The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > SPC Monitoring and Statistical Analysis Techniques


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 1st October 1999, 12:59 PM
Ritasalive
Unregistered Guest

 
Posts: n/a
Please Help! Process control - Finished product vs. Tooling

Hello,
We are trying to implement process control on our production line and we have a lot of different view of what we should do.
First, brief introduction of the company; We are a rubber molded and/or extruded supplier (QS-9000) for the automotive Industries. Our PPM at customers facilities are less than 100 and we grow fastly (500 employees, 6 plants, 2 technical centers).
Second, we want to keep the system as simple as possible for every one (doing less than what we are doing right now is better!).
Third, we make more than 100 similars products (like sausages, but differents size, shape and ingredient)
In the moment, our opinion on spc is: we want to certified our finish product by certifying the toolling. Exemple: If a die cutter is use to cut our part, the die won't change in the near future( maybe wear a little but not that much), so the length will always be the same over time. Instead of doing continous monitoring (like spc) can we certified (or calibrate) our tooling (those which always do the same kind of job) once a month or once a year and make monitoring of the process once a day or once a week? After that we thing be able to fix the process tolerance with CPK (ex: If the customer tolerance are +/-1, be able to say that the CPK will be higher than 3)

Is this thinking right?
Reply With Quote

Sponsored Links
  #2  
Old 3rd October 1999, 11:47 AM
Batman
Unregistered Guest

 
Posts: n/a
If you say that you have identified tooling as the predominant cause of variation, and are trying to control your process by certifying tooling, this likely an acceptable approach.

You can do almost anything to "certify" your product, as long as there is evidence that the product is certifiable. Tooling does change, pressures and temperatures and feed rates can be adjusted, all of which adds to the process variation. As long as you have identified these, know and understand the extent of the variation these changes make, and can prove that all the present process inputs that are responsible for the variation are under control, then certifying the tooling is one way to assure quality.
Reply With Quote
Sponsored Links

  #3  
Old 3rd October 1999, 12:56 PM
Don Winton's Avatar
Don Winton Don Winton is offline
dWizard

Registration Date: Nov 1998
Location: Tullahoma, TN
Age: 53
 
Posts: 475
Thanks Given to Others: 0
Thanked 12 Times in 9 Posts
Karma Power: 63
Karma: 488
Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.
Bomb!

Batman pretty much covers it. Define the key input variables, define the extent of control over these variables and carry on.

Regards,
Don


------------------
Just the ramblings of an Old Wizard Warrior.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > SPC Monitoring and Statistical Analysis Techniques

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Focused CAPA on Missing Finished Nonconforming Product QE ISO 13485 - Medical Devices - Quality Management Systems 4 27th August 2009 03:32 PM
Control charts of finished product characteristics..NonSense? guyramesh SPC Monitoring and Statistical Analysis Techniques 8 30th April 2009 04:14 PM
Product vs. Process Change Control piepie ISO 13485 - Medical Devices - Quality Management Systems 2 22nd August 2008 09:22 AM
Subcontracting Finished Product Russ ISO 9001 - Quality Management Systems Standard 4 29th October 2001 05:50 PM
Differentiating between Process and Product Characteristics in Control Plans charly FMEA and Control Plans 1 9th February 2000 02:06 AM



The time now is 10:01 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts