The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 22nd June 2000, 06:06 PM
Dura Guy
Unregistered Guest

 
Posts: n/a
Laughing Increased positional tol. due to departure from MMC (Bonus)and calculation of Ppk/Cpk

We are in a bit of a dilema. Engineering and Quality are arguing about the use of "bonus" tolerance when calculating Ppk/Cpk values. One subcommittee member of ASME Y14.5M-1994 said that this is used only for building functional gages or in individual layouts, not for capability studies. I'm seeking a second opinion. I have been unable to find any basis for this in the standard. The closest I have come is on page 85 on the note after section 5.3.2.2, but this is vague.

Thanks,

Dura Guy
Manufacturing Engineer
Reply With Quote

Sponsored Links
  #2  
Old 22nd June 2000, 06:10 PM
smith man
Unregistered Guest

 
Posts: n/a
Wow that is tough! there is two sides to this.

What about tolerance don't they understand? Bonus smonus bolonus, IT IS STILL TOLERANCE IS IT NOT?

However, feature amy change and that is not what you are testing, you are testing POSITION not feature capability.

what a conumdrum!!!!!!!
Reply With Quote
Sponsored Links

  #3  
Old 23rd June 2000, 11:58 PM
Spaceman Spiff's Avatar
Spaceman Spiff Spaceman Spiff is offline
Inactive Registered Visitor

Registration Date: Mar 1999
Location: FL
Age: 44
 
Posts: 73
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 45
Karma: 10
Spaceman Spiff has less than 100 Karma points so far.
I Say...

Quality Joe, I had to disagree with you. There is a method to calculate capability with of true positions that I found. In an article published in 1991 by Glenn Gruner in Quality Engineering Magazine, he illustrated how to perform such calculation. This method is the combination of feature size and feature location that is critical, not the separate components.
TPa = TPm - (Bonus Tolerance)
TPa = TPm - (MMC-Xf)
TPa = TPM - MMC + Xf
where
TPa = Adjusted true position
TPm = Measured true position
Xf = Measured feature size

The procedure is, for example, a 100 piece sample size:
1) Calculate TPa for each of the 100 samples
2) Take the average of TPa (or XbarTPa)
3) Use conventional Cpk formula,
Cpk = (USL - XbarTPa)/3*s

According to the author, similar application could be made for tolerances specified at the LMC of the feature and when bonus tolerance is gained as one or more datum depart from MMC (or LMC).

Anyway, it was an interesting article. Hope this helps, Dura Guy.

Reply With Quote
  #4  
Old 24th June 2000, 01:39 AM
quality joe
Unregistered Guest

 
Posts: n/a
In general, you can not use "bonus" tolerance in calculating capability. The reason for this is the feature that is varying from MMC is what is giving you the bonus tolerance. Therefore, unless you can guarantee that the feature size will never result in less bonus tolerance than when you did the capability assessment, you MAY NOT use bonus tolerance.

However, if you can put in controls to insure that the size of the feature will never vary to take away bonus tolerance (i.e. making sure a punch is nominal or higher or a drill bit can never be below a certain exact size) you may use bonus tolerance.

I would say that a manufacturer of product that needs to use bonus tolerance to validate a positional Cpk study is playing with fire. You should either see if relief can be given from design or get a manufacturing engineer that knows what he or she is doing. The ME has be astute enough to ensure that the correct processes are in place without using the bonus tolerance as a crutch. That "crutch" will burn ya every time!

Joe Quality
Reply With Quote
  #5  
Old 18th July 2000, 10:33 AM
Steven Truchon's Avatar
Steven Truchon Steven Truchon is offline
Courtesy Access

Registration Date: Jul 2000
Location: Fort Lauderdale, FL USA
Age: 54
 
Posts: 116
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 40
Karma: 10
Steven Truchon has less than 100 Karma points so far.
Spaceman, I tried a couple of models using what you presented and I am having trouble getting it to produce a valid result. Did you write it as it was originally written or is my coconut just being too thick on this subject? (LOL)
Reply With Quote
  #6  
Old 20th July 2000, 02:22 PM
billsfan
Unregistered Guest

 
Posts: n/a
Covering Ass

We need to hear from "Batman" here (forum contributor). I used to work with Batman & he had a neat little formula to report capabilty on a MMC / LMC features. He reported it as "percent tolerance used". I really need him to explain it!!! All I know is, we worked for an automotive supplier (tier 1 & 2) and used this many, many times. It usually involved a call to our SQA to explain how the numbers were derived, but never a problem! Sorry I'm of no help in explaining the "hows". I always relied on "Batman". Now I'm without an action hero!
Peace.....out!
Reply With Quote
  #7  
Old 25th July 2000, 05:47 AM
johno
Unregistered Guest

 
Posts: n/a
Instead of adding the bonus to the tolerance, which could result in 20 different tolerances if measuring 20 parts, subtract the bonus from the measurment. One ends up with a fixed tolerance zone, although some never get over the negative lower limit for position which is a consequence of maximum possible bonus and perfect position. I presented a paper on the technique a number of years back at a conference.
Reply With Quote
  #8  
Old 25th May 2001, 12:24 PM
David McGan David McGan is offline
Involved in Discussions

Registration Date: Jul 2003
Location: Corydon, KY, USA
 
Posts: 45
Thanks Given to Others: 1
Thanked 0 Times in 0 Posts
Karma Power: 26
Karma: 10
David McGan has less than 100 Karma points so far.
Send a message via Yahoo to David McGan
Question

I'm finding a lot of interesting information here, but I'm still confused! Before capability can be determined, we first must know that the process is in control. Is there any special consideration for characteristics associated with bonus tolerances? (I know "specifications" don't have anything to do with "control"). So, if I'm plotting a measurement, do I chart only the actual measurement result without any consideration for potential "bonus" values?
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Cpk Calculation - Tolerance to maintain 1.33 & 1.67 Cpk respectively gianni Capability, Accuracy and Stability - Process, Machine, etc. 20 24th July 2009 11:23 AM
Calculation of Cpk and Ppk for an unstable process morteza SPC Monitoring and Statistical Analysis Techniques 7 29th December 2008 10:15 AM
Cpk vs Ppk - Which should you use and How to Calculate Cpk and Ppk Nitin Sharma SPC Monitoring and Statistical Analysis Techniques 25 13th October 2008 07:44 PM
Ppk/Cpk for geometrical true position of hole with MMC sinned Capability, Accuracy and Stability - Process, Machine, etc. 15 13th December 2006 10:59 PM
Validation of Cpk and Ppk calculations - Sheet to check Cpk and Ppk values Howard Atkins SPC Monitoring and Statistical Analysis Techniques 0 20th February 2006 03:41 AM



The time now is 02:02 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts