The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 19th February 2000, 12:14 PM
The Fixer The Fixer is offline
Inactive Registered Visitor

Registration Date: Mar 1999
Location: South Bend, IN, USA
Age: 62
 
Posts: 36
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 48
Karma: 207
The Fixer is appreciated, and has over 200 Karma points.The Fixer is appreciated, and has over 200 Karma points.The Fixer is appreciated, and has over 200 Karma points.
Question Guidelines for in-process inspection of PCB repairs:Changing from end-item inspection

Let me begin saying I am impressed with the expertise exibited in this forum. I am NOT an expert so please utilize KISS principles if you respond.
My company has 21 branches engaged in the repair of printed circuit boards in telecommunications equipment. Long before I got into the quality organization, someone decided that end-item inspection of workmanship, packaging, cosmetics, and functionality using MIL-STD-105 was the way to go.
I think this whole process needs to go ! End-item inspections:
a) attempt to "inspect" quality into the system
b) cause a QC bottleneck
c) waste time with lot resubmittals via rework and reinspection
d) allows technicians to submit substandard work hoping that their units will not be selected as part of the sample.
e) etc., etc., etc.

I am looking for guidelines to perform work-in-progress inspections so quality is built into the system, not retroactively inspected into it. However, 99% of the information in this forum deals with high volume manufactured product. In my business, all the six-sigma, cpK, characteristic curve stuff was performed on the product when it was originally manufactured. We are basically doing rework when the unit fails in the field.
I am having difficuly determining among other things, (with respect to in-process) how to define a "lot" and "sample". Some processes involved are checking the unit in, following a documented repair process for each unit type, affecting repairs in accordance with IPC-610 standards, proper packaging and labeling, modifications, and shipping.It's seems as if I need an almost perpetual internal audit program.

Allowing for my lack of SPC insight, understand that I have the customer's best interests driving this request.

I'm not looking for a system so riddled with data analysis that it negates the time savings I'm trying to gain by eliminating the "extra" process of end-item inspections. Any arrows pointing in the right direction will be greaty appreciated.
Reply With Quote

Sponsored Links
  #2  
Old 22nd February 2000, 09:22 AM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Yin Yang

Quote:
I am looking for guidelines to perform work-in-progress inspections so quality is built into the system, not retroactively inspected into it.
I suspect you are going to have a bit of a problem defining 'work in progress' inspections. Typically in repair you have a variety of possible problems. If you have 21 branches you probably repair a somewhat wide variety of products. I suspect you are hiring folks who are 'qualified' to troubleshoot. Obviously I have no idea what your processes are. Do the techs have automated test equipment? Do they have OEM prints?

You talk about Mil-Std-105 which is a sampling 'procedure'. I'm not sure exactly how you would apply that to your end item inspection. Are you saying you take a sample and examine "...inspection of workmanship, packaging, cosmetics, and functionality..."?

I suggest you determine what checks you currently do at the 'end' of your process and determine where each event occurs. I'm going to assume that a functionality test/check would be made by the technician doing the repair - not at the end of the 'process'.

What I am saying is provide a 'router' with appropriate checks/tests at each stage. You say: "...d) allows technicians to submit substandard work hoping that their units will not be selected as part of the sample..." This is a factor of your company's tenor. If you allow this for any reason you're out of control. I'm not saying this is not typical - many companies are. The question is why? If a tech submits sub-standard work, what happens? Does this affect the tech? Is the tech called to explain what happened? Is there a mechanism to track what techs consistently submit sub-standard work?

What are your current 'end of the line' inspections/tests telling you? What are you finding and how are you addressing the issues?
Quote:
I am having difficuly determining among other things, (with respect to in-process) how to define a "lot" and "sample".
I don't know that you have 'lots' in your business in the traditional sense. As far as a sample goes, you have to look at your process. Give me an example of what you are currently sampling for.
Quote:
It's seems as if I need an almost perpetual internal audit program.
You internal audit program should be verifying (by sample) that employees are doing their job in the manner you specify in your documentation and systems in general. I'm not sure what would drive you to a 'perpetual' audit program. Internal audit programs are, by definition, 'perpetual' (you do them every year) but not every day.

Quote:
Allowing for my lack of SPC insight, understand that I have the customer's best interests driving this request.
What do you currently track statistically?
Reply With Quote
Sponsored Links

  #3  
Old 22nd February 2000, 08:21 PM
The Fixer The Fixer is offline
Inactive Registered Visitor

Registration Date: Mar 1999
Location: South Bend, IN, USA
Age: 62
 
Posts: 36
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 48
Karma: 207
The Fixer is appreciated, and has over 200 Karma points.The Fixer is appreciated, and has over 200 Karma points.The Fixer is appreciated, and has over 200 Karma points.
This is how it works: (broad brush)

Defective units are received and a Repair Order is generated.

The units are filtered into the "tech room" by dept based on unit type.

The units are diagnosed, repaired, and modified as necessary by technicians using both company designed and OEM automated test platforms.

Repaired units then go to labeling.

NOW, the units are placed on a "Awaiting QC" cart and inspected in lots by single or combined department number.

The sample size is determined by MIL-STD-105 for lots usually ranging from 30 - 150 units.

The QC inspectors, AT THE END OF THE "LINE" now inspect for packaging, cosmetics, workmanship, and functionality. (The samples have to be taken back to the test platform and run by QC inspectors)

Then the units are taken to the warehouse area for return to stock and eventual shipping.

The QC function stuck at the end of the process adds additional turn around time. Also, the technicians have to move to another function while QC has their bench for QC testing.

This whole process is reactive and time wasting. You can see why I want to change it.

By the way, we have been registered to ISO9001 since 1995 and have had very successful registration and surviellance audits. I'm not trying to imply that there is no quality conciousness here. I just think that you can only improve the quality of work so much with this end-item approach.

I want to have the QC inspectors on the floor auditing all the functions in real time, not after the fact. That's what I meant by "perpetual internal audits".

Yes, I doubt that "lots" would be relevant and therefore MIL-STD-105 would no longer apply. I have gone out to the floor and experimented with this and found a host of issues that never came up during the end-item inspections. I found I was fixing the cause, not the effect. This is exactly the goal of what I termed an "In-Process" inspection technique.

I posted to this forum to see if there were any guidelines with which to govern a non manufacturing inspection scheme like this.

If not, maybe I'll just go ahead and invent it !


Thanks,
Glenn
Reply With Quote
  #4  
Old 23rd February 2000, 09:50 AM
Sam's Avatar
Sam Sam is offline

Registration Date: Sep 1999
Location: Oklahoma
Age: 67
 
Posts: 1,437
Thanks Given to Others: 1
Thanked 29 Times in 17 Posts
Karma Power: 90
Karma: 1020
Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.Sam is appreciated, and has over 900 Karma points.
My opinion follows each step of "The Fixer's" process:

1- Defective units are received and a Repair Order is generated.
a- Tech verifies and signs off as complete

2- The units are filtered into the "tech room" by dept based on unit type.
a- Estasblish a designated hold area. Release work based on FIFO.

3- The units are diagnosed, repaired, and modified as necessary by technicians using both company designed and OEM automated test platforms.
a- Develop checklists that the Tech can sign off to indicate verification/validation of repair requirements.

4- Repaired units then go to labeling.
a- Tech sign-off

5- NOW, the units are placed on a "Awaiting QC" cart and inspected in lots by single or combined department number.
a- Eliminate this step.

The sample size is determined by MIL-STD-105 for lots usually ranging from 30 - 150 units.
a- Archive the MIL-Std-105

6- The QC inspectors, AT THE END OF THE "LINE" now inspect for packaging, cosmetics, workmanship, and functionality. (The samples have to be taken back to the test platform and run by QC inspectors)
a- Eliminate this step

7- Then the units are taken to the warehouse area for return to stock and eventual shipping.

Develop a checklist for your inspector/auditor to use for randomly auditing the process,i.e, two audits in the AM, two audits in the PM.
In-process is completed and documented by the Tech.

Hope this helps a little.
Reply With Quote
  #5  
Old 24th February 2000, 12:43 PM
The Fixer The Fixer is offline
Inactive Registered Visitor

Registration Date: Mar 1999
Location: South Bend, IN, USA
Age: 62
 
Posts: 36
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 48
Karma: 207
The Fixer is appreciated, and has over 200 Karma points.The Fixer is appreciated, and has over 200 Karma points.The Fixer is appreciated, and has over 200 Karma points.
Sam,
Guess I should have provided a little more info. The Repair Order goes through the entire repair process from receiving to shipping and contains signature blocks for the Receiver, Technician, QC, Labeler, and Shipper. So everyone already has accountability along the way. Each equipment "handler" is responsible for certain entries on the RO Card. This isn't difficult to inspect. However, we find that the vast majority of errors are in the information that is entered on the RO Card. (Wrong unit ID, Wrong repair code, Wrong warranty status, etc.)
By the time the unit reaches QC, the errors have already been committed. Most get fixed as the unit moves through the process. But some get through the whole process. Those are the ones that QC finds. That's where I think the inspection of work-in-process would be valuable. We would have a better chance of correcting the root cause so NO-ONE will have to fix someone elses mistake.

The biggest problem I'm having is structuring the auditing of the repair process. A lot of the technicians' job is cognitive. We have no Quality System Procedures which define the techs diagnostic thought processes. So, if I am auditing the testing process of an "ABC" unit, there will come a time at which the tech will utilize cognitive skills to diagnose the problem. So what does the QC inspector do at this point ? Go to another bench and come back later ? It could take the tech a couple minutes or an hour to figure out what's wrong with the unit.

The other processes (receiving, labeling, etc) are not difficult to monitor because they follow an established routine. But trying to observe the repair process is tough.

But someway, our process has to ensure reliability before this equipment goes to the customer. I just don't see a way to get around re-testing by QC at the end of the process.



Reply With Quote
  #6  
Old 25th February 2000, 09:34 AM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Question

When you analyze what 'gets past' your technicians, what do you find? That is what would be my initial guide.
Reply With Quote
  #7  
Old 27th February 2000, 11:29 AM
The Fixer The Fixer is offline
Inactive Registered Visitor

Registration Date: Mar 1999
Location: South Bend, IN, USA
Age: 62
 
Posts: 36
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 48
Karma: 207
The Fixer is appreciated, and has over 200 Karma points.The Fixer is appreciated, and has over 200 Karma points.The Fixer is appreciated, and has over 200 Karma points.
Marc,
Your last response evoked an interesting theory which I haven't seen presented as a part of common statistical analysis techniques.
First, I have created a national database via which I can monitor QC data in any dept, branch, region, or nationally. I use primarily a PARETO analysis or a parameter search to examine specific QC stats.
Now, the theory. Looking at the data over the past year or so, I've concluded that our Quality System has reached what I will term our PME - Point of Maximum Effectivity.
Given the "society/environment" in which a quality sampling technique exists and the specific type of technique used, is there a point (practical not theoritical)at which there can be no more improvement ? We seem "locked in" to relatively the same types and quantities of errors regardless of continuous improvement initiatives.
Considering your last response, I'm convinced that although I had not looked at it from this perspective before, my perception of the need for a change in inspection methods is due to the fact that management involvement, internal audits, corrective actions, etc. have made "this" system as effective as it's ever going to get.
Specifically addressing your response, the PARETO charts can certainly go a long way in determining what to "look for" when performing "work-in-progress" inspections. Unfortunately, due to the number of functional failures showing up in the charts, I don't think I'll be able to eliminate the need for the "invasive" process of having QC re-test finished product. It's just too high a risk to the customer at this point. I'll have to just wait and see if new inspection techniques eventually reduce functional failures by embedding a higher quality mindset into the repair process.

Glenn


Reply With Quote
  #8  
Old 29th February 2000, 09:47 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11559
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Yin Yang

My overview of quality assurance and all that jazz is that of an evolutionary process. That combined with continually hypothesizing and testing. The rut is the problem for many. It becomes "..This has worked for the last x years..." or "...we tried TQM and it failed..." What I line about implementations, and what makes me shine, is during an implementation (typically) the company is forced to take a hard look at some aspects of their processes. It's not me - I shine because some people 'open their eyes' and it *appears* to be me...

You know, Glenn, your attitude will achieve as much as (if not more than) any tool out there. Question, hypothesize and test.

What this means to me is new ideas. New thoughts. New blood. Look at San Jose - they want kids who are asking questions. Looking. Feeling.

Management says "...implement TQM..." What does that tell one? TQM is a number of tools.

The US repubilcan party fights statistical techniques in the 10 year census. What does that tell us?

If statistics 'grabs' you, they can tell you a lot. But - don't let that keep you from looking everywhere for answers - or from looking for alturnate tools. Use stats to guide your questions and hypotheses. Then use stats to evaluate your test results.

[This message has been edited by Marc Smith (edited 29 February 2000).]
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
How to handle Incoming (Receiving) Inspection as a PFMEA item? ZLYDCOM FMEA and Control Plans 14 16th November 2009 11:27 AM
PCB (Printed Circuit Board) Assembly Inspection Checklist aeroqual Inspection and Test, Sampling and Related Topics 5 23rd March 2009 09:44 AM
Facility setup for Substrate & PCB Visual Inspection rickyapachew Manufacturing and Related Processes 5 27th February 2008 08:50 AM
100% Measurement Shift to Sample Inspection? PCB Substrates Magus Inspection and Test, Sampling and Related Topics 3 2nd November 2006 02:44 PM
Process Control Plan and Inspection Plans - Receiving and final inspection required? krishkaar Inspection and Test, Sampling and Related Topics 8 3rd November 2004 07:46 AM



The time now is 10:53 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts