The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > SPC Monitoring and Statistical Analysis Techniques


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 9th July 1999, 04:36 AM
Tamashiro
Unregistered Guest

 
Posts: n/a
Please Help! Process Capability - Long-term vs. Short-term

In the Statistical process Control Reference Manual published by AIAG, capability falls under 2 categories; long-term and short-term. On page 59, Long-term capability is denoted as Cpk and uses an estimated process standard deviation while short-term capability is denoted as Ppk using the calculated standard deviation. It has been argued and published by many statistical program companies that Ppk is long-term and Cpk is short-term. the reasoning for this confusion relies on the definition of what long-term and short term is and how it relates to the standard deviation. What is the definition of Cpk and Ppk and why do most software companies publish process capability contrary to the statements in the AIAG manuals?
Reply With Quote

Sponsored Links
  #2  
Old 9th July 1999, 12:16 PM
Don Winton's Avatar
Don Winton Don Winton is offline
dWizard

Registration Date: Nov 1998
Location: Tullahoma, TN
Age: 53
 
Posts: 475
Thanks Given to Others: 0
Thanked 12 Times in 9 Posts
Karma Power: 63
Karma: 488
Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.
Clown

There is some discussion of Cpk versus Ppk at:

http://Elsmar.com/ubb/Forum10/HTML/000028.html

As far as the differences between AIAG and the software companies, I ain't gotta clue.

Regards,
Don
Reply With Quote
Sponsored Links

  #3  
Old 10th July 1999, 01:15 AM
Lassitude
Unregistered Guest

 
Posts: n/a
Question

Quote:
why do most software companies publish process capability contrary to the statements in the AIAG manuals?
Because the AIAG is not the only 'expert' or business in the world. Software companies are looking to sell to the world, not just Ford, GM and Chrysler.

Specifically which software package are you talking about?
Reply With Quote
  #4  
Old 11th July 1999, 01:44 AM
Tamashiro
Unregistered Guest

 
Posts: n/a
Specifically Minitab
Reply With Quote
  #5  
Old 11th July 1999, 02:41 AM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,567 Times in 1,019 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11564
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Question

I have no experience with minitab to know. Can you cite the specific equation differences (or other details of the differences) you are asking about?
Reply With Quote
  #6  
Old 11th July 1999, 04:52 PM
Tamashiro
Unregistered Guest

 
Posts: n/a
The equation for process capability is exactly the same as indicated in the AIAG reference manual. The clarification I'm looking for is in the definition of long term and short term. The AIAG reference manual does not define long term or short term, but seems to imply long term using Cpk. Cpk uses an estimated sigma, which implies it estimates capability based on trend and therefore may predicate future capability. Ppk, however uses a finite source of data for sigma, which implies capability for that particular set of data.
In some of the software packages, I've noticed Cpk is referenced as short-term and Ppk as long-term. What is the definition of long-term and short-term capability and is long-term represented by Cpk or Ppk?
Reply With Quote
  #7  
Old 12th July 1999, 02:09 AM
Don Winton's Avatar
Don Winton Don Winton is offline
dWizard

Registration Date: Nov 1998
Location: Tullahoma, TN
Age: 53
 
Posts: 475
Thanks Given to Others: 0
Thanked 12 Times in 9 Posts
Karma Power: 63
Karma: 488
Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.
Clown

I am not familiar with Minitab either. I also do not have a copy of the AIAG manual. But, as I elaborated on in the forwarding thread I referenced above, I believe AIAG has produced more problems by creating this Ppk thing. I had never heard of it before the forwarding thread above, nor had I heard of short-term or long-term capability studies.

All process capability studies should use an unbiased estimate of standard deviation or calculated standard deviation as detailed in the CPK.PDF file located at the PDF Zone section of the Cove. It states:

"To obtain an accurate estimate of the process spread (standard deviation), at least sixty data points are needed. If less that sixty data points are available, use the following formula with error correction factors given in Table 1."

Basically, if there are less than sixty data points, you use an unbiased estimate of standard deviation corrected by the formula. If greater than sixty data are available, use the standard deviation calculated from the data.

BTW, which symbol (s, sigma-hat, s-hat, etc.) does the AIAG manual use in the formula for Ppk and Cpk to represent process spread?

Regards,
Don

------------------
Just the ramblings of an Old Wizard Warrior.
Reply With Quote
  #8  
Old 17th July 1999, 06:59 PM
BRoyal BRoyal is offline
Inactive Registered Visitor

Registration Date: Nov 1998
Location: Iowa City, IA
Age: 65
 
Posts: 30
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 45
Karma: 10
BRoyal has less than 100 Karma points so far.
Davis Bothe addresses the difference between Cpk and Ppk in his book "Measuring Process Capability." McGraw-Hill is the publisher. Be aware that this book will probably tell you more than you want to know about process capability

Ben Royal
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > SPC Monitoring and Statistical Analysis Techniques

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Interpretation of Short term vs. Long term Capability Studies Chennaiite SPC Monitoring and Statistical Analysis Techniques 3 24th March 2009 09:05 AM
Process Capability Sheet for a short term 30 piece study needed jkittle SPC Monitoring and Statistical Analysis Techniques 1 24th April 2007 04:51 PM
Cpk vs. Ppk - Long Term vs. Short Term - Capability vs. Stability DJN Capability, Accuracy and Stability - Process, Machine, etc. 25 15th March 2006 01:26 AM
Short and Long term effects of humidity on tooling and gages DE_Perry ISO 17025 - Calibration, Measurement Gages and Test Laboratories 6 6th August 2005 12:02 PM
Capability: Short Term or Long Term? Cpk= Long term and Ppk= Short term? Andrews Capability, Accuracy and Stability - Process, Machine, etc. 15 22nd January 2004 04:28 PM



The time now is 08:16 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts