Ppk vs Cpk - A Good, clear explanation and How Mini-Tab Handles Certain Statistics
I'm almost embarrassed to ask the question, but I've not been able to find a good, clear explanation of the real difference between the Ppk and Cpk indices. Ppk, I know, is usually specified for short-term study results, and uses the calculated standard deviation in its determination. Cpk, on the other hand, is used for long-term study results, and uses the estimated standard deviation in its calculation. But can anyone give me the statistical rationale for this?
|

15th February 2000, 07:42 AM
|
 |
Your Elsmar Cove Host
Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
|
|
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Karma Power: 605
|
|
I'm embarrassed to answer after 3 years or so, so I guess we're belatedly even...
I was reviewing some posts during a search and found this oldie. Well, most questions get answers (sooner or later)...
I can't give you a statistical rational - maybe Don will see this and comment.
The differences are:
Pp
The Pp index is used to summarize a system's performance in meeting two-sided specification limits (upper and lower). Like Ppk, it uses actual sigma (sigma of the individuals), and shows how the system is actually running when compared to the specifications. However, it ignores the process average and focuses on the spread. If the system is not centered within the specifications, Pp alone may be misleading.
The higher the Pp value...
...the smaller the spread of the system’s output. Pp is a measure of spread only. A process with a narrow spread (a high Pp) may not meet customer needs if it is not centered within the specifications.
If the system is centered on its target value...
...Pp should be used in conjunction with Ppk to account for both spread and centering. Pp and Ppk will be equal when the process is centered on its target value. If they are not equal, the smaller the difference between these indices, the more centered the process is.
Ppk
Ppk is an index of process performance which tells how well a system is meeting specifications. Ppk calculations use actual sigma (sigma of the individuals), and shows how the system is actually running when compared to the specifications. This index also takes into account how well the process is centered within the specification limits.
If Ppk is 1.0...
...the system is producing 99.73% of its output within specifications. The larger the Ppk, the less the variation between process output and specifications.
If Ppk is between 0 and 1.0...
...not all process output meets specifications.
If the system is centered on its target value...
...Ppk should be used in conjunction with the Pp index. If the system is centered on its target value, Ppk and Pp will be equal. If they are not equal, the smaller the difference between these indices, the more centered the process is.
Pr
The Pr performance ratio is used to summarize the actual spread of the system compared to the spread of the specification limits (upper and lower). The lower the Pr value, the smaller the output spread. Pr does not consider process centering.
When the Pr value is multiplied by 100, the result shows the percent of the specifications that are being used by the variation in the process. Pr is calculated using the actual sigma (sigma of the individuals) and is the reciprocal of Pp. In other words, Pr = 1/Pp.
Cp
The Cp index is used to summarize a system's ability to meet two-sided specification limits (upper and lower). Like Cpk, it uses estimated sigma and, therefore, shows the system's potential to meet the specifications. However, it ignores the process average and focuses on the spread. If the system is not centered within the specifications, Cp alone may be misleading.
The higher the Cp value...
..the smaller the spread of the system’s output. Cp is a measure of spread only. A process with a narrow spread (a high Cp) may not meet customer needs if it is not centered within the specifications.
If the system is centered on its target value...
Cp should be used in conjunction with Cpk to account for both spread and centering. Cp and Cpk will be equal when the process is centered on its target value. If they are not equal, the smaller the difference between these indices, the more centered the process is.
Cpk
Cpk is a capability index that tells how well as system can meet specification limits. Cpk calculations use estimated sigma and, therefore, shows the system's "potential" to meet specifications. Since it takes the location of the process average into account, the process does not need to be centered on the target value for this index to be useful.
If Cpk is 1.0...
...the system is producing 99.73% of its output within specifications. The larger the Cpk, the less variation you will find between the process output and specifications.
If Cpk is between 0 and 1.0...
...not all process output meets specifications.
If the system is centered on its target value...
...Cpk should be used in conjunction with the Cp index. Cpk and Cp will be equal when the process is centered on its target value. If they are not equal, the smaller the difference between these indices, the more centered the process is.
Cpm
The Cpm index indicates how well the system can produce within specifications. Its calculation is similar to Cp, except that sigma is calculated using the target value instead of the mean. The larger the Cpm, the more likely the process will produce output that meets specifications and the target value.
Cr
The Cr capability ratio is used to summarize the estimated spread of the system compared to the spread of the specification limits (upper and lower). The lower the Cr value, the smaller the output spread. Cr does not consider process centering.
When the Cr value is multiplied by 100, the result shows the percent of the specifications that are being used by the variation in the process. Cr is calculated using an estimated sigma and is the reciprocal of Cp. In other words, Cr = 1/Cp.
[This message has been edited by Marc Smith (edited 15 February 2000).]
|
|
Thank You to Marc for your informative Post and/or Attachment!
|
|

15th February 2000, 11:05 AM
|
 |
Courtesy Access
Registration Date: Aug 1999
Location: Rochester, NY US
|
|
Posts: 759
Thanks Given to Others: 3
Thanked 17 Times in 15 Posts
Karma Power: 70
|
|
I'm not Don, but I'll open the door for Don to agree or disagree with what I've understood the difference to be
I think the key is the fact that the estimated std. dev used for Cpk, being R-bar/d2 from the control chart, and the PPk be an actual std. dev. calculated on 100 individuals. R-bar/ d2 only takes into account "within subgroup variation", not "between subgroup variation" which the Ppk calculation would. If "all" process variation is present within the subgroups, then Cpk and Ppk will be very close. Selection of your sampling plan for the control chart are very relavant to the R-bar/d2 calculation.
Picture a process which has extremely tight within subgroup variation, but due to other circumstances, has variation - possibly acceptable variation...when the room warms up, tool wear, batches of raw material, etc. 5 consecutive pieces may have a Range near zero, but during a 20 day period x-bar's move. R-bar /d2 is not a good estimate of overall process variation. I never calculate a Cpk or Ppk without looking at the control chart. Moreso than looking at the control chart, you need to know how the numbers are generated to determine appropriate "rational subgroups."
|

23rd March 2000, 04:27 PM
|
 |
dWizard
Registration Date: Nov 1998
Location: Tullahoma, TN
Age: 53
|
|
Posts: 475
Thanks Given to Others: 0
Thanked 12 Times in 9 Posts
Karma Power: 63
|
|
Laura,
You are correct. I have been on a ten-week hiatus while I sorted some things out. I am now back at work and trying to get caught up.
Personally, I find all this Cpk/Ppk stuff too confusing. For almost 15 years, the 'C' values were working just fine, then all this 'P' stuff popped up. I ignore the 'P' stuff and just keep with what I know. This is my take on the difference.
In 1990, while a member of the Technical Staff at Hughes Aircraft Company, a gentleman named Suozzi wrote an excellent paper on process capability. It is the basis for the CPK.PDF paper of mine posted here at the PDF zone.
For Cpk calculations to be used, an unbiased estimate of sigma should be used. Calculations for Cpk use either the sigma symbol of the word "sigma." More accurately, the symbol sigma-hat should be used, since this is the graphical symbol for an unbiased estimate of sigma. Typically, sample sizes greater than 60 give an unbiased estimate of sigma so close to the actual sigma that correction factors are not needed. When the sample size is less than 60, a correction factor (designated C4) is used to obtain a more accurate estimate of sigma (this is explained in Souzzi's paper as well as mine and is based on a derivation from Grant and Leavenworth). Since the inception of Cpk, all the work I have seen has used either sigma or sigma-hat as the representation of the standard deviation.
Going back to basic stats for a moment, the calculation for standard deviation has either one of two possibilities in the denominator: n-1 or n. In school, when you knew the data for the population, you used n. When you did not know the data for the population, you used n-1. The two different types of standard deviation were designated by either sigma (population) or a lower case s (sample). Thus, just using simple logic, you would assume that Cpk is calculated for the population.
I asked the question here once what the AIAG used (I stay as far away from their stuff as I can. Gives me headaches), as the symbol in their method of calculating Ppk and the answer was the lower case s. Thus, it would seem to indicate that Ppk is the process capability for a sample and Cpk is the process capability for the population.
For process capability taken from a control chart, the same rules apply. If you have readings on more than 60 samples, a correction is not needed, less than 60, it is. Personally, I do not like this method and prefer to calculate process capability based on observed data, not recorded data. But, that is just my preference.
And I still think all this is too confusing.
Regards,
Don
[This message has been edited by Don Winton (edited 29 March 2000).]
|

23rd March 2000, 05:57 PM
|
|
Involved in Discussions
Registration Date: Jul 2003
Location: Corydon, KY, USA
|
|
Posts: 45
Thanks Given to Others: 1
Thanked 0 Times in 0 Posts
Karma Power: 26 Karma: 10 
|
|
Now that certainly clears everything up! Thanks.
|

23rd March 2000, 06:00 PM
|
|
|
|
yea!!
is too confusing, only that i´m sure on ppap requirements gm wants to use a ppk > 1.67 or Cpk> 1.33.
so when i need to re-ppap my parts for some reason i presented to them ppk and guess what ???
they are happy !!!!
bye
|

23rd March 2000, 07:48 PM
|
 |
Your Elsmar Cove Host
Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
|
|
Posts: 15,857
Thanks Given to Others: 1,895
Thanked 1,566 Times in 1,018 Posts
Karma Power: 605
|
|
By the way, Don, your paper CPK.pdf has been downloaded 525 times so far this month alone.
|

29th March 2000, 09:20 AM
|
 |
dWizard
Registration Date: Nov 1998
Location: Tullahoma, TN
Age: 53
|
|
Posts: 475
Thanks Given to Others: 0
Thanked 12 Times in 9 Posts
Karma Power: 63
|
|
By the way, Don, your paper CPK.pdf has been downloaded 525 times so far this month alone.
I am glad some are finding it useful. Or at least, I hope they are.
Regards,
Don
[This message has been edited by Don Winton (edited 29 March 2000).]
|
Lower Navigation Bar
|
|
|
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|