The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 24th September 1999, 09:42 PM
Dawn Dawn is offline
E-Mails Invalid or Rejected

Registration Date: Sep 1998
Location: St. Marys, PA
 
Posts: 302
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 40
Dawn has less than 100 Karma points so far.
Question On-going capability

To be in compliance with on-going capability:
Can we decide for ourselves how often to measure cpk? Do we have to do a capability study on every order?
Can we use our sample size (6 pieces) maintain those numbers and when we have run 5 orders; we have 30 numbers to do a capability study and determine if our cpk is higher or lower? Will this be acceptable?

------------------
Reply With Quote

Sponsored Links
  #2  
Old 29th September 1999, 08:51 AM
Tony Venn
Unregistered Guest

 
Posts: n/a
You can decide and document how often to measure Cpk yourself. You really need to decide on a frequency that suits you.
If you take 6 pieces over 5 runs and use this data to calculate Cpk, what actions do you take if you get an NG result? You've already shipped product.
Can you use data from initial capability studies, calculate control limits and run an X bar & R chart, taking a sample each time you manufacture product? If sample is in control each time it shows you don't have any major changes. You could then recalculate Cp & Cpk on a rolling basis using the last say 10 or 20 results.
Reply With Quote
Sponsored Links

  #3  
Old 29th September 1999, 08:56 AM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,859
Thanks Given to Others: 1,895
Thanked 1,568 Times in 1,020 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11569
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Screw

Thanks, Tony. Your help is appreciated!
Reply With Quote
  #4  
Old 26th October 1999, 04:22 PM
margherita
Unregistered Guest

 
Posts: n/a
Lightbulb

Following my experience, I am SPC supervisor and have more than 100 XR charts, it is not necessary to calculate too often your CP/CPK index.
In the past I had to send to our customers a certification about CPK for each lot we sent.
Then we have dimostrated them the state of control of our processes.
Now I update the CPK only in the case something is changed in the process, e.g. new raw material (new supplier or new parameters...), or speedy, or when there is a stable change in the position of the process.
When your process dimostrates a state in control the CPK index doesn't change and you don't need to update.
Usually I update this index once/twice per year (after 80/100 values) and I don't find big difference between the old and the last calculation.

------------------

Reply With Quote
  #5  
Old 27th October 1999, 11:04 PM
Dawn Dawn is offline
E-Mails Invalid or Rejected

Registration Date: Sep 1998
Location: St. Marys, PA
 
Posts: 302
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 40
Dawn has less than 100 Karma points so far.
But does that satisfy the QS intent?
Reply With Quote
  #6  
Old 28th October 1999, 10:17 AM
Laura M's Avatar
Laura M Laura M is offline
Courtesy Access

Registration Date: Aug 1999
Location: Rochester, NY US
 
Posts: 759
Thanks Given to Others: 3
Thanked 17 Times in 15 Posts
Karma Power: 70
Karma: 656
Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.
Send a message via AIM to Laura M Send a message via Skype™ to Laura M
Dawn, I believe it does. I used a similar strategy. If a process originally meets CPk requirements, mean centered, etc, and you remain in control, then you have no reason to believe your CPk would have changed. I think the 3rd edition of QS is a little clearer on this than the 2nd. Page 37 - "The supplier shall maintain......to accomplish this...ensure that the control plan and Process flow diagram are implemented."

I had a bit of a problem at an inital assessment (to the second edition) because the auditor didn't understand SPC and was looking for a procedure that stated exactly how often we recalculate. Our procedure at the time stated something like "when a process change is implemented, or control charts indicate....Cpk will be recalculated" Ended up reading alot like the 3rd edition.

Would welcome other thoughts on this. Our strategy was intended to meet the standard without putting ourselves out of business by performing unnecessary statistical analysis.


Reply With Quote
  #7  
Old 28th October 1999, 05:53 PM
David Guffey
Unregistered Guest

 
Posts: n/a
Laura hit the nail on the head when she referred to unnecessary statistical analyses. One of the most important things to keep in mind is customer and / or internal classification of characterisitics. If you do not have to chart, don't, unless you can save money by effecting improvements. Once a Cpk gets above 3.0 (in the 4-6 range), you really need to change how you are charting. Fewer samples may be needed, for example. Too many of us, in our zeal to demonstrate statisitical capability, have overdone it to the extent that we lost the positive value of good, effective control charting.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Can someone share an Excel spreadsheet to measure Cpk or Cp values. qltyperson1 Excel .xls Spreadsheet Templates and Tools 15 18th September 2009 07:50 AM
Is Cpk a good measure of capability? There are several shortcomings of Cpk Tim Folkerts Capability, Accuracy and Stability - Process, Machine, etc. 31 12th February 2009 07:39 PM
How to measure Machine Capability index Cpm rstakkanwar SPC Monitoring and Statistical Analysis Techniques 1 19th December 2008 05:18 AM
Process Capability - TS 16949 8.2.3.1 - How to measure for various processes? suzie SPC Monitoring and Statistical Analysis Techniques 4 25th February 2005 11:55 PM
How to measure Process Capability ( Cp and Cpk) astudent SPC Monitoring and Statistical Analysis Techniques 3 26th October 2004 10:48 AM



The time now is 08:12 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts