9th October 2000, 04:54 PM
|
|
|
Cpk or Ppk in packaging closure manufacturing?
I am a Quality Manager in a closure/end manufacturing facility. Our products are used on products such as composite cans for powdered beverage and peanuts. The Cpk/Ppk is a vital measurement that our company lives and dies by. We currently use DataMyte collection systems and run Turbo SPC, a dos based program. Here recently, I pulled raw data out of Turbo and transfered it over to Minitab. After doing this, I discovered that Turbo's Cpk was the Ppk in Minitab. Many of our customers want Cpk reports for the products they are receiving. But our company wants long term capability, Ppk. As I understand, Ppk makes an assumption on what you will do long term if you make no changes. Is this correct? Our process involves metal stamping, we change dies and die components on a certain number of strokes. Therefore, we are consistently makes changes from month to month. What would be the best measurement to use in this type of manfacuring?
|

12th October 2000, 12:02 PM
|
|
|
|
Cpk is used when historical data shows the process to be stable. It is based on using a sample standard deviation.
Ppk is used when a process is chronically unstable but showing a predictable pattern. It is based on the standard deviation of not the sample size, but of all the individual samples.
Your company needs to base its decisions on the above criteria and as always give the customer what he wants. Most software programs today have an option to report either or both of these measurements. One can be used internally and one can be used for the customer.
ASD...
|

12th October 2000, 12:09 PM
|
 |
Your Elsmar Cove Host
Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
|
|
Posts: 15,859
Thanks Given to Others: 1,895
Thanked 1,568 Times in 1,020 Posts
Karma Power: 605
|
|
|
Lower Navigation Bar
|
|
|
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
Similar Discussion Threads
|
| Discussion Thread Title |
Thread Starter |
Forum |
Replies |
Last Post or Poll Vote |
|
What is the meaning of "k" in Cpk and Ppk? And Cpk vs. Ppk
|
Star18 |
Capability, Accuracy and Stability - Process, Machine, etc. |
15 |
16th March 2009 06:44 PM |
|
Cpk vs Ppk - Which should you use and How to Calculate Cpk and Ppk
|
Nitin Sharma |
SPC Monitoring and Statistical Analysis Techniques |
25 |
13th October 2008 07:44 PM |
|
Validation of Cpk and Ppk calculations - Sheet to check Cpk and Ppk values
|
Howard Atkins |
SPC Monitoring and Statistical Analysis Techniques |
0 |
20th February 2006 03:41 AM |
|
What is the difference between Cp, Cpk and Ppk?
|
Enrique |
Capability, Accuracy and Stability - Process, Machine, etc. |
2 |
10th August 2005 12:21 PM |
|
What is the difference between Ppk and Cpk
|
Brad Lee |
Capability, Accuracy and Stability - Process, Machine, etc. |
2 |
19th February 2001 07:25 AM |
|
|