The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > National and International Business Standards > FDA (United States Food and Drug Administration) > Pharmaceuticals (21 CFR parts 210 & 211)


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 19th December 2006, 09:59 AM
Quality Girl Quality Girl is offline
E-Mails Invalid or Rejected

Registration Date: Dec 2006
Location: UK
 
Posts: 5
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 10
Quality Girl has less than 100 Karma points so far.
Please Help! Permanent Inspection Readiness for a pharma manufacturing firm

I'm working an a project of permanent inspection readiness for a pharma manufacturing firm. The idea being that we'd be ready to host an inspection should an regulatory agency appear at the door tomorrow. In an ideal world we would always be in this position, but realistically it's not always the case. Has anyone managed a project like this before, and if so how did you approach it?
Clare
Reply With Quote

Sponsored Links
  #2  
Old 19th December 2006, 10:43 AM
Ajit Basrur's Avatar
Ajit Basrur Ajit Basrur is offline
Super Moderator

Registration Date: Dec 2005
Location: India
Age: 46
 
Posts: 2,647
Thanks Given to Others: 674
Thanked 803 Times in 579 Posts
Karma Power: 176
Karma: 5448
Ajit Basrur is appreciated, and has over 1700 Karma points.
Ajit Basrur is appreciated, and has over 1700 Karma points.Ajit Basrur is appreciated, and has over 1700 Karma points.Ajit Basrur is appreciated, and has over 1700 Karma points.Ajit Basrur is appreciated, and has over 1700 Karma points.Ajit Basrur is appreciated, and has over 1700 Karma points.Ajit Basrur is appreciated, and has over 1700 Karma points.Ajit Basrur is appreciated, and has over 1700 Karma points.Ajit Basrur is appreciated, and has over 1700 Karma points.Ajit Basrur is appreciated, and has over 1700 Karma points.Ajit Basrur is appreciated, and has over 1700 Karma points.Ajit Basrur is appreciated, and has over 1700 Karma points.Ajit Basrur is appreciated, and has over 1700 Karma points.Ajit Basrur is appreciated, and has over 1700 Karma points.Ajit Basrur is appreciated, and has over 1700 Karma points.
Default Re: Permanent Inspection Readiness for a pharma manufacturing firm

Quote:
Originally Posted by Quality Girl View Post

I'm working an a project of permanent inspection readiness for a pharma manufacturing firm. The idea being that we'd be ready to host an inspection should an regulatory agency appear at the door tomorrow. In an ideal world we would always be in this position, but realistically it's not always the case. Has anyone managed a project like this before, and if so how did you approach it?
Clare
Hi Quality Girl,

It can be achieved in reality too

We are audit ready and can face any auditor at any given time. There were a couple of things we did -

1. Daily Housekeeping audit (first impression is the last impression)

2. Once a fortnight detailed IQA by analyst as per checklist. Thus, in a particular month covered most standard requirements and things like CAPAs, Non conforming issues, MRB, Cust Complaints etc.

3. Once a month audit by Supervisor / Manager

All the observations were taken seriously and we could do it.

Not difficult; give a try !!!

__________________
I have no special talents. I am only passionately curious - Albert Einstein
Reply With Quote
Sponsored Links

  #3  
Old 19th December 2006, 12:02 PM
Jim Wynne's Avatar
Jim Wynne Jim Wynne is offline
Courtesy Access

Registration Date: Jan 2005
Location: Southeast Wisconsin
Age: 57
 
Posts: 9,216
Thanks Given to Others: 755
Thanked 2,298 Times in 1,550 Posts
Karma Power: 612
Karma: 20405
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Default Re: Permanent Inspection Readiness for a pharma manufacturing firm

Quote:
Originally Posted by Quality Girl View Post

I'm working an a project of permanent inspection readiness for a pharma manufacturing firm. The idea being that we'd be ready to host an inspection should an regulatory agency appear at the door tomorrow. In an ideal world we would always be in this position, but realistically it's not always the case. Has anyone managed a project like this before, and if so how did you approach it?
Clare
This might seem like oversimplification, but you can make a list of the things that keep you from being audit-ready and then devise a plan to address them. This is more important than it might seem because the fact that you state that you're not ready for audit means that you're not in compliance with the requirements or expectations. The goal should be a system that's in compliance at all times.
__________________
Some men are born mediocre, some men achieve mediocrity, and some men have mediocrity thrust upon them.-- Joseph Heller
Reply With Quote
  #4  
Old 19th December 2006, 12:31 PM
Sidney Vianna's Avatar
Sidney Vianna Sidney Vianna is offline
Post responsibly

Registration Date: Oct 2001
Location: Long Beach, CA - USofA
 
Posts: 4,951
Thanks Given to Others: 688
Thanked 1,912 Times in 1,083 Posts
Karma Power: 467
Karma: 16797
Sidney Vianna is appreciated, and has over 1700 Karma points.
Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.Sidney Vianna is appreciated, and has over 1700 Karma points.
Default Re: Permanent Inspection Readiness for a pharma manufacturing firm

I don't know if it would apply in the UK, but in the US, many retired FDA Inspectors work as consultants to assist organizations being ready for scheduled and unscheduled audits. You might consider something along those lines.

But I agree with the feedback you have been given so far. Your mind set should be one that it is possible to be in compliance with the requirements, in a cost effective manner, at all times. If your organization has a defeatist approach in terms of compliance with requirements, you will always be doing window dressing in preparation for an audit.
__________________
Fighting organizational dysfunction, one post at a time.
Reply With Quote
  #5  
Old 19th December 2006, 01:58 PM
BradM's Avatar
BradM BradM is offline
Super Moderator

Registration Date: Sep 2006
Location: Arlington,Texas
 
Posts: 3,385
Thanks Given to Others: 814
Thanked 850 Times in 607 Posts
Karma Power: 274
Karma: 9659
BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.
BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.
Default Re: Permanent Inspection Readiness for a pharma manufacturing firm

Quote:
Originally Posted by Quality Girl View Post

I'm working an a project of permanent inspection readiness for a pharma manufacturing firm. The idea being that we'd be ready to host an inspection should an regulatory agency appear at the door tomorrow. In an ideal world we would always be in this position, but realistically it's not always the case. Has anyone managed a project like this before, and if so how did you approach it?
Clare
Hello, quality girl!

Sorry, but my radar went way up on this one, and I may be reading too much into this. What regulatory agency(ies) would be entering your facility? Have you not mustered audits from these before?

I would think you should already have tried and true procedures. If you do, you are either compliant to those or not.

Are you conducting internal audits? How have they been going? Are all the observations been dealt with?

I may be envisioning a 'monster that don't need to be slain'. But there are a plethora of issues ranging from validation of equipment, sterility, storage, records retention, calibration, etc. I would think all of this needs to be addressed at some point.
__________________
Brad
My idea of housework is to sweep the room with a glance.
Reply With Quote
  #6  
Old 19th December 2006, 08:10 PM
Quality Girl Quality Girl is offline
E-Mails Invalid or Rejected

Registration Date: Dec 2006
Location: UK
 
Posts: 5
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 10
Quality Girl has less than 100 Karma points so far.
Default Re: Permanent Inspection Readiness for a pharma manufacturing firm

I think I gave the wrong impression. We have been audited by a number of agencies including the MHRA, FDA, ANVISA among others. We have never done badly in these inspections but what always seems to happen is a general air of panic in the run-up to an audit. I want to rule that out, and as you say internal audits and mock inspections are probable the best tool for that.
Reply With Quote
  #7  
Old 19th December 2006, 08:35 PM
Al Rosen's Avatar
Al Rosen Al Rosen is offline
Forum Moderator

Registration Date: Jun 2002
Location: Lawn Guyland
Age: 59
 
Posts: 3,101
Thanks Given to Others: 48
Thanked 390 Times in 272 Posts
Karma Power: 192
Karma: 4968
Al Rosen is appreciated, and has over 1700 Karma points.
Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.
Send a message via AIM to Al Rosen
Default Re: Permanent Inspection Readiness for a pharma manufacturing firm

Quote:
Originally Posted by Quality Girl View Post

I think I gave the wrong impression. We have been audited by a number of agencies including the MHRA, FDA, ANVISA among others. We have never done badly in these inspections but what always seems to happen is a general air of panic in the run-up to an audit. I want to rule that out, and as you say internal audits and mock inspections are probable the best tool for that.
It doesn't matter how ready you are, it seems panic always ensues.
__________________
Al
Reply With Quote
  #8  
Old 20th December 2006, 12:45 AM
BradM's Avatar
BradM BradM is offline
Super Moderator

Registration Date: Sep 2006
Location: Arlington,Texas
 
Posts: 3,385
Thanks Given to Others: 814
Thanked 850 Times in 607 Posts
Karma Power: 274
Karma: 9659
BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.
BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.BradM is appreciated, and has over 1700 Karma points.
Default Re: Permanent Inspection Readiness for a pharma manufacturing firm

Thank you for the follow-up. Now I can rest better

In my opinion, Al hit it on the head. This panic always seems to manifest itself. In my opinion, here are a few reasons:

1. Incompetent managers-getting mad at people when a process has been found to be deficient. Someone is to blame, and they are gonna find them! They do not deal well at all with auditors and their purpose.

2. Incompetent auditors- they are auditing out of their scope, they are not trained properly, not professional, don't write up the process/ standard, asking leading/cornering/ defensive questions, etc.

3. Audit training- along with internal audits, I have seen many times mock audits, and training on dealing with an auditor. Basically, how to keep all off of the defensive (as much as possible), being objective, not pointing fingers, etc.

4. Every audit I have ever been associated with, something is always noted. That's just the way it is. They will most probably note something in your audit. Hopefully, it's just a minor thing.

Some of this you cannot fix, some of it you may be able to deal with. In the end, the managers of the area can help you the most by making sure prior issues have been dealt with, and by dealing appropriately with audit findings.
__________________
Brad
My idea of housework is to sweep the room with a glance.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > National and International Business Standards > FDA (United States Food and Drug Administration) > Pharmaceuticals (21 CFR parts 210 & 211)

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Pharma Job Board - An internet Pharma-specific job site Wes Bucey Job Openings and Employment Opportunities 0 28th September 2009 07:18 PM
GMP question - New pharma/drug manufacturing facility certification timeline/sequence class08820 Pharmaceuticals (21 CFR parts 210 & 211) 8 5th September 2009 02:31 AM
Lean Manufacturing - Eliminating Inspection - Can Quality Survive? psyched1 Lean - Lean in Manufacturing and Services 49 16th January 2008 09:23 AM
Including Receiving Inspection to Dispatch for Manufacturing industry kedarg6500 APQP and PPAP 3 12th December 2007 09:12 AM
Outsourcing of Manufacturing Process? Pharma manufacturing intrestedparty ISO 9001 - Quality Management Systems Standard 11 16th April 2006 01:28 PM



The time now is 05:28 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts