The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 26th October 1999, 04:42 PM
margherita
Unregistered Guest

 
Posts: n/a
Question Combining high Cpk (3, 4 or 5) with a set of XR charts

I don't know how to I can combine high Cpk (3, 4 or 5) with a set of XR charts.
Too often the process uses (control limits) only a little part of the tollerance. It is in control but sometime the operator has to adjust it because there is an out of control signal or because the process changes, for any reason, its position.
Too often it is difficult to understand this change because it is too small.
Can anybody suggest me a more powerful SPC tool?
Thanks
Reply With Quote

Sponsored Links
  #2  
Old 26th October 1999, 05:15 PM
Laura M's Avatar
Laura M Laura M is offline
Courtesy Access

Registration Date: Aug 1999
Location: Rochester, NY US
 
Posts: 759
Thanks Given to Others: 3
Thanked 17 Times in 15 Posts
Karma Power: 70
Karma: 656
Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.
Send a message via AIM to Laura M Send a message via Skype™ to Laura M
Lightbulb

I've come across this in machining appliations and went to individuals and moving range charts (I-MR). Often times within subgroup variation was so small that it drove "artificially" narrow control limits. With R-bar being next to zero, the slightest mean shift makes the next subgroup go out when you are still well within tolerance range. Don't know if this is what you are experiencing or not, but my first suggestion would be to make sure you have rational subgroups.

Laura
Reply With Quote
Sponsored Links

  #3  
Old 3rd November 1999, 07:36 PM
Laura M's Avatar
Laura M Laura M is offline
Courtesy Access

Registration Date: Aug 1999
Location: Rochester, NY US
 
Posts: 759
Thanks Given to Others: 3
Thanked 17 Times in 15 Posts
Karma Power: 70
Karma: 656
Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.Laura M is appreciated, and has over 500 Karma points.
Send a message via AIM to Laura M Send a message via Skype™ to Laura M
Have you tried this? Did it help? Anyone else out there have any other ideas? Just thought I'd bring this one to the top of the pile again to see if there are other ideas out there.

Reply With Quote
  #4  
Old 3rd November 1999, 07:38 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,567 Times in 1,019 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11564
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Lurker

We need Don on this one.
Reply With Quote
  #5  
Old 3rd November 1999, 09:50 PM
Don Winton's Avatar
Don Winton Don Winton is offline
dWizard

Registration Date: Nov 1998
Location: Tullahoma, TN
Age: 53
 
Posts: 475
Thanks Given to Others: 0
Thanked 12 Times in 9 Posts
Karma Power: 63
Karma: 488
Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.
Spin!

Well, I am back. My apologies for the delay.

I don't know how to I can combine high CPK (3, 4 or 5) with a set of XR charts.

I assume we are speaking of Xbar-R charts. What follows assumes so.

Too often the process uses (control limits) only a little part of the tolerance.

If this is the case, you would probably want to evaluate whether a control chart would add value at all. Too often, we tend to see the chart as a required item when in actuality it is not. Determine if the chart would add value then determine if the chart is useful. From the brief synopsis above, it sorta sounds you have a solution looking for a problem.

It is in control but sometime the operator has to adjust it because there is an out of control signal or because the process changes, for any reason, its position.

Sounds like you may want to chart the inputs to the process rather than the outputs. Just a thought.

Can anybody suggest me a more powerful SPC tool?

There may be several. For example, you could use a variation on Laura M’s suggestion. You could chart the process capability rather than the process using the X-mR chart, you could use Xbar charts on the inputs rather than the outputs or ignore charts altogether and concentrate on process capability as a metric of your process. The choice is up to you. Be certain a chart is your best choice.

Now, a Rant.

It is a mistake to try to push an SPC apparatus where it neither adds value nor contributes to your productivity. Haphazardly using SPC usually causes more harm than good. This should be foremost on your mind.

End Rant.

Regards,
Don
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Tensile made critical characteristic, but Cpk? High rate of rejection in a part Salman Capability, Accuracy and Stability - Process, Machine, etc. 9 25th May 2006 08:45 PM
Control charts - Seeking known data set to confirm my software DJN SPC Monitoring and Statistical Analysis Techniques 0 15th September 2005 09:36 AM
Need help / feedback on Xbar/R charts and Cpk/Ppk applicability - Assemblies Xman Capability, Accuracy and Stability - Process, Machine, etc. 11 25th September 2002 11:03 AM
Reducing gaging frequency/High Cpk Dura_guy Capability, Accuracy and Stability - Process, Machine, etc. 4 13th September 2002 03:02 PM
High Cpk's and Control Charts - Is it justified to stop using control charts? MSAFAI Capability, Accuracy and Stability - Process, Machine, etc. 7 11th August 2001 02:23 PM



The time now is 10:52 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts