has over 400 Karma points.qualitytrec is appreciated, and has over 400 Karma points.
Please Help! AQL - Can progressive acceptance be used with longer/bigger lots?

Hey all,
AQL is a fairly new concept for me that is used in my industry. Is it possible to have segmented or progressive acceptance for lot acceptance? In other words can I release part of a lot before before the whole lot has been run and inspected?
Our work orders generally run about 100,000+ parts and we can run about 15,000-30,000 parts per day per machine. We run 7 machines and I have one quality coordinator on the floor per shift. To break the runs into smaller "lots" ups my inspection quantities to an unmanageble quantity and it is highly unlikely that I will get more manpower alotted to my department. But product ships as truckloads are completed, if released by quality. Defects are not generally sporadic in our processes once they begin they continue until corrected. they for the most part (except for contamination on the product) contained to one or two pallets and if the product is looked at according to schedule and criteria should be caught in a single pallet(1200-15000 parts). If when a defect is found the product is sorted and the defects removed back to the origin and at the same time the process is corrected so more defects are not being produced cna the product be released as we go?
I do not like AQL it is hard for me to get my mind around the idea that certain defects are acceptable if kept under a certain number. I am still trying to figure it out. I wonder if there is a "AQL for dummies" book.
__________________
If at first you don't succeed, don't try sky diving.
Reply With Quote

Sponsored Links
  #2  
Old 21st September 2006, 10:17 PM
Jim Wynne's Avatar
Jim Wynne Jim Wynne is offline
Courtesy Access

Registration Date: Jan 2005
Location: Southeast Wisconsin
Age: 57
 
Posts: 9,204
Thanks Given to Others: 755
Thanked 2,290 Times in 1,544 Posts
Karma Power: 611
Karma: 20365
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Default Re: AQL- Can progessive acceptance be used with longer/bigger lots?

"AQL" is something of an outmoded concept, and is generally misunderstood anyway. The popular notion is that it precluded rejecting anything so long as there were fewer than x defectives in a sample. What it actually means is that a lot may be rejected and returned to its source if there are x or more defects in the sample, but will not be returned if there are fewer. The receiving entity still has the right to reject bad parts, however. It usually boiled down to who had to do the sorting. Today, the idea of shipping a customer a lot known to include defectives is verboten.

You may treat any homogeneous quantity as a "lot" for sampling purposes. Avail yourself of a statistically sound sampling plan, do random sampling, and off you go.
__________________
Some men are born mediocre, some men achieve mediocrity, and some men have mediocrity thrust upon them.-- Joseph Heller
Reply With Quote
Sponsored Links

  #3  
Old 25th September 2006, 12:13 PM
qualitytrec's Avatar
qualitytrec qualitytrec is offline
Father of 8!!

Registration Date: Jan 2003
Location: Salt Lake City, Utah
Age: 38
 
Posts: 369
Thanks Given to Others: 26
Thanked 27 Times in 20 Posts
Karma Power: 44
Karma: 464
qualitytrec is appreciated, and has over 400 Karma points.qualitytrec is appreciated, and has over 400 Karma points.qualitytrec is appreciated, and has over 400 Karma points.qualitytrec is appreciated, and has over 400 Karma points.qualitytrec is appreciated, and has over 400 Karma points.
Default Re: AQL- Can progessive acceptance be used with longer/bigger lots?

From what I can see the industry I am in is way behind say automotive. AQL is still "the way it is done". I am not a statistics genius in any sense of the word. I am in quality because I am resourceful and have a fair amount of common sense and learn fairly quickly. With my limited knowledge of statistics I am not sure how to convince my company nor my customers for the need of more "modern" quality criteria, especially when the depth of understanding for our processes is so seemingly shallow. In order to run statistical sampling on our product I need an in control process, this I know. I also know that we are not even sure what in our process contributes significantly to control, we are still trying to find the control points. The product shows no evidence of control at this time.
Is there anybody with extrusion blow molding experience that can help with this.
And until then is there an answer to my original questions? I know some of them show my lack of understanding for AQL. I need clarity.
__________________
If at first you don't succeed, don't try sky diving.
Reply With Quote
  #4  
Old 25th September 2006, 02:02 PM
Bev D's Avatar
Bev D Bev D is offline
Heretical Statistician

Registration Date: Jan 2003
Location: New England
 
Posts: 1,134
Thanks Given to Others: 265
Thanked 516 Times in 340 Posts
Karma Power: 137
Karma: 4352
Bev D is appreciated, and has over 1700 Karma points.
Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.
Default Re: AQL- Can progessive acceptance be used with longer/bigger lots?

It will help if you can tell us what AQL plan you are using now or alternately, what defect rate you want to protect against.

A simple answer to your question was given by Jim - but allow me to elaborate on it with a few more specifics. Consider each portion of the grand lot you want to release as a "sub-lot". perform a full AQL sample size on that grand lot - randomly - and you can reelase that sublot of materials. Of course all of that sub lot must be present and available for inspection for the sample to 'cover' the sublot. each sublot of material is an 'inspection lot' for purposes of your AQL plan.

YOU define the inspection lot, so it is quite acceptable to have multiple inspection lots wihtin a grand lot or large batch or large setup. In fact, it woudl be to your advantage to break up the inspection inot smaller subsets to get quicker feedback product quality...

There is no great mystery about AQL sampling plans. basically, you pick the "acceptabe Quality level" that you are willing to ship to your Customer. Say .1% defective is OK, but no lot should have more than .1% defective. Then once you know the lot size you pick the sample size for the lot based on general inspection levels (there are tightened and loosened levels but they are really just confusing at this point and many people don't use them. You also need to determine if you will reject the lot on 1 defect or not. Generally accepted practice is to reject on 1 defect. This really only makes people feel better - it doesn't improve the quality level in shipped lots. The important thing to understand is the AQL level. The AQL level means that you will accept 95% of the lots that have that level defective in them...it's exactly the opposite of what many people think the AQL level means. (hence the name 'acceptable' quality level.)

As I've written many times in the forums, I never use AQL plans anymore. They are too complicated. I simply use the Binomial or Poisson to selct my sample size depending on how much confidence I want in detecting a defect level. Which is what most people think the AQL plan is doing. It also lets me easily change my confidence level, instead of being stuck with just 95%.

For example using the Binomial, if I want to detect a .1% defect rate 95% of the time I would have to sample n= 2995. (2996 for the Poisson). If I choose and AQL of .1% and I guess at a lot size of 35,000-150,000 then my sample size is 500. but with that sample size I will REJECT a lot that is .1% defective only ~40% of the time!

Also picking the sample size by lot size is not statistically necessary. it only adds to the confusion.
Reply With Quote
  #5  
Old 26th September 2006, 12:23 AM
keithm696's Avatar
keithm696 keithm696 is offline
$ Contributor

Registration Date: Oct 2003
Location: US Missouri
Age: 54
 
Posts: 24
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 25
Karma: 10
keithm696 has less than 100 Karma points so far.
Send a message via ICQ to keithm696 Send a message via MSN to keithm696 Send a message via Yahoo to keithm696
Default Re: AQL- Can progessive acceptance be used with longer/bigger lots?

Hi All,
To throw something else out here for discussion. We are a nonprofit that provides work to handicapped persons to improve/increase their skills on all levels. We have a customer that manufactures bullets that we have been asked to do a gross defect inspection of their product. I have been asked to develop a sampling plan to eliminate the requirement for 100% visual inspection after the intitial sort for defects. My question is this. If I run 6 stations with a variable output of 1,000 to 3,000 bullets per shift, on a lot of 160,000 bullet, would ANSI 1.4 be a good place to start for a sampling plan?
Thanks for all the great inputs and knowledge on this forum.
Regards,
Keith
Reply With Quote
  #6  
Old 26th September 2006, 02:26 AM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,852
Thanks Given to Others: 1,892
Thanked 1,563 Times in 1,016 Posts
Blog Entries: 4
Karma Power: 604
Karma: 11544
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Default Re: AQL - Can progessive acceptance be used with longer/bigger lots?

Also see these related existing discussion threads related to AQL - Acceptable Quality Level: AQL - Acceptable Quality Level
__________________
A Search is a terrible thing to waste!
One Test is Worth 1000 Expert Opinions - The plural of anecdote is not data.
We can't solve problems by using the same kind of thinking we used when we created them. - Unknown
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics > AQL - Acceptable Quality Level

Bookmarks

Tags
acceptable quality level, aql, aql level, incoming inspection, lot acceptance, receiving inspection


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
AQL - How to calculate aql and aql level moonlight AQL - Acceptable Quality Level 3 6th November 2009 09:50 PM
Acceptable Quality Levels (AQL) - What is the usage of AQL 100 to 1000? WLN AQL - Acceptable Quality Level 10 18th July 2008 07:58 PM
Traceablity of Small Part Lots Supplied to Production taken from Large Lots? ignatiuswong Lean - Lean in Manufacturing and Services 7 14th March 2008 12:45 AM
Final Inspection lot failures - AQL based final acceptance quest Nonconformance and Corrective Action 3 26th March 2007 03:11 AM
Reject Rates - Lots and split lots RudyB Quality Tools, Improvement and Analysis 3 8th September 2005 12:40 PM



The time now is 10:21 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts