The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > SPC Monitoring and Statistical Analysis Techniques


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 11th May 1999, 02:06 AM
si kang
Unregistered Guest

 
Posts: n/a
Please Help! How does one calculate Cpm (Taguchi process capability)

Hello, sir
I am QA engineer who is in charge of SPC activity in the field of semiconductor assembly in korea.
The question is that I heard that there is a new procability capability index not Cpk.
That is Cpm(Taguchi process cability index) which is from A.I.A.G Manual and JMP Statistical software.
Exactly,I know the meaning of Cpm and what the calculation is.
If possible, Could you specify your answer on the above my questions.


Thanks and best rgds.
SI Kang from korea.
Reply With Quote

Sponsored Links
  #2  
Old 11th May 1999, 10:46 AM
Don Winton's Avatar
Don Winton Don Winton is offline
dWizard

Registration Date: Nov 1998
Location: Tullahoma, TN
Age: 53
 
Posts: 475
Thanks Given to Others: 0
Thanked 12 Times in 9 Posts
Karma Power: 63
Karma: 488
Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.
Default

I have never heard of 'Taguchi Process Capability Index' but I have heard of Cpm. Process capability index Cpm is used when a target value other than the center of the specification spread has been designated as desirable. Maybe AIAG has modified the Loss Function equations to relate to process capability. Perhaps some QS folks could elaborate as that I stay away from AIAG's stuff as much as possible.

Regards,
Don

------------------
Just the ramblings of an Old Wizard Warrior.
Reply With Quote
Sponsored Links

  #3  
Old 11th May 1999, 07:16 PM
Batman
Unregistered Guest

 
Posts: n/a
Default

As far as AIAG, I know that Cpm is mentioned in the QS9000 SPC manual, but only mentioned. It does not seem to be popular with the automotive folks. I remember reading about it some years ago, but it was not top on the list, so I recall little. Don has more than I remember.

If you need Cpm capability software, my company has used Statgraphics for many years, and it reports Cpm with the capability study module.
Reply With Quote
  #4  
Old 12th May 1999, 01:04 AM
Don Winton's Avatar
Don Winton Don Winton is offline
dWizard

Registration Date: Nov 1998
Location: Tullahoma, TN
Age: 53
 
Posts: 475
Thanks Given to Others: 0
Thanked 12 Times in 9 Posts
Karma Power: 63
Karma: 488
Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.
Default

I checked AIAG, Alta Vista and JMP and cannot find any reference to 'Taguchi' and 'Process Capability' anywhere (linked together, anyway). Perhaps you were misinformed.

You can find additional information on Cpm at:

http://Elsmar.com/pdf_files/ Look for CPK.pdf

which may (or may not) help.

Regards,
Don

------------------
Just the ramblings of an Old Wizard Warrior.
Reply With Quote
  #5  
Old 14th May 1999, 02:27 AM
si kang
Unregistered Guest

 
Posts: n/a
Default

Hello,
Thank you for your reply on the Cpm.
But I have wondering about Cpm calculation with target value.
If one side spec limit exists, how could the calculation be?
The reason is that Cp=(USL-LSL)/6*SIGMA.
in case of only existing USL or LSL,the index of Cp is not available.
Eventually, Cp can be calculated from having both two sides spec limit such as USL and LSL.
Is there any alternative or not?
To get Cpm for measuring process capability , It is necessary to have two sides spec limit not one side.
And Batman has mentioned Cpm not popular in automotive site for measuring process.
only automotive site or not?

Could you Please confirm the above my questions?

Thanks in advance.
SI Kang from korea.
Reply With Quote
  #6  
Old 14th May 1999, 10:55 AM
Don Winton's Avatar
Don Winton Don Winton is offline
dWizard

Registration Date: Nov 1998
Location: Tullahoma, TN
Age: 53
 
Posts: 475
Thanks Given to Others: 0
Thanked 12 Times in 9 Posts
Karma Power: 63
Karma: 488
Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.
Default

Quote:
If one side spec limit exists, how could the calculation be?
If a one sided specification limit exists, you use Cpk(max), sometimes referred to as Cpku, or Cpk(min), sometimes referred to as Cpkl.

Cpk(max) = (USL-Xbar)/(3*s)

Cpk(min) = (Xbar-LSL)/(3*s)

Quote:
To get Cpm for measuring process capability , It is necessary to have two sides spec limit not one side.
Correct only in that the calculation for Cpm requires Cp in the numerator. As I mentioned earlier, Cpm is used when the target value is not the center of the specification spread.

Perhaps this will help:

Cp = (USL-LSL)/(6*s); Process capability when Xbar = Specification center

Cpk = Minimum[(USL-Xbar)/(3*s);(Xbar-LSL)/(3*s)]; Process capability when Xbar <> Specification center

Cpk(max) = (USL-Xbar)/(3*s); Process capability for USL only

Cpk(min) = (Xbar-LSL)/(3*s); Process capability for LSL only

Cpm = Cp/[1+((Xbar-T)^2/s^2)]; Where T is the target value. Explained above.

Quote:
And Batman has mentioned Cpm not popular in automotive site for measuring process.
Cpm is not popular anywhere because it usually means the process is running off-target and the calculation is made to the off-target value rather that the preferred target value.

Regards,
Don

------------------
Just the ramblings of an Old Wizard Warrior.
Reply With Quote
  #7  
Old 17th May 1999, 09:00 AM
si kang
Unregistered Guest

 
Posts: n/a
Default

Hello,
Thank you for your continuous and quick response on my question.

You have mentioned that "Cpm is not popular anywhere because it usually means that the process is running off-target value and calculation is made to the off-target value rather that the preferred target value."
I'm really sorry that I don't exactly understand those meanining you have mentioned.
Your more details are needed to me at this time.

Thanks & best regards.
SI Kang.
Reply With Quote
  #8  
Old 18th May 1999, 11:57 AM
Don Winton's Avatar
Don Winton Don Winton is offline
dWizard

Registration Date: Nov 1998
Location: Tullahoma, TN
Age: 53
 
Posts: 475
Thanks Given to Others: 0
Thanked 12 Times in 9 Posts
Karma Power: 63
Karma: 488
Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.
Default

Quote:
I'm really sorry that I don't exactly understand those meaning you have mentioned.
My explanation above is not very clear and stems from my personal applications of process capability. No apologies necessary.

I should expound upon the use of Cpm. Most of my references are rather vague on Cpm as it is not a popular measure of process capability. Thus, the following is not from any official reference I could find, but it seems the logical one.

I believe the original concept of Cpm comes from the application of unilateral and bilateral tolerances. A bilateral tolerance expresses the value as a target value and a range, i.e. 2.0cm +/- 0.1 cm, with the target value and the center of the specification being equal. For bilateral tolerances, Cp or Cpk are applicable.

Unilateral tolerances are given as a target value and a single limit, i.e. 2.0cm +0.0cm/-0.1cm. For unilateral tolerances, Cpku and Cpkl are applicable (other expressions are CpU and CpL, respectively).

I believe Cpm came from a variation of the bilateral tolerance. Tolerances are expressed as a target and a nonsymmetrical range, i.e. 2.0cm +0.2cm/-0.1cm. In this case, 2.0 cm is the target but is not the center of the tolerance (2.05cm is the center). From the definition of Cpm above, "…target value other than the center of the specification spread has been designated as desirable." However, nonsymmetrical tolerances are rarely used in these days of CAD, so it appears that Cpm is also rare, thus rarely used.

Suggestion: Forget Cpm all together and use the four basic definitions of process capability. Besides, if it is indeed from the "A.I.A.G Manual," I personally would not put a lot of stock in it.

Regards,
Don

------------------
Just the ramblings of an Old Wizard Warrior.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > SPC Monitoring and Statistical Analysis Techniques

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
How to measure Machine Capability index Cpm rstakkanwar SPC Monitoring and Statistical Analysis Techniques 1 19th December 2008 05:18 AM
How to calculate the capability when the tool life is low Narayana Capability, Accuracy and Stability - Process, Machine, etc. 8 11th June 2008 09:26 AM
Unilateral characteristics - What capability indicators should we calculate? Star18 SPC Monitoring and Statistical Analysis Techniques 3 31st May 2006 07:47 AM
Capability - How to calculate Capability Indices for Non-normal Distributions lisaptran SPC Monitoring and Statistical Analysis Techniques 11 25th January 2006 11:15 AM
Capability study - What Values do I have to input to calculate Cp and Cpk NetScorpium Capability, Accuracy and Stability - Process, Machine, etc. 9 20th December 2004 05:33 AM



The time now is 05:25 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts