The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 4th August 2001, 05:23 AM
MSAFAI MSAFAI is offline
Inactive Registered Visitor

Registration Date: May 2001
Location: I.R.I.
Age: 43
 
Posts: 45
Thanks Given to Others: 4
Thanked 0 Times in 0 Posts
Karma Power: 35
Karma: 10
MSAFAI has less than 100 Karma points so far.
I Say... High Cpk's and Control Charts

Hi everybody,

In processes, where we have high Cpk's (like 2 or more), is it justified to stop using control charts (like X-bar and R) and instead, calculate Cpk every month or so ?


Thanks on beforehand.

[This message has been edited by MSAFAI (edited 04 August 2001).]
Reply With Quote

Sponsored Links
  #2  
Old 6th August 2001, 10:24 AM
Rick Goodson's Avatar
Rick Goodson Rick Goodson is offline
Inactive Registered Visitor

Registration Date: Aug 2000
Location: Waukesha, Wisconsin, USA
 
Posts: 229
Thanks Given to Others: 0
Thanked 3 Times in 3 Posts
Karma Power: 42
Karma: 20
Rick Goodson has less than 100 Karma points so far.
MSAFAI,

It depends on why you are running control charts to begin with. If customer mandated you need to discuss it with the customer. Even if you decide to discontinue them I would not leave the process run without some checks. You might consider pre-control charts as an alternative.

Rick
Reply With Quote
Sponsored Links

  #3  
Old 6th August 2001, 11:22 AM
AJLenarz AJLenarz is offline
Involved in Discussions

Registration Date: Feb 2001
Location: Canton, Ohio
Age: 38
 
Posts: 47
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 36
Karma: 10
AJLenarz has less than 100 Karma points so far.
MSAFAI,

I agree with Rick. It would not be wise to totally abandon process monitoring. If you have a high CPK, you may want to consider reducing the frequency of inspection and charting (with the consent and acknowledgement of the customer of course).

Also, the comment was made to stop control charts and calculate CPKs every month or so. The SPC manual’s definition of CPK is: “The capability index for a stable process…”. If you discontinue the use of the SPC chart then you will not know if your process is stable and capable. If you don’t know if your process is capable, can you calculate and report a CPK value?
Reply With Quote
  #4  
Old 6th August 2001, 02:27 PM
MSAFAI MSAFAI is offline
Inactive Registered Visitor

Registration Date: May 2001
Location: I.R.I.
Age: 43
 
Posts: 45
Thanks Given to Others: 4
Thanked 0 Times in 0 Posts
Karma Power: 35
Karma: 10
MSAFAI has less than 100 Karma points so far.
Lightbulb

Dear Rick

Thanks for your input.
1- In this specific case customer has not mandated SPC. Actually, in my country OEM's are just starting to define special characteristics and SPC for them.

2- I didn't mean leave the process without any control. I meant just not to use control CHARTS. Normal periodic checks, of course, remain.

Thanks again
MSAFAI
Reply With Quote
  #5  
Old 6th August 2001, 02:29 PM
MSAFAI MSAFAI is offline
Inactive Registered Visitor

Registration Date: May 2001
Location: I.R.I.
Age: 43
 
Posts: 45
Thanks Given to Others: 4
Thanked 0 Times in 0 Posts
Karma Power: 35
Karma: 10
MSAFAI has less than 100 Karma points so far.
Lightbulb

Dear AJLenarz,

Thanks for your comment.

About calculating Cpk on stable processes, I agree with you.

But for calculating Cpk we usually use control chart (at least for 20-25 subgroup) to establish control, then we proceed to Cpk calculation.

Thanks again,
MSAFAI

[This message has been edited by MSAFAI (edited 06 August 2001).]
Reply With Quote
  #6  
Old 6th August 2001, 06:39 PM
Al Dyer
Unregistered Guest

 
Posts: n/a
Hehehe...

Too all,

Would and X-Bar MR chart be applicable in a case when stability and capability have been proven over time and special causes removed from the process?

Also, if applicable, could the variable control chart be replaced by an attribute chart under the same circimstances?

If so or not, why?

ASD...
Reply With Quote
  #7  
Old 8th August 2001, 11:21 AM
MSAFAI MSAFAI is offline
Inactive Registered Visitor

Registration Date: May 2001
Location: I.R.I.
Age: 43
 
Posts: 45
Thanks Given to Others: 4
Thanked 0 Times in 0 Posts
Karma Power: 35
Karma: 10
MSAFAI has less than 100 Karma points so far.
Default

Guys,

by accident, I found an interesting forum discussion from 1999. Guess where?
http://Elsmar.com/ubb/Forum10/HTML/000058.htm

The same subject is discussed, with good inputs from Don Winton.

Regards
MSAFAI
Reply With Quote
  #8  
Old 11th August 2001, 02:23 PM
MSAFAI MSAFAI is offline
Inactive Registered Visitor

Registration Date: May 2001
Location: I.R.I.
Age: 43
 
Posts: 45
Thanks Given to Others: 4
Thanked 0 Times in 0 Posts
Karma Power: 35
Karma: 10
MSAFAI has less than 100 Karma points so far.
Quote:
Originally posted by Al Dyer:
Too all,

Would and X-Bar MR chart be applicable in a case when stability and capability have been proven over time and special causes removed from the process?

Also, if applicable, could the variable control chart be replaced by an attribute chart under the same circimstances?

If so or not, why?

ASD...
Dear Al,

1- As far as I know, X-MR is used in special cases where taking more than one sample each time is not practical (like in a very slow process).

If you mean X-MR can reduce sampling, you can achive the same by less frequent sampling.

I'm not an expert in this, but I think X-MR has a disadvantage that it is sensitive to non-normality of the underlying distribution (central limit theorem does not hold anymore)

2- About using an attribute chart, I think you would get a flat line (zero defect) almost all the time, even if the process goes out of control (because of high Cp/Cpk)

I hope it makes sense

Regards
MSAFAI
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Adjusted Control Limits - Usage of Control Charts Ghemzie SPC Monitoring and Statistical Analysis Techniques 26 24th September 2009 12:15 PM
Control limits for one sided control charts using WECO rules jay1ph SPC Monitoring and Statistical Analysis Techniques 5 3rd June 2009 08:18 PM
Designing Control Charts - Variable with Small Variation and Tight Control Limit CJLee SPC Monitoring and Statistical Analysis Techniques 17 5th July 2008 02:03 AM
Need help with Control Charts, Control Limits (UPL, LPL, UCL) MechEng Student Research Questions - Any Educational Institution 3 6th May 2007 08:24 PM
Seeking: Control Charts - Xbar R control chart sxbalasu SPC Monitoring and Statistical Analysis Techniques 5 13th December 2002 05:36 PM



The time now is 04:36 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts