The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Quality Tools, Improvement and Analysis
Forum Username


Elsmar Cove Forum Sidebar
Custom Search
Monitor the Elsmar Forum
Monitor New Forum Posts
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Sponsor Links







Donate and $ Contributor Forum Access
Sponsored Links
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's
International Quality Services

Atul's
Symphony Technologies

Marcelo Antunes'
SQR Consulting

Bob Doering's
Correct SPC - Precision Machining


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality

Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 1 votes, 5.00 average. Display Modes
  #1  
Old 4th April 2007, 07:53 AM
massfrompak's Avatar
massfrompak massfrompak is offline
Involved in Discussions

 
Registration Date: Apr 2007
Location: pakistan
Age: 31
 
Posts: 30
Thanks Given to Others: 10
Thanked 10 Times in 7 Posts
Karma Power: 28
Karma: 109
massfrompak is appreciated, and has over 100 Karma points.massfrompak is appreciated, and has over 100 Karma points.
Send a message via MSN to massfrompak Send a message via Yahoo to massfrompak
Unhappy Garment Sewing Standard Time Calculation Method

Can someone give me what are the procedures for conductiong time and motion study for work measurement.

Ahsan
Thanks to massfrompak for your informative Post and/or Attachment!

Sponsored Links
  #2  
Old 23rd July 2007, 02:53 AM
harry harry is offline
Super Moderator

 
Registration Date: Sep 2005
Location: Johore/Malaysia
 
Posts: 5,951
Thanks Given to Others: 1,405
Thanked 2,747 Times in 1,909 Posts
Blog Entries: 2
Karma Power: 662
Karma: 17675
harry is appreciated, and has over 1700 Karma points.
harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.
Re: Garment Sewing Standard Time Calculation Method

Attached is an interesting paper/study for those who are interested.
Attached Files: 1. Scan for viruses before using, 2. Please report any 'bad' files by Reporting this post, 3. Use at your Own Risk.
File Type: pdf dragcevic_full_revised.pdf (286.0 KB, 462 views)
Thanks to harry for your informative Post and/or Attachment!
Sponsored Links

  #3  
Old 21st September 2007, 03:59 AM
massfrompak's Avatar
massfrompak massfrompak is offline
Involved in Discussions

 
Registration Date: Apr 2007
Location: pakistan
Age: 31
 
Posts: 30
Thanks Given to Others: 10
Thanked 10 Times in 7 Posts
Karma Power: 28
Karma: 109
massfrompak is appreciated, and has over 100 Karma points.massfrompak is appreciated, and has over 100 Karma points.
Send a message via MSN to massfrompak Send a message via Yahoo to massfrompak
Unhappy Re: Garment Sewing Standard Time Calculation Method

Quote:
In Reply to Parent Post by harry View Post

Attached is an interesting paper/study for those who are interested.
Dear thanks for your informatic posted article on garment engineering.
can you please help me by providing more articles on garment engineering

thanks
Ahsan
  #4  
Old 9th October 2007, 11:51 PM
massfrompak's Avatar
massfrompak massfrompak is offline
Involved in Discussions

 
Registration Date: Apr 2007
Location: pakistan
Age: 31
 
Posts: 30
Thanks Given to Others: 10
Thanked 10 Times in 7 Posts
Karma Power: 28
Karma: 109
massfrompak is appreciated, and has over 100 Karma points.massfrompak is appreciated, and has over 100 Karma points.
Send a message via MSN to massfrompak Send a message via Yahoo to massfrompak
Re: Garment Sewing Standard Time Calculation Method

dear i have found something material on garment engineering methods.
see in attachment,
Attached Thumbnails
fin4.jpg   fin5.jpg  
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Quality Tools, Improvement and Analysis

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Time Study in a Sewing Production Line crazyray Manufacturing and Related Processes 3 31st July 2012 08:11 AM
TAKT Time Calculation - ASQ CSSBB Question QE Six Sigma 2 10th February 2009 01:19 PM
Need urgent Help on PMTS (Predetermined Motion Time System) - Garment Industry Md. Al Bokor Lean - Lean in Manufacturing and Services 2 30th December 2008 03:52 AM
MTBF (Mean Time Between Failures) Calculation kctrinh Reliability Analysis - Predictions, Testing and Standards 4 8th January 2008 03:46 AM
What is the Difference between Laboratory-developed method and non-standard method? CKW75 ISO 17025 and related Metrology Topics - Measurement Devices, Calibration and Test Laboratories 6 3rd December 2006 10:34 PM



The time now is 10:45 AM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, West Chester, Ohio 45069-1929
513 341-6272