The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 13th May 2001, 08:07 PM
lee01 lee01 is offline
Courtesy Access

Registration Date: May 2001
Location: Europe and beyond (aka a nomad!)
Age: 32
 
Posts: 89
Thanks Given to Others: 2
Thanked 3 Times in 3 Posts
Karma Power: 36
Karma: 40
lee01 has less than 100 Karma points so far.
Quid Pro Quo Is there any relationship between Cpk & Right First Time? First Pass Yield (FPY)?

I have been given the task by the University I attend to determine the relationship between Cpk and 'Right First Time', but I have come up with a blank, If anyone could e-mail me any suggestions then I would be very thankfull.
Reply With Quote

Sponsored Links
  #2  
Old 13th May 2001, 08:25 PM
Al Dyer
Unregistered Guest

 
Posts: n/a
Lightbulb

I can't see a relationship.

"CpK" is quantified based upon data and requirements.

"Do it right the first time" is a "qualified" thought process based on subjective actions.

MHO

ASD...
Reply With Quote
Sponsored Links

  #3  
Old 13th May 2001, 09:33 PM
MSAFAI MSAFAI is offline
Inactive Registered Visitor

Registration Date: May 2001
Location: I.R.I.
Age: 43
 
Posts: 45
Thanks Given to Others: 4
Thanked 0 Times in 0 Posts
Karma Power: 35
Karma: 10
MSAFAI has less than 100 Karma points so far.
BIG Smile

Lee,

Is "Right First Time" the same as "First Pass Yield" (FPY)?

Reply With Quote
  #4  
Old 16th May 2001, 06:35 AM
Al Dyer
Unregistered Guest

 
Posts: n/a
Quote:
Originally posted by MSAFAI:
Lee,

Is "Right First Time" the same as "First Pass Yield" (FPY)?


Right the first time is the process of preventive action to ensure that potential failures are minimized, could you expand on FPY?

It may be a language thing but I read FTY as the first outcome of the process that may be controlled by GP-12 (early production containment).

ASD...
Reply With Quote
  #5  
Old 19th May 2001, 09:14 AM
MSAFAI MSAFAI is offline
Inactive Registered Visitor

Registration Date: May 2001
Location: I.R.I.
Age: 43
 
Posts: 45
Thanks Given to Others: 4
Thanked 0 Times in 0 Posts
Karma Power: 35
Karma: 10
MSAFAI has less than 100 Karma points so far.
BIG Smile

Quote:
Originally posted by Al Dyer:

Right the first time is the process of preventive action to ensure that potential failures are minimized, could you expand on FPY?

It may be a language thing but I read FTY as the first outcome of the process that may be controlled by GP-12 (early production containment).

ASD...

Dear Al,

If I'm not mistaken, FPY of a process is the ratio of the parts produced without defect "first time" to the total no of parts produced. In other words:

FPY = (parts produced without defects first time / total number of parts produced)*100

"Fisrt time" refers to products without a need for repair, rework etc.

If FPY is what our friend lee01 means, then it is not difficult to relate it to Cpk.

MSAFAI

Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Normalized vs. Rolled Throughput Yield - First Pass Yield metrics for our processes equesnel Manufacturing and Related Processes 6 8th September 2009 10:26 AM
Sampling and Yield calculation for a specific period of time (more than one batch) dkharif Inspection and Test, Sampling and Related Topics 2 17th March 2009 03:49 PM
Metrics to be put in place in our Test department - First Pass Yield and Paretos Jancen Quality Tools, Improvement and Analysis 6 10th November 2008 02:55 PM
FPY (First Pass Yeild) Calculations for Sampling RickRay Manufacturing and Related Processes 11 16th July 2008 04:30 PM
Relationship between Cp & Cpk kedarg6500 SPC Monitoring and Statistical Analysis Techniques 5 15th July 2007 08:30 AM



The time now is 02:25 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts