The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Reliability Analysis - Predictions, Testing and Standards


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 25th October 2006, 04:51 AM
ohlargeone ohlargeone is offline
Registered Visitor

Registration Date: Jul 2005
Location: China
Age: 32
 
Posts: 10
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 18
Karma: 10
ohlargeone has less than 100 Karma points so far.
Please Help! Which reliablity items should be tested for backside metallization process?

Which reliablity items should be test for backside metallization process?
and how to test?
My conpany is a wafer foundry. We are setting up new process on backside meatallization process for DMOS.
Reply With Quote

Sponsored Links
  #2  
Old 25th October 2006, 06:46 AM
chergh chergh is offline
On Holiday

Registration Date: May 2005
Location: UK
Age: 32
 
Posts: 398
Thanks Given to Others: 6
Thanked 45 Times in 36 Posts
Karma Power: 0
Karma: 1440
chergh is appreciated, and has over 1300 Karma points.chergh is appreciated, and has over 1300 Karma points.chergh is appreciated, and has over 1300 Karma points.chergh is appreciated, and has over 1300 Karma points.chergh is appreciated, and has over 1300 Karma points.chergh is appreciated, and has over 1300 Karma points.chergh is appreciated, and has over 1300 Karma points.chergh is appreciated, and has over 1300 Karma points.chergh is appreciated, and has over 1300 Karma points.chergh is appreciated, and has over 1300 Karma points.
Default Re: backside metallization reliability issue

As there seems to be a big thing about acronyms I will first put DMOS is a Diffusion Metal Oxide Semiconductor.

As for you reliability items I have the following opinions, worked in semicon a while back so my memory may be abit dodgy.

You will probably want to measure metal layer thickness, wafer bowing, wafer stress and how well it bonds with solder. How you are going to do these I am not sure but I am sure you must have equipment for most of these in your facility, you may need to rely on data from the front end processes for the solder bond item.

If you explain what reliability issues you are having we may be able to help more.
Reply With Quote
Sponsored Links

  #3  
Old 25th October 2006, 01:27 PM
Michael Walmsley Michael Walmsley is offline
E-Mails Invalid or Rejected

Registration Date: Dec 2005
Location: US
 
Posts: 158
Thanks Given to Others: 1
Thanked 19 Times in 6 Posts
Karma Power: 0
Karma: 810
Michael Walmsley is appreciated, and has over 700 Karma points.Michael Walmsley is appreciated, and has over 700 Karma points.Michael Walmsley is appreciated, and has over 700 Karma points.Michael Walmsley is appreciated, and has over 700 Karma points.Michael Walmsley is appreciated, and has over 700 Karma points.Michael Walmsley is appreciated, and has over 700 Karma points.Michael Walmsley is appreciated, and has over 700 Karma points.
Default Re: backside metallization reliability issue

Here is an easy read.
http://www.weibull.com/mil_std/mil_hdbk_338b.pdf
Reply With Quote
  #4  
Old 30th October 2006, 09:07 AM
ohlargeone ohlargeone is offline
Registered Visitor

Registration Date: Jul 2005
Location: China
Age: 32
 
Posts: 10
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 18
Karma: 10
ohlargeone has less than 100 Karma points so far.
Thumbs up Re: backside metallization reliability issue

Quote:
Originally Posted by chergh View Post

As there seems to be a big thing about acronyms I will first put DMOS is a Diffusion Metal Oxide Semiconductor.

As for you reliability items I have the following opinions, worked in semicon a while back so my memory may be abit dodgy.

You will probably want to measure metal layer thickness, wafer bowing, wafer stress and how well it bonds with solder. How you are going to do these I am not sure but I am sure you must have equipment for most of these in your facility, you may need to rely on data from the front end processes for the solder bond item.

If you explain what reliability issues you are having we may be able to help more.
Thanks for your comments.
our metallization process:backside wafer griding+metal vapour(Ti+Ni+Ag)
and bacside wafer griding + backside metal sputter
the potential issue we are worried about is backside metal peeling.
so how to qualify it and monitor it?
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Reliability Analysis - Predictions, Testing and Standards

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Reliablity Block Diagram - RBD Concept bbabu Reliability Analysis - Predictions, Testing and Standards 10 24th July 2008 05:39 AM
Process Transfer - How to analyse all items and threads? brutas Quality Tools, Improvement and Analysis 1 5th March 2008 10:55 AM
How many items should be tested to qualify an analog IC? ohlargeone Reliability Analysis - Predictions, Testing and Standards 2 7th December 2006 08:21 PM
Retention Time of Items Tested clarification - QS-9000 section 4.10.6.3 pancho QS-9000 - American Automotive Manufacturers Standard 3 2nd August 2004 04:35 PM
Seeking: Process Audit template which has been tried and tested Paul Mc Process Audits and Layered Process Audits 45 22nd May 2002 03:34 PM



The time now is 09:26 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts