The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Information Resources - Papers - Articles - Etc. > Definitions, Acronyms, Abbreviations and Interpretations

Elsmar Cove Forum Visitor Notices


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 1 votes, 5.00 average. Display Modes
  #1  
Old 30th March 2001, 12:34 AM
Leigh
Unregistered Guest

 
Posts: n/a
Question Cp Cpk Pp and Ppk Definitions - I'm doing SPC and Capability Analysis

Hi All,

I am fairly new to the world of Capability Analysis. My problem at the moment is the more I read the more my head spins. I’m slowly getting a hold on the concepts involved but I need help on a specific issue.

A customer of ours manufactures an electronic component for us. This component (an IC or integrated circuit) must meet over 150 parameters within well defined limits. (Each lot consists of about 2500 pieces). Therefore the supplier tests the IC prior to shipping and provides, as part of the test report, the capability analysis results for each parameter. The test processes are quite stable and the measured test results are generally centered within the limits. Below is his description of Cp and Cpk. To my understanding he is using actual standard deviation rather than estimated std as is required by Cp /Cpk formulas, and therefore I think are really descriptions of Pk and Ppk..

My question is: 1) Is his interpretation of Cp and Cpk below correct and relevant? 2) Is below actually a description for Pk and Ppk? and 3) Should he be using Cp or Pp in determining out process capability, and if so how?

Many thanks for any help offered…. Leigh


Definition of Cp
===========

Cp, the capability of a process, is determined by the width of the process distribution
relative to a set of limits. For a test program, this means the width of a distribution of
test results relative to the test limits. The standard measure of the width of a
distribution in statistics is the standard deviation (std_dev), so Cp must somehow
relate the standard deviation to the test limits:

Cp = min{ ((HTL-nominal)/(3*std_dev)) , ((nominal-LTL)/(3*std_dev)) }

with:
HTL = Higher Test Limit
LTL = Lower Test Limit
nominal = nominal value = (HTL+LTL)/2
std_dev = standard deviation of measured value

As the equation suggests, Cp is the number of standard deviations that will fit between
the upper and lower limits of a test. A standard convention is to scale the number of
standard deviations by multiplying by 6. This makes it easier to interpret the Cp value
in terms of 6 sigma quality goals. The correct interpretation of Cp is "the number of 6
sigma distribution which can be fit between the high test limit and low test limit".

In actually calculating Cp, Test Insight uses the distance between the nominal value
and the closest test limit. Because this distance covers only half the distribution, it
divides the distance by 3 sigma’s, not six. The end results, however, correspond to the
number of 6 sigma distributions that can fit between the limits.


Definition of Cpk
============

This measures the shift in the mean of a test away from its ideal position. If Cp is a
measure of the potential yield of a perfectly centered distribution, then we should
diminish Cp for every unit the mean deviates from the center of the test limits. It is
this combination of Cp and k which yields the Cpk statistic.

Cpk = Cp (1 - k)

with:
k = (nominal-mean) / (HTL-LTL)/2
mean = mean of measured value
Reply With Quote

Sponsored Links
  #2  
Old 30th March 2001, 08:10 AM
Al Dyer
Unregistered Guest

 
Posts: n/a
Lightbulb

Cp = Rating of how much of the specification limits are being used.

USL-LSL / 6 Est. Sigma (Rbard2)

Cpk = Rating of how close your process is to the expected/targeted value.

The lower of:

USL - Xbar / 3 Est. Sigma (Rbard2)

or

Xbar - LSL / 3 Est. Sigma (Rbard2)

The higher the CP, the less of the spec. limits being used. The higher the Cpk the closer you are to the target. For Pp and Ppk you would just replace the Rbard2 sigma with the sigma of the population (sigma hat). I'm not a pro so I'm sure some of the stat people can put in in better statistical terms.


[This message has been edited by Al Dyer (edited 30 March 2001).]
Reply With Quote
Sponsored Links

  #3  
Old 2nd April 2001, 03:02 PM
Rick Goodson's Avatar
Rick Goodson Rick Goodson is offline
Inactive Registered Visitor

Registration Date: Aug 2000
Location: Waukesha, Wisconsin, USA
 
Posts: 229
Thanks Given to Others: 0
Thanked 3 Times in 3 Posts
Karma Power: 42
Karma: 20
Rick Goodson has less than 100 Karma points so far.
Al,

You said it as well as anyone can.

Rick
Reply With Quote
  #4  
Old 2nd April 2001, 04:08 PM
Big Red
Unregistered Guest

 
Posts: n/a
Screw

What I was always taught was that Ppk is based on your actual standard deviation whereas Cpk is based on d2 or estimated standard deviation. That is why you use Ppk for short run studies and Cpk for long run studies. Most of our customers want us to submit Ppk for sample submissions only, then Cpk for regular production.
Reply With Quote
  #5  
Old 2nd April 2001, 07:53 PM
Al Dyer
Unregistered Guest

 
Posts: n/a
I guess I don't differentiate between the two all that much, meaning they need to be used together to get a better picture of the process. (We do use Ppk during submission and then move to Cpk when process is stable)

If I generate the same set of data and see a substantially (don't ask me to define substantially) higher Cpk than a Ppk it leads me to think that my subgroups are not picking up the "fliers" in the population therefore I have not identified/removed all of the special causes of variation in the process. At this point I would go back to the FMEA for further review.

ASD...
Reply With Quote
  #6  
Old 6th April 2001, 04:56 AM
Leigh
Unregistered Guest

 
Posts: n/a
Screw

Hi Guys...

Thanks for your responses, it has helped my understanding of this hard to grasp subject. And thanks for a great forum!!

Regards - Leigh
Reply With Quote
  #7  
Old 27th April 2006, 01:16 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,859
Thanks Given to Others: 1,895
Thanked 1,568 Times in 1,020 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11569
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Default

Cp and Cpk related discussion threads.

Also see: Cp and Cpk in the Elsmar Cove Wiki.
__________________
A Search is a terrible thing to waste!
One Test is Worth 1000 Expert Opinions - The plural of anecdote is not data.
We can't solve problems by using the same kind of thinking we used when we created them. - Unknown
Reply With Quote
Thanks to Marc for your informative Post and/or Attachment!
  #8  
Old 11th June 2009, 01:16 PM
Coleman Donnelly Coleman Donnelly is offline
Involved in Discussions

Registration Date: Sep 2007
Location: Cleveland Ohio
 
Posts: 81
Thanks Given to Others: 14
Thanked 2 Times in 2 Posts
Karma Power: 10
Karma: 15
Coleman Donnelly has less than 100 Karma points so far.
Default Re: Cp Cpk Pp and Ppk Definitions - I'm doing SPC and Capability Analysis

Quote:
Originally Posted by Leigh View Post

Hi All,

I am fairly new to the world of Capability Analysis. My problem at the moment is the more I read the more my head spins. I’m slowly getting a hold on the concepts involved but I need help on a specific issue.

A customer of ours manufactures an electronic component for us. This component (an IC or integrated circuit) must meet over 150 parameters within well defined limits. (Each lot consists of about 2500 pieces). Therefore the supplier tests the IC prior to shipping and provides, as part of the test report, the capability analysis results for each parameter. The test processes are quite stable and the measured test results are generally centered within the limits. Below is his description of Cp and Cpk. To my understanding he is using actual standard deviation rather than estimated std as is required by Cp /Cpk formulas, and therefore I think are really descriptions of Pk and Ppk..

My question is: 1) Is his interpretation of Cp and Cpk below correct and relevant? 2) Is below actually a description for Pk and Ppk? and 3) Should he be using Cp or Pp in determining out process capability, and if so how?

Many thanks for any help offered…. Leigh


Definition of Cp
===========

Cp, the capability of a process, is determined by the width of the process distribution
relative to a set of limits. For a test program, this means the width of a distribution of
test results relative to the test limits. The standard measure of the width of a
distribution in statistics is the standard deviation (std_dev), so Cp must somehow
relate the standard deviation to the test limits:

Cp = min{ ((HTL-nominal)/(3*std_dev)) , ((nominal-LTL)/(3*std_dev)) }

with:
HTL = Higher Test Limit
LTL = Lower Test Limit
nominal = nominal value = (HTL+LTL)/2
std_dev = standard deviation of measured value

As the equation suggests, Cp is the number of standard deviations that will fit between
the upper and lower limits of a test.
A standard convention is to scale the number of
standard deviations by multiplying by 6. This makes it easier to interpret the Cp value
in terms of 6 sigma quality goals. The correct interpretation of Cp is "the number of 6
sigma distribution which can be fit between the high test limit and low test limit".

In actually calculating Cp, Test Insight uses the distance between the nominal value
and the closest test limit. Because this distance covers only half the distribution, it
divides the distance by 3 sigma’s, not six. The end results, however, correspond to the
number of 6 sigma distributions that can fit between the limits.


Definition of Cpk
============

This measures the shift in the mean of a test away from its ideal position. If Cp is a
measure of the potential yield of a perfectly centered distribution, then we should
diminish Cp for every unit the mean deviates from the center of the test limits. It is
this combination of Cp and k which yields the Cpk statistic.

Cpk = Cp (1 - k)

with:
k = (nominal-mean) / (HTL-LTL)/2
mean = mean of measured value
Just so i understand this correctily - does this mean that as Cpk of 1 will mean 1 standard deviation of all of my product will fall within tollerance, and that approx. 40% of my product will fall out of my tollerance limits?
Reply With Quote
Thanks to Coleman Donnelly for your informative Post and/or Attachment!
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Information Resources - Papers - Articles - Etc. > Definitions, Acronyms, Abbreviations and Interpretations

Bookmarks

Visitors Currently Viewing this Thread: 2 (0 Registered Visitors and 2 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Questions on use of SPC, Ppk, Cpk during PPAP narakorn Capability, Accuracy and Stability - Process, Machine, etc. 10 27th February 2009 06:32 PM
Interpreting the common capability indices: Cp, Cpk, Pk, and Ppk. Tim Folkerts The Reading Room 5 17th February 2009 10:01 PM
Difference between Ppk (Preliminary), Cpk, Performance Capability bkarthikeyan SPC Monitoring and Statistical Analysis Techniques 2 2nd July 2007 07:30 AM
Process Capability (Cp and Cpk) - Definitions Marc Definitions, Acronyms, Abbreviations and Interpretations 0 25th July 2005 03:01 AM
What causes Ppk to be greater than Cpk when a basic capability analysis is run? Jon O Capability, Accuracy and Stability - Process, Machine, etc. 2 5th September 2001 06:46 PM



The time now is 03:18 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts