The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > SPC Monitoring and Statistical Analysis Techniques


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 1 votes, 5.00 average. Display Modes
  #1  
Old 26th August 1999, 08:59 AM
Steven Sulkin
Unregistered Guest

 
Posts: n/a
Question Precontrol and Process Capability - CNC Lathes that run small batches - Short Runs

Trying to determine what type of control chart to apply...

We two CNC Lathes that run small batches. These batches may be of different material and configurations which require setups between runs. There is a lot of variation between runs (due to setups) and very little variation within runs (variation in lathe).

I would appreciate a recommendation. If you successfully implemented SPC in this circumstance an example would also be appreciated.

Reply With Quote

Sponsored Links
  #2  
Old 26th August 1999, 12:20 PM
Roger Eastin Roger Eastin is offline
An Original Cover!

Registration Date: Dec 1998
Location: Greenville, SC
 
Posts: 471
Thanks Given to Others: 0
Thanked 4 Times in 4 Posts
Karma Power: 54
Karma: 45
Roger Eastin has less than 100 Karma points so far.
We had a similar situation and used some of the "short-run" SPC techniques to help us. It requires, among other things, to know the sigma of each "within set-up" run. By normalizing the "gross sigma" for the process, you can have one set of modified control limits for each NC machine. This technique allows you to focus on the machine and not just the part that you are fabricating. We used this technique years back and it worked. You do lose some resolution on the control limits, but we found that the gains outweighed the loss due to resolution. Anyway, check out some books on this topic in the ASQ Publications catalogue.
Reply With Quote
Sponsored Links

  #3  
Old 26th August 1999, 12:33 PM
Don Winton's Avatar
Don Winton Don Winton is offline
dWizard

Registration Date: Nov 1998
Location: Tullahoma, TN
Age: 53
 
Posts: 475
Thanks Given to Others: 0
Thanked 12 Times in 9 Posts
Karma Power: 63
Karma: 488
Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.Don Winton is appreciated, and has over 400 Karma points.
Question

Quote:
Trying to determine what type of control chart to apply
I am not sure I can help here. Control chart applications are very dependent on usage. It sounds as if your chart is varying across setups, but I need more details.

There are some alternatives to the traditional control chart in this type (small run) which may be of help. Under the assumption that each run is different, you may want to look at a pre-control type of technique.

Perhaps I could be more help if additional details were provided. Or, perhaps someone else has had this experience. Personally, I have found control charts for short runs rather, in a word, lacking.

Regards,
Don

------------------
Just the ramblings of an Old Wizard Warrior.
Reply With Quote
  #4  
Old 26th July 2001, 03:10 PM
dmac
Unregistered Guest

 
Posts: n/a
Question precontrol and process capability

Are there any statistical formulas that relate precontrol data to process capability indices?
Reply With Quote
  #5  
Old 26th July 2001, 03:55 PM
D.Scott's Avatar
D.Scott D.Scott is offline
Super Moderator

Registration Date: Feb 2001
Location: Wellington, OH USA
Age: 69
 
Posts: 1,604
Thanks Given to Others: 80
Thanked 289 Times in 172 Posts
Karma Power: 149
Karma: 4082
D.Scott is appreciated, and has over 1700 Karma points.
D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.
Send a message via Yahoo to D.Scott
dmac - I am not sure this is what you are looking for but here it is anyway for what it is worth.

To establish a pre-control chart, it must be assumed that the process is normally distributed with a Cpk of at least 1.0. It can then be statistically shown that 86% of the product will be within the control lines with 7% in each of the other sections.

As there is no statistical data taken or analyzed, it is important to only use pre-control on a process known to be stable.

I am sure there are others who can add a lot to this but at least it may help to get you started.

Dave
Reply With Quote
  #6  
Old 31st July 2001, 01:53 AM
MSAFAI MSAFAI is offline
Inactive Registered Visitor

Registration Date: May 2001
Location: I.R.I.
Age: 43
 
Posts: 45
Thanks Given to Others: 4
Thanked 0 Times in 0 Posts
Karma Power: 35
Karma: 10
MSAFAI has less than 100 Karma points so far.
Yin Yang

1- Check normality by using a Histogram of your data.

2- You can have a ROUGH estimate of process capability by taking standard deviation of your data and calculating Ppk.

3- I don't know to what extent you can rely on the above calculation, because using a Pre-control chart you cannot be sure your process is under control (a prerequisit to determining capability)

Any other ideas?

MSAFAI
Reply With Quote
  #7  
Old 7th December 2002, 05:40 AM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,860
Thanks Given to Others: 1,896
Thanked 1,570 Times in 1,021 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11579
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Let Me Help You

Seeking any other details on Pre-Control. Found this here FYI:

http://Elsmar.com/Forums/showthread.php?t=5156
__________________
A Search is a terrible thing to waste!
One Test is Worth 1000 Expert Opinions - The plural of anecdote is not data.
We can't solve problems by using the same kind of thinking we used when we created them. - Unknown
Reply With Quote
  #8  
Old 8th December 2002, 06:00 AM
Chemman Chemman is offline
Inactive Registered Visitor

Registration Date: Oct 2002
Location: Southwest VA
 
Posts: 9
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 29
Karma: 10
Chemman has less than 100 Karma points so far.
Question

Steve: We two CNC Lathes that run small batches. These batches may be of different material and configurations which require setups between runs. There is a lot of variation between runs (due to setups) and very little variation within runs (variation in lathe).

I have a similar problem, but unable to use any SPC that I know of. We take a batch of material, mold it, cure it in an oven under clamped pressure, grind it, scorch it, then take 5 pcs/batch (batch = approx 3000 parts) and do various physical tests on it. SPC is not done on the process, but the end result of these operations.
So for example, the density of the part is measured per batch as a subgroup. This charateristic is affected by every operation above beginning with the material batch, potentially processed on 1 of 3 presses, through 1 of 6 ovens, 4 clamping stations,etc. It is not possible to keep these separate and plot individually. Each control chart subgroup is from a different batch of material and off a multitude of processes and equipment.

Limits are very tight from Rbar, which makes the charts look terrible from subgroup to subgroup variation, but still very controlled compared to the specifications. This is hard to explain to vistors that do not understand the complexity of the problem.

To me, it seems that these could be considered different setups, processes, or population just as you would expect a mean shift for a different lot of steel in a fineblank press.

When things appear to go out of control, there is not much you can do to react to the problem. There is no adjustment at this point in the process because the parts are already made. Because this happens very frequently and because of the huge number of influencing factors, you can't investigate everything and record the reaction as required for OUC conditions. Some real assignable causes can be determined after a week or two if your lucky, others are just ellusive despite DOE after DOE. I have began to think that this level of variation is normal, little more can be done to improve it, and that a lot of my problem is the use of control charts that shouldn't be applied to this situation. I think standard Xbar & R charts are inappropriate here. Anyone agree or am I out in left field?

Thanks,
Chemman
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > SPC Monitoring and Statistical Analysis Techniques

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
How to implement SPC in a CNC m/c shop processing small batches of 'one timer' jobs? Joe_1 SPC Monitoring and Statistical Analysis Techniques 9 18th February 2009 06:59 PM
Machine Capability Studies on CNC Lathes DWPOZE SPC Monitoring and Statistical Analysis Techniques 34 29th March 2008 02:08 PM
Example - PFMEA for Machined Parts on CNC Mills & Lathes MTECD FMEA and Control Plans 3 11th October 2006 11:14 AM
CNC test pieces for milling and turning - I need to run a process capability study Brian Hunt ISO 17025 - Calibration, Measurement Gages and Test Laboratories 2 6th May 2004 02:58 PM
SPC for Short Runs (Control Limits) vs. Precontrol charts (Specification Limits) Don Winton SPC Monitoring and Statistical Analysis Techniques 7 10th October 1998 01:45 AM



The time now is 03:35 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts