6th October 1998, 04:30 PM
|
|
|
RPN numbers in FMEA - It is not correct to go only by the RPN numbers when doing FMEA
Dont you think that it is not correct to go only by the RPN numbers when doing FMEA. Two problems having same RPN numbers would cost the company different amount of money in terms of rectification and lost sales....Moreover it is also possible that for one process the RPN number is low but the cost due to error would be high. In fact combinations of RPN and Quality Costing would be better. I am right now working on combining the RPN number and concept of Quality Costing and your advice can help me in my thesis.
Thanks
Jasmeet
Last edited by Wes Bucey; 15th January 2005 at 10:04 AM.
Reason: fix minor typo in title for search bots
|

6th October 1998, 07:25 PM
|
 |
Your Elsmar Cove Host
Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
|
|
Posts: 15,857
Thanks Given to Others: 1,892
Thanked 1,564 Times in 1,017 Posts
Karma Power: 604
|
|
There's no problem with that. You can have a line item with an RPN of 300 which would be too expensive, or it may be a technology issue, or what ever, to address beyond what you already do to control and isolate the problem line item. You do not have to operate only on the top numbers. You DO have to be ready to explain which ones you're operating on and why and why any high numbers are not being acted on. I would expect comments within the FMEA.
|

15th January 2005, 12:54 AM
|
 |
Your Elsmar Cove Host
Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
|
|
Posts: 15,857
Thanks Given to Others: 1,892
Thanked 1,564 Times in 1,017 Posts
Karma Power: 604
|
|
Any contemporary comments appreciated!
|

15th January 2005, 02:23 AM
|
 |
I make things happen
Registration Date: Nov 2004
Location: Toledo, Ohio
Age: 40
|
|
Posts: 53
Thanks Given to Others: 0
Thanked 4 Times in 2 Posts
Karma Power: 27
|
|
Maybe I am not understanding the question here. FMEA's are used as a risk management tool and are a systematic method of identifying and preventing product and process problems before they occur. FMEA's are focused on preventing defects, enhancing safety, and increasing customer satisfaction. They are not put in place to identify which potential failures will incur the greatest cost. Just my .02
Murph
__________________
Ran into a chum with a bottle of rum and we wound up drinking all night!
|

15th January 2005, 04:55 AM
|
 |
Forum Moderator
Registration Date: Jun 2002
Location: Lawn Guyland
Age: 59
|
|
Posts: 3,101
Thanks Given to Others: 48
Thanked 390 Times in 272 Posts
Karma Power: 192
|
|
Quote:
|
Originally Posted by Murph095
Maybe I am not understanding the question here. FMEA's are used as a risk management tool and are a systematic method of identifying and preventing product and process problems before they occur. FMEA's are focused on preventing defects, enhancing safety, and increasing customer satisfaction. They are not put in place to identify which potential failures will incur the greatest cost. Just my .02
Murph
|
All that is true but, when the cost becomes higher than the benefit of reducing the risk, you draw the line.
__________________
Al
|

15th January 2005, 10:15 AM
|
 |
I make things happen
Registration Date: Nov 2004
Location: Toledo, Ohio
Age: 40
|
|
Posts: 53
Thanks Given to Others: 0
Thanked 4 Times in 2 Posts
Karma Power: 27
|
|
Quote:
|
Originally Posted by Al Rosen
All that is true but, when the cost becomes higher than the benefit of reducing the risk, you draw the line.
|
Al,
I totally agree with that, that is true in any risk management tool. You would still need to identify the risk and have an action plan for it though even if the plan is scrap. If this is that much of a problem I would recommend they look into a little process or product re-engineering and ensure they have optimized their design.
Murph
__________________
Ran into a chum with a bottle of rum and we wound up drinking all night!
|

15th January 2005, 02:49 PM
|
 |
Forum Moderator
Registration Date: Jun 2002
Location: Lawn Guyland
Age: 59
|
|
Posts: 3,101
Thanks Given to Others: 48
Thanked 390 Times in 272 Posts
Karma Power: 192
|
|
Quote:
|
Originally Posted by Murph095
Al,
I totally agree with that, that is true in any risk management tool. You would still need to identify the risk and have an action plan for it though even if the plan is scrap. If this is that much of a problem I would recommend they look into a little process or product re-engineering and ensure they have optimized their design.
Murph
|
You're right, but after 6 years, it is moot.
__________________
Al
|

15th January 2005, 04:42 PM
|
 |
Your Elsmar Cove Host
Registration Date: Jan 1996
Location: West Chester, Ohio - USA
Age: 59
|
|
Posts: 15,857
Thanks Given to Others: 1,892
Thanked 1,564 Times in 1,017 Posts
Karma Power: 604
|
|
What about when the 'cost of the failure' is lives instead of money?
|
Lower Navigation Bar
|
|
|
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|