The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 23rd March 2001, 03:36 PM
freeda
Unregistered Guest

 
Posts: n/a
Read This! Cpk higher than Cp - Explain the relationship and why this happens?

I'm a little embarrassed to ask this question, but it is one that is asked of me and I can't explain it.
We did a capability study on the straightness of some shafts. Our sample size was 200. We have a Cp value that is less than the Cpk.
Why does this happen?
I already know that the process is not capable. That is why we are doing the study, to find out just how uncapable it is.
We had two points out of tolerance and one on the dead high, the Cp was .95 and the Cpk was 1.00.
I haven't been able to find anything in any of my SPC books that explain what causes this.

BTW Marc,
I just wanted to say thanks for providing this site. And thanks to all that contribute to it. It has really helped me a lot.
Thanks

Reply With Quote

Sponsored Links
  #2  
Old 23rd March 2001, 03:58 PM
Ken K.
Unregistered Guest

 
Posts: n/a
What was the mean of your process?
What are your spec limits?
How are you calculating your values? (Excel, MINITAB, JMP, other package, by hand)
What is your estimate of sigma (though it shouldn't matter when comparing Cp & Cpk)

It can only be one of two things (I think):

1. The mean of your process is outside the process spec. limits, causing the MIN[(mean-LSL),(USL-mean)] to be larger than (USL-LSL)/2

2. Your formulas are incorrect
Reply With Quote
Sponsored Links

  #3  
Old 23rd March 2001, 04:26 PM
Al Dyer
Unregistered Guest

 
Posts: n/a
Question

Freeda,

I'm sure you will get more definitive explanations from this forum but here I go:

Cp = Rating of how much of the specification limits are being used.

Cpk = Rating of how close your process is to the expected/targeted value.

The higher the CP, the less of the spec. limits being used. The higher the Cpk the closer you are to the target.

You could be running a high Cp (good) but the process is running too close to a spec. limit which would give you a higher Cp than Cpk.

This will probably lead to the old discussion as to how a process can be in control but not be capable.

Input from experts hopefully forthcoming!

ASD...

[This message has been edited by Al Dyer (edited 23 March 2001).]
Reply With Quote
  #4  
Old 23rd March 2001, 05:17 PM
freeda
Unregistered Guest

 
Posts: n/a
I use CimWorks VisualSPC program to calculate the data.
The Mean is .00236
The Max is .007
The Min is .001
The USL is .005, since it is a unilateral tolerance (straightness), the LSL is NoLoSpec (this is what you put as your LSL in VisualSPC).
Reply With Quote
  #5  
Old 24th March 2001, 10:28 AM
Don Winton's Avatar
Don Winton Don Winton is offline
dWizard

Registration Date: Nov 1998
Location: Tullahoma, TN
Age: 53
 
Posts: 475
Thanks Given to Others: 0
Thanked 12 Times in 9 Posts
Karma Power: 63
Karma: 488
Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.
Spin!

freeda,

You failed to provide a value for dispersion, but I will try to help.

The distribution appears to be skewed right. With a mean of 0.00236 and 3 of 200 out or near the USL (more I am sure), this appears to be the case. However, without the data or values for skewness or kurtosis, I cannot know for sure.

If you are willing to provide the raw data (Excel or Tab Delimited Text), I may be able to provide a more complete analysis for you.

One other thing:

Calculation of predictable process capability indices is dependent on the statistical control of the process. If the process is not in statistical control, then the results of the study are subject to fluctuate unpredictably. The statistical control of the process can be studied using control charts. If the distribution is skewed right, the state of statistical control is in question.

Regards,

Don

------------------
I was better but I got over it.

[This message has been edited by dWizard (edited 24 March 2001).]
Reply With Quote
  #6  
Old 25th March 2001, 01:19 AM
Ken K.
Unregistered Guest

 
Posts: n/a
Oh, this is a one-sided specification.

To my knowledge, the Cp is not defined in this situation. You can't compare the process variation to the tolerance width if the tolerance is one-sided.

With an upper spec you would use the CPU as an estimate of Cpk (defined as the minimum of [CPL,CPU]), but Cp isn't defined.

CPU = (USL-mean)/3sigma

I can't find anything on the web about the formulas that CimWorks VisualSPC uses for one-sided Cp & Cpk. I'd strongly suggest you understand these formulas before using the software's output. Maybe call the supplier and ask for an explanation.

This is one of those cases where people really need to understand their software rather than blindly use it (no offence).
Reply With Quote
  #7  
Old 26th March 2001, 08:53 AM
freeda
Unregistered Guest

 
Posts: n/a
I already know what the formulas are. CimWorks provides that information to their customers. And I don't believe that I "blindly" use the software.
I was only looking for a good, simple explanation of why.
I tried to explain to the powers above that you can't look at Cp on a unilateral tolerance, but I couldn't come up with a good enough explanation for them.
Thanks to all that contributed, they now understand.

[This message has been edited by freeda (edited 26 March 2001).]
Reply With Quote
  #8  
Old 26th March 2001, 02:28 PM
Ken K.
Unregistered Guest

 
Posts: n/a
So how does it calculate Cp for a one-sided spec?
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Cpk / AQL relationship (Cpk tending towards AQL 1.0%) achorste Capability, Accuracy and Stability - Process, Machine, etc. 1 24th August 2009 07:19 AM
Relationship between Cp & Cpk kedarg6500 SPC Monitoring and Statistical Analysis Techniques 5 15th July 2007 08:30 AM
Cpk Help needed - Explain to me where I made a mistake silvestri Capability, Accuracy and Stability - Process, Machine, etc. 8 28th April 2007 12:48 PM
FMEA Ranking and Prioritization - Failure Modes with higher severity first? YKT FMEA and Control Plans 21 9th June 2003 02:29 PM
Is there any relationship between Cpk & Right First Time? First Pass Yield (FPY)? lee01 Capability, Accuracy and Stability - Process, Machine, etc. 4 19th May 2001 09:14 AM



The time now is 09:31 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts