The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > FMEA and Control Plans


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 6th October 1998, 04:30 PM
jasmeet
Unregistered Guest

 
Posts: n/a
Question RPN numbers in FMEA - It is not correct to go only by the RPN numbers when doing FMEA

Dont you think that it is not correct to go only by the RPN numbers when doing FMEA. Two problems having same RPN numbers would cost the company different amount of money in terms of rectification and lost sales....Moreover it is also possible that for one process the RPN number is low but the cost due to error would be high. In fact combinations of RPN and Quality Costing would be better. I am right now working on combining the RPN number and concept of Quality Costing and your advice can help me in my thesis.

Thanks
Jasmeet

Last edited by Wes Bucey; 15th January 2005 at 10:04 AM. Reason: fix minor typo in title for search bots
Reply With Quote

Sponsored Links
  #2  
Old 6th October 1998, 07:25 PM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,892
Thanked 1,564 Times in 1,017 Posts
Blog Entries: 4
Karma Power: 604
Karma: 11549
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Default

There's no problem with that. You can have a line item with an RPN of 300 which would be too expensive, or it may be a technology issue, or what ever, to address beyond what you already do to control and isolate the problem line item. You do not have to operate only on the top numbers. You DO have to be ready to explain which ones you're operating on and why and why any high numbers are not being acted on. I would expect comments within the FMEA.
Reply With Quote
Sponsored Links

  #3  
Old 15th January 2005, 12:54 AM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,892
Thanked 1,564 Times in 1,017 Posts
Blog Entries: 4
Karma Power: 604
Karma: 11549
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Default

Any contemporary comments appreciated!
Reply With Quote
  #4  
Old 15th January 2005, 02:23 AM
Murph095's Avatar
Murph095 Murph095 is offline
I make things happen

Registration Date: Nov 2004
Location: Toledo, Ohio
Age: 40
 
Posts: 53
Thanks Given to Others: 0
Thanked 4 Times in 2 Posts
Karma Power: 27
Karma: 295
Murph095 is appreciated, and has over 200 Karma points.Murph095 is appreciated, and has over 200 Karma points.Murph095 is appreciated, and has over 200 Karma points.
Default

Maybe I am not understanding the question here. FMEA's are used as a risk management tool and are a systematic method of identifying and preventing product and process problems before they occur. FMEA's are focused on preventing defects, enhancing safety, and increasing customer satisfaction. They are not put in place to identify which potential failures will incur the greatest cost. Just my .02



Murph
__________________
Ran into a chum with a bottle of rum and we wound up drinking all night!
Reply With Quote
  #5  
Old 15th January 2005, 04:55 AM
Al Rosen's Avatar
Al Rosen Al Rosen is offline
Forum Moderator

Registration Date: Jun 2002
Location: Lawn Guyland
Age: 59
 
Posts: 3,101
Thanks Given to Others: 48
Thanked 390 Times in 272 Posts
Karma Power: 192
Karma: 4968
Al Rosen is appreciated, and has over 1700 Karma points.
Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.
Send a message via AIM to Al Rosen
Default

Quote:
Originally Posted by Murph095

Maybe I am not understanding the question here. FMEA's are used as a risk management tool and are a systematic method of identifying and preventing product and process problems before they occur. FMEA's are focused on preventing defects, enhancing safety, and increasing customer satisfaction. They are not put in place to identify which potential failures will incur the greatest cost. Just my .02



Murph
All that is true but, when the cost becomes higher than the benefit of reducing the risk, you draw the line.
__________________
Al
Reply With Quote
  #6  
Old 15th January 2005, 10:15 AM
Murph095's Avatar
Murph095 Murph095 is offline
I make things happen

Registration Date: Nov 2004
Location: Toledo, Ohio
Age: 40
 
Posts: 53
Thanks Given to Others: 0
Thanked 4 Times in 2 Posts
Karma Power: 27
Karma: 295
Murph095 is appreciated, and has over 200 Karma points.Murph095 is appreciated, and has over 200 Karma points.Murph095 is appreciated, and has over 200 Karma points.
Default

Quote:
Originally Posted by Al Rosen

All that is true but, when the cost becomes higher than the benefit of reducing the risk, you draw the line.
Al,
I totally agree with that, that is true in any risk management tool. You would still need to identify the risk and have an action plan for it though even if the plan is scrap. If this is that much of a problem I would recommend they look into a little process or product re-engineering and ensure they have optimized their design.

Murph
__________________
Ran into a chum with a bottle of rum and we wound up drinking all night!
Reply With Quote
  #7  
Old 15th January 2005, 02:49 PM
Al Rosen's Avatar
Al Rosen Al Rosen is offline
Forum Moderator

Registration Date: Jun 2002
Location: Lawn Guyland
Age: 59
 
Posts: 3,101
Thanks Given to Others: 48
Thanked 390 Times in 272 Posts
Karma Power: 192
Karma: 4968
Al Rosen is appreciated, and has over 1700 Karma points.
Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.Al Rosen is appreciated, and has over 1700 Karma points.
Send a message via AIM to Al Rosen
Default

Quote:
Originally Posted by Murph095

Al,
I totally agree with that, that is true in any risk management tool. You would still need to identify the risk and have an action plan for it though even if the plan is scrap. If this is that much of a problem I would recommend they look into a little process or product re-engineering and ensure they have optimized their design.

Murph
You're right, but after 6 years, it is moot.
__________________
Al
Reply With Quote
  #8  
Old 15th January 2005, 04:42 PM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
 
Posts: 15,857
Thanks Given to Others: 1,892
Thanked 1,564 Times in 1,017 Posts
Blog Entries: 4
Karma Power: 604
Karma: 11549
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Send a message via AIM to Marc Send a message via Skype™ to Marc
Default

What about when the 'cost of the failure' is lives instead of money?
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > FMEA and Control Plans

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
FMEA RPN Recalculation after Actions are (or are not) Taken medalex FMEA and Control Plans 6 20th October 2009 05:56 PM
How to Calculate RPN in Design FMEA (DFMEA) vs. Process FMEA (PFMEA) nsraj FMEA and Control Plans 4 19th March 2008 10:50 AM
FMEA review, RPN reduction - Any "rule of thumb" as to what makes an RPN too high? rstocum FMEA and Control Plans 12 27th July 2006 09:23 AM
FMEA RPN Number and When to Recommend to Take Action Jaco FMEA and Control Plans 3 2nd March 2004 02:29 AM
FMEA RPN Corrective Action Plan sxbalasu QS-9000 - American Automotive Manufacturers Standard 1 24th September 2002 12:28 PM



The time now is 07:31 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts