The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Management Review Process


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 1 votes, 5.00 average. Display Modes
  #1  
Old 1st September 1998, 07:47 AM
Lyndon Diong
Unregistered Guest

 
Posts: n/a
Default Management Review

How do we satisfy the requirement that "all elements of the entire quality system" are reviewed during Management Review? I was told that you may have to present the full text of QS-9000 at the Management Review. THANKS.
Reply With Quote

Sponsored Links
  #2  
Old 1st September 1998, 12:33 PM
Scott Knutson
Unregistered Guest

 
Posts: n/a
Default

Lyndon -
There is no requirement that the full text of QS9000 be presented at a review. The standard says you must review "all elements of the entire quality system". One way to do this would be to review your internal audit program during this "review". This would classify as reviewing the entire system. A lot of companies that I am familiar with approach it this way. Your management rep is also required to report on the quality system to your management for review. If you already have some sort of regular meeting concerning your company's performance, a brief note by the mgmt. rep about the quality system would also work.
Reply With Quote
Sponsored Links

  #3  
Old 2nd September 1998, 06:54 PM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,859
Thanks Given to Others: 1,895
Thanked 1,568 Times in 1,020 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11569
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Default

In essence, internal audits have to address your tier 2's - upon which your 'quality' systems are based. and the, as Scott said, your review will suffice.
Reply With Quote
  #4  
Old 14th December 1998, 04:49 AM
Lyndon Diong
Unregistered Guest

 
Posts: n/a
Default Management Review

We conduct a management review once every 3 months. Do the management review need to review all the elements of the entire quality system everytime?
Reply With Quote
  #5  
Old 14th December 1998, 08:52 AM
Marc's Avatar
Marc Marc is offline
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,859
Thanks Given to Others: 1,895
Thanked 1,568 Times in 1,020 Posts
Blog Entries: 4
Karma Power: 605
Karma: 11569
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Default

Nope. Not everything every time.
Reply With Quote
  #6  
Old 3rd March 1999, 11:10 AM
pgking
Unregistered Guest

 
Posts: n/a
Default Management Review

In the QS9000 requirement for management review, the keywords are "continuing suitability" and "effective". How have you defined/proven those characteristics of your quality system?

thanks

Paul
Reply With Quote
  #7  
Old 4th March 1999, 01:06 AM
Christian Lupo
Unregistered Guest

 
Posts: n/a
Default

Audit summaries, customer complaints, and corrective actions reviewed at management meetings gives our plant staff a good cross-section of how effective our quality system is doing. When non-conformances generated from these 3 system illustrate that we have a "problem" are it is a good indicator that we have a system(s) that is ineffective. In addition, machine yields, downtime(4.9/PM), scrap(4.13), and Cpk reports (4.9, 4.20) are also reviewed to determine the continuing suitability and effectiveness of our quality system. If any of these areas warrant more attention, the management review session become more frequent.

These are not the only indicators of ineffective systems, for example I had a quality engineer track all the design changes of product that have been approved for production. It seemed that there was an inordinate amount of design changes after the product was approved for production. The numbers were tracked and reported during management review, which indicated that communication between our design group (APQP problem)and process engineers was not as effective as it should be.
Reply With Quote
  #8  
Old 4th March 1999, 01:46 AM
Kevin Mader's Avatar
Kevin Mader Kevin Mader is offline
One of THE Original Covers!

Registration Date: Nov 1998
Location: Wallingford, CT USA
Age: 43
 
Posts: 1,158
Thanks Given to Others: 22
Thanked 63 Times in 43 Posts
Karma Power: 94
Karma: 1335
Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.Kevin Mader is appreciated, and has over 1300 Karma points.
Send a message via AIM to Kevin Mader
Default

Paul,

Suitability changes as the standard, voluntary or otherwise, changes. QS9000, 3rd edition is different than the 2nd edition. ISO 9000:2000 will be different than ISO 9000:1994. Your program needs to evolve with standard, otherwise your prgram becomes unsuitable. Suitability audits can be compared to desk studies of your Quality Program (your documents) where it is compared to the standards requirements. Suitability is also defined by you. You need to at a minimum satisfy the requirements of the standard, but many Quality Systems go beyond the standard requirements. For those items, you have to review and determine if these things are still practical for your organization. Are they value added operations, or once were and now are waste? You management group decides that.

Christian has given some good examples of measuring system effectiveness. You may want to ask senior management about other measures that they may like to see. This creates better buy in at these meetings. Other results of system effectiveness comes from Internal Quality Audits, where 'compliance' to your Quality Program is reviewed. Compliance audits determine how well you stick to the program. Another good point brought up by Christian is 'system ineffectiveness'. These are generally measures of nonconformance, the problems, where action plans or action plan committees can be determined during management review. I personally like to keep a balance (not necessarily 50/50) of problems and successes. If you heavily skew the mix of the meeting to either side, you end up having a Pep Rally or a Gripe Session (neither are really productive).

Regards, Kevin

Back to the group...

[This message has been edited by Kevin Mader (edited 03-03-99).]
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Management Review Process

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Management Review - Not all items covered during quarterly review. virajs ISO 9001 - Quality Management Systems Standard 18 7th September 2009 04:06 AM
Management Review Frequency - How Many Times of Management Review a Year? s_warin Management Review Process 29 25th September 2008 04:47 AM
Cl. 5.6.1: Quality Objectives Review - Part of Management Review? MVladimir Management Review Process 4 18th November 2004 12:38 PM
ISO 9000 Management Review in a Small Company - Everyone knows what's happening Don Winton Management Review Process 33 23rd September 2004 04:42 PM
Management Review - Frequency of the Management Review Meetings 6MARINE Management Review Process 4 16th March 2003 02:40 AM



The time now is 07:57 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts